1.677 ACERS COMMERCIAL COLONY ("M1 TRADE TOWER)
by Monnet Projects Developers · Faridabad
Not on our price list yet
Possession 31 Dec 2022 · as the developer declared it to HARERA
About this project
Key facts
- Carpet area
- about 8,551 sq ft
In m²
about 794.4 m², the average flat, as declared - Registered by
- MONNET PROJECT DEVELOPERS LTD.the company that filed it, for Monnet Projects Developers
- 5 Jun 2014Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 31 Dec 2022Possession, as declareddeclared to HARERA, read 29 Oct 2026
- 30 Sep 2026Registration valid toHARERA, read 3 Nov 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Air-conditioningCentrally AIR condition of common area and provision of chilled water supply only
- LiftsAs per drawing: KONE / OTIS / schindler or equivalent
- FloorsCommon area –vitrified tile / ceramic tile / indian marble internal- cement floor
- WallsExternal: plaster with paint & structural glazing. common area : plaster with paint
- BathroomsCommon toilets: • china WARE (hindware / parryware / or equivalent) • CP fittings: jaquar / ESS ESS / equivalent • wall : ceramic tiles • floor: vitrified tile / indian marble / indian granite tiles
- WindowsAluminum with glass
- Main doorBy occupier
- Electrical fittingsCommon area (LED/CFL, efficient light fixtures)
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR-37, VILLAGE ANANGPUR, BYPASS ROAD
The builder
- Other register states: 1
Questions buyers ask
Is 1.677 ACERS COMMERCIAL COLONY ("M1 TRADE TOWER) registered with HARERA?From the records · HARERA, read 3 Nov 2026
HARERA lists it as 226 OF 2017. The register’s record shows an end date of 30 Sep 2026. The register shows it as: Registration lapsed.
The source ↗What is the possession timeline for 1.677 ACERS COMMERCIAL COLONY ("M1 TRADE TOWER)?From the records · HARERA, read 3 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Dec 2022. Its registration runs to 30 Sep 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around 1.677 ACERS COMMERCIAL COLONY ("M1 TRADE TOWER)?From the records · HARERA, read 3 Nov 2026
1.677 ACERS COMMERCIAL COLONY ("M1 TRADE TOWER) is in Faridabad; the site address declared to HARERA is Sector-37, Village Anangpur, Bypass Road. Bhumiq has not measured its distance to the main roads and metro lines yet.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building 1.677 ACERS COMMERCIAL COLONY ("M1 TRADE TOWER)?From the records · HARERA, read 3 Nov 2026
1.677 ACERS COMMERCIAL COLONY ("M1 TRADE TOWER) is a Monnet Projects Developers project, registered by its company MONNET PROJECT DEVELOPERS LTD..
The source ↗Monnet Projects Developers's projects and court recordThe records
What the registers hold for 1.677 ACERS COMMERCIAL COLONY ("M1 TRADE TOWER): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration 226 OF 2017: Registration lapsed. The register’s record shows an end date of 30 Sep 2026.HARERA, read 3 Nov 2026 · See it on HARERA ↗
- Land licence 68 OF 2009 is on the DTCP register: Licence lapsed; the register prints its validity to 18 Nov 2024.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 5 Jun 2014, building plans 5 Jun 2014.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 8 HARERA files, with the dates we read them
- Registration no.
- 226 OF 2017
- Registration valid till
- 30 Sept 2026
- Declared possession
- 31 Dec 2022
Declared by the promoter to HARERA
- Land area
- 1.6577 (Acre) (6,708.47 sq m)
- FAR
- the application prints 300, which is not a ratio
- licence
- 68 of 2009 dated 19/11/2009
- Estimated project cost
- ₹86.39 crore
- Cost of land
- ₹15.28 crore
- Layout plan, declared approved (field 5a)
- 5 Jun 2014
- Building plans, declared approved
- 5 Jun 2014
- Construction to start
- 15 Sept 2016
- Completion declared for
- 31 Dec 2022
Declared inventory · 1 type
Declared inventory
- Apartment/Shops/Other Buildings · 145 units · 1,15,190 sq m carpet · 1 tower · total for 145 flats, about 794.4 m² each
Statutory approvals, as declared · 6
Statutory approvals, as declared
- I. LICENSE — declared: already been obtained (19 Nov 2009)
- II. ZONING PLAN — declared: already been obtained (13 Mar 2013)
- III. FOREST CLARIFICATION — declared: already been obtained (29 Nov 2016)
- IV. FRESH WATER ASSURANCE — declared: already been obtained (26 Oct 2016)
- V. CTE — declared: already been obtained (7 Dec 2016)
- VI. MINING PERMISSION — declared: already been obtained (7 Aug 2015)
On file with HARERA · 8 files
On file with HARERA (8)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileApprovals and clearances
DTCP licence
1 fileMoney
Accounts and finance
1 fileThe promoter’s papers
Declarations and affidavits
1 fileHARERA’s orders
HARERA’s orders
2 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
68 OF 2009 · MONNET SUGAR · FARIDABAD
Licence valid to 18 Nov 2024
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Panchkula bench · submitted 2 Jul 2019 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/1 · fetched 3 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
68 OF 2009: 3 parcels, 1.6578 acres in all, in Anangpur (hadbast 2), tehsil Badkhal.
The licence register prints the same licensed area, 1.66 acres.
- rectangle 1634, kila 1634/4 min2 bigha 3 biswa 15 biswansi
- rectangle 1634, kila 1634/4 min5 biswa 6 biswansi
- rectangle 1634, kila 1634/4 min4 biswa
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Faridabad, then the tehsil and the village: Anangpur (hadbast 2), tehsil Badkhal. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as rectangle 1634, kila 1634/4 min.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (8 in all), none is a building plan, a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/731 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Monnet Projects Developers
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Panchkula records showed the facts above. Statuses change. Verify at the portal for transactions.