Skip to content

ACE PALM FLOORS

by Bright Buildtech · Gurugram

Not on our price list yet

About this project

Key facts

Location
Gurugram
Carpet area
about 1,034 sq ft
In m²about 96.1 m², the average flat, as declared
Registered by
BRIGHT BUILDTECH PVT. LTD.the company that filed it, for Bright Buildtech
Timeline
  1. 2 Aug 2019Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 24 Mar 2021Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 29 Jun 2023Registration valid toHARERA, read 3 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • Air-conditioningHVAC - VRV / VRF AC units
  • KitchenFlooring - imported marble inclusions - international style modular kitchen with exhaust hob and chimney, granite countertop, stainless steel sink and CP fittings. wall - DADO/tiles up to 2' above counter and REST healthy acrylic emulsion paint. ceiling - OBD with designer cornice
  • Kitchen appliancesInternational style modular kitchen with exhaust hob and chimney
  • LiftsElevator - branded MRL type
  • WardrobesModular wardrobes with imported hardware
  • FloorsStilt - heavy DUTY anti skid tiles / cobblestone in parking area staircase - granite flooring basement - MATT finish ceramic / vitrified tiles balcony - MATT finish anti-skid ceramic tiles
  • WallsStilt - external texture paint basement - OBD balcony - weatherproof external texture paint staircase - external texture paint
  • BathroomsFlooring - MATT finish homogenous ceramic tiles / vitrified tiles wall - digital ceramic tiles fittings and fixtures : jaquar / grohe / duravit / kohler or equivalent ceiling - OBD / false ceiling / MR boards

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR 89-90,GURUGRAM

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • Other register states: 2

Questions buyers ask

Is ACE PALM FLOORS registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/449/181/2021/17. The register’s record shows an end date of 29 Jun 2023. The register shows it as: Registration lapsed.

The source ↗
How is the connectivity around ACE PALM FLOORS?From the records · HARERA, read 3 Nov 2026

ACE PALM FLOORS is in Gurugram; the site address declared to HARERA is Sector 89-90,Gurugram. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ACE PALM FLOORS?From the records · HARERA, read 3 Nov 2026

ACE PALM FLOORS is a Bright Buildtech project, registered by its company BRIGHT BUILDTECH PVT. LTD..

The source ↗Bright Buildtech's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for ACE PALM FLOORS: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/449/181/2021/17: Registration lapsed. The register’s record shows an end date of 29 Jun 2023.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 59 OF 2013 is on the DTCP register: Licence lapsed; the register prints its validity to 15 Jul 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 2 Aug 2019, building plans 24 Mar 2021.Declared to HARERA, read 29 Oct 2026
The court record of Bright Buildtech’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 59 OF 2013 lapsed

    Named in this project’s application. Valid to 15 Jul 2026; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 29 Jun 2023. HARERA Gurugram, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 13 HARERA files, with the dates we read them
Registration no.
GGM/449/181/2021/17
Registration valid till
29 Jun 2023

Declared by the promoter to HARERA

Land area
49.60 (Acre) (2,00,724.08 sq m)
FAR
1.45 proposed of 1.45 permissible
licence
59 of 2013 (17.07.2013)
Estimated project cost
₹424.87 crore
Cost of land
₹25.59 crore
Layout plan, declared approved (field 5a)
2 Aug 2019
Building plans, declared approved
24 Mar 2021
Declared inventory · 3 types

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type A · 246 units · 27,819 sq m carpet · total for 246 flats, about 113.1 m² each
  • APARTMENT/SHOPS/OTHER BUILDINGS Type B · 21 units · 2,703 sq m carpet · total for 21 flats, about 128.7 m² each
  • APARTMENT/SHOPS/OTHER BUILDINGS Type C · 153 units · 9,832 sq m carpet · total for 153 flats, about 64.3 m² each
Statutory approvals, as declared · 10

Statutory approvals, as declared

  • I. FOREST — declared: already been obtained (20 Jan 2014)
  • II. ELECTRICAL LOAD AVAILABILITY — declared: already been obtained (25 Jun 2020)
  • III. LICENCE — declared: already been obtained (12 Sept 2019)
  • IV. ENVIRONMENT CLEARANCE — declared: already been obtained (17 Oct 2014)
  • V. WATER SUPPLY — declared: already been obtained (11 Jun 2020)
  • VI. SERVICE ESTIMATE PLAN — declared: already been obtained (2 Aug 2019)
  • VII. LICENCE — declared: already been obtained (17 Jul 2013)
  • VIII. REVISED ENVIRONMENT CLEARANCE — declared: applied for but yet to receive (19 Oct 2019)
  • IX. BUILDING PLAN — declared: applied for but yet to receive (24 Mar 2021)
  • X. SEWAGE DISPOSAL — declared: applied for but yet to receive (25 Aug 2020)
On file with HARERA · 13 files

On file with HARERA (13)

Plans

Site plan

1 file
Approved Site Plan9 Mar 2021

Layout plan

1 file
Latest Layout Plan9 Mar 2021

Zoning plan

1 file
Zoning Plan9 Mar 2021

Demarcation plan

1 file
Demarcation Plan9 Mar 2021

Building plans

1 file
Approved Building Plans, Full Set9 Mar 2021

Services

Service plans

1 file
Service Plans on the Layout9 Mar 2021

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule9 Mar 2021

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration9 Mar 2021

Money

Accounts and finance

3 files
Cash Flow Statement9 Mar 2021CA Certificate on the Application’s Figures9 Mar 2021Non-Default Certificate from a CA9 Mar 2021

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit9 Mar 2021

HARERA’s orders

HARERA’s orders

1 file
Extension No. 01 of 2023 Dated 23.01.202315 Jun 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

59 OF 2013 · Orris Infrastructure Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 15 Jul 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 9 Mar 2021 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

59 OF 2013: 179 parcels, 101.0813 acres in all, in Hayatpur (hadbast 114, tehsil Harsaru) and Badha (hadbast 113, tehsil Manesar).

The licence register prints the same licensed area, 101.08 acres.

  • 8//21/24 kanalHayatpur (114)
  • 29//17 kanal 11 marlaHayatpur (114)
  • 29//10/15 kanal 7 marlaHayatpur (114)
  • 29//10/22 kanal 13 marlaHayatpur (114)
Show the other 175 parcels
  • 29//118 kanalHayatpur (114)
  • 29//12/12 kanal 13 marlaHayatpur (114)
  • 29//12/25 kanal 7 marlaHayatpur (114)
  • 29//198 kanalHayatpur (114)
  • 29//2/14 kanal 3 marlaHayatpur (114)
  • 29//201 kanalHayatpur (114)
  • 29//213 kanal 17 marlaHayatpur (114)
  • 29//213 kanal 10 marlaHayatpur (114)
  • 29//226 kanal 13 marlaHayatpur (114)
  • 29//237 kanal 7 marlaHayatpur (114)
  • 29//247 kanal 7 marlaHayatpur (114)
  • 29//25/1/12 kanal 2 marlaHayatpur (114)
  • 29//9/15 kanal 3 marlaHayatpur (114)
  • 29//9/22 kanal 13 marlaHayatpur (114)
  • 30//1/24 kanalHayatpur (114)
  • 30//10/11 kanal 11 marlaHayatpur (114)
  • 30//11/24 kanalHayatpur (114)
  • 30//128 kanalHayatpur (114)
  • 30//138 kanalHayatpur (114)
  • 30//148 kanalHayatpur (114)
  • 30//15/112 marlaHayatpur (114)
  • 30//15/26 kanal 16 marlaHayatpur (114)
  • 30//167 kanal 8 marlaHayatpur (114)
  • 30//178 kanalHayatpur (114)
  • 30//18/11 kanal 11 marlaHayatpur (114)
  • 30//18/26 kanal 9 marlaHayatpur (114)
  • 30//2/25 kanal 2 marlaHayatpur (114)
  • 30//218 kanalHayatpur (114)
  • 30//228 kanalHayatpur (114)
  • 30//23/15 kanal 3 marlaHayatpur (114)
  • 30//25/22 kanal 15 marlaHayatpur (114)
  • 30//98 kanalHayatpur (114)
  • 56//18 kanalHayatpur (114)
  • 56//10/14 kanal 3 marlaHayatpur (114)
  • 56//10/110 marlaHayatpur (114)
  • 56//10/23 kanal 7 marlaHayatpur (114)
  • 56//127 kanal 7 marlaHayatpur (114)
  • 56//137 kanal 7 marlaHayatpur (114)
  • 56//168 kanalHayatpur (114)
  • 56//178 kanalHayatpur (114)
  • 56//18/15 kanal 13 marlaHayatpur (114)
  • 56//18/22 kanal 11 marlaHayatpur (114)
  • 56//193 kanal 8 marlaHayatpur (114)
  • 56//28 kanalHayatpur (114)
  • 56//24/12 kanal 2 marlaHayatpur (114)
  • 56//267 marlaHayatpur (114)
  • 56//3/15 kanal 3 marlaHayatpur (114)
  • 56//5/14 kanal 16 marlaHayatpur (114)
  • 56//87 kanal 8 marlaHayatpur (114)
  • 56//85 marlaHayatpur (114)
  • 56//98 kanalHayatpur (114)
  • 59//198 kanalHayatpur (114)
  • 59//20/16 kanal 12 marlaHayatpur (114)
  • 59//20/21 kanal 8 marlaHayatpur (114)
  • 59//21/17 kanal 16 marlaHayatpur (114)
  • 31//14/25 kanal 10 marlaHayatpur (114)
  • 31//16/26 kanal 16 marlaHayatpur (114)
  • 31//17/17 kanal 13 marlaHayatpur (114)
  • 31//18/1/21 kanal 16 marlaHayatpur (114)
  • 31//24/2/26 kanal 17 marlaHayatpur (114)
  • 31//25/1/12 marlaHayatpur (114)
  • 31//25/23 kanal 16 marlaHayatpur (114)
  • 31//78 kanalHayatpur (114)
  • 31//8/1/16 kanal 12 marlaHayatpur (114)
  • 15//1/16 kanal 13 marlaHayatpur (114)
  • 15//127 kanal 10 marlaHayatpur (114)
  • 15//1210 marlaHayatpur (114)
  • 15//13/24 marlaHayatpur (114)
  • 15//147 kanalHayatpur (114)
  • 15//141 kanalHayatpur (114)
  • 15//158 kanalHayatpur (114)
  • 15//16/16 kanalHayatpur (114)
  • 15//16/22 kanalHayatpur (114)
  • 15//17/13 kanal 18 marlaHayatpur (114)
  • 15//17/21 kanal 10 marlaHayatpur (114)
  • 15//17/32 kanal 12 marlaHayatpur (114)
  • 15//18/11 kanalHayatpur (114)
  • 15//19/27 kanal 12 marlaHayatpur (114)
  • 15//25/27 kanalHayatpur (114)
  • 15//3/22 kanalHayatpur (114)
  • 15//48 kanalHayatpur (114)
  • 15//57 kanal 15 marlaHayatpur (114)
  • 15//6/12 kanal 19 marlaHayatpur (114)
  • 15//6/15 marlaHayatpur (114)
  • 15//6/24 kanal 16 marlaHayatpur (114)
  • 15//77 kanal 10 marlaHayatpur (114)
  • 15//710 marlaHayatpur (114)
  • 15//8/27 kanal 17 marlaHayatpur (114)
  • 15//97 kanal 15 marlaHayatpur (114)
  • 15//95 marlaHayatpur (114)
  • 16//118 kanalHayatpur (114)
  • 16//12/17 kanal 14 marlaHayatpur (114)
  • 16//12/26 marlaHayatpur (114)
  • 16//188 kanalHayatpur (114)
  • 16//197 kanal 10 marlaHayatpur (114)
  • 16//1910 marlaHayatpur (114)
  • 16//20/12 kanal 13 marlaHayatpur (114)
  • 16//20/23 kanal 12 marlaHayatpur (114)
  • 16//20/31 kanal 15 marlaHayatpur (114)
  • 16//21/24 kanalHayatpur (114)
  • 16//228 kanalHayatpur (114)
  • 16//23/14 kanal 11 marlaHayatpur (114)
  • 16//23/23 kanal 9 marlaHayatpur (114)
  • 16//24/14 kanal 11 marlaHayatpur (114)
  • 16//24/23 kanal 9 marlaHayatpur (114)
  • 9//14/2/24 kanal 7 marlaHayatpur (114)
  • 9//16/212 marlaHayatpur (114)
  • 9//17/15 kanal 4 marlaHayatpur (114)
  • 9//24/11 kanal 14 marlaHayatpur (114)
  • 9//25/14 kanalHayatpur (114)
  • 9//25/24 kanalHayatpur (114)
  • 55//58 kanalHayatpur (114)
  • rectangle 55, kila 4/1/2/1/212 marlaHayatpur (114)
  • 16//21/14 kanalHayatpur (114)
  • 8//237 kanalHayatpur (114)
  • 8//231 kanalHayatpur (114)
  • 14//5/26 kanal 4 marlaHayatpur (114)
  • 14//6/1/12 kanal 4 marlaHayatpur (114)
  • 3//139 kanal 11 marlaBadha (113)
  • 3//14/14 kanal 7 marlaBadha (113)
  • 3//18/14 kanal 16 marlaBadha (113)
  • 3//18/49 marlaBadha (113)
  • 3//21/1/12 kanal 18 marlaBadha (113)
  • 3//22/27 kanal 15 marlaBadha (113)
  • 3//238 kanalBadha (113)
  • rectangle 4, kila 253 kanal 18 marlaBadha (113)
  • 6//15/26 kanal 19 marlaBadha (113)
  • 6//168 kanalBadha (113)
  • 6//178 kanalBadha (113)
  • 6//24/25 kanal 12 marlaBadha (113)
  • 6//258 kanalBadha (113)
  • 6//6/1/23 marlaBadha (113)
  • 15//2/21 kanal 7 marlaHayatpur (114)
  • 15//55 marlaHayatpur (114)
  • 16//138 kanalHayatpur (114)
  • 30//25/14 kanal 13 marlaHayatpur (114)
  • 29//207 kanalHayatpur (114)
  • 29//2214 marlaHayatpur (114)
  • 7//10/2/22 kanal 12 marlaBadha (113)
  • 7//11/14 kanal 18 marlaBadha (113)
  • 7//11/23 kanal 2 marlaBadha (113)
  • 7//12/1/22 kanal 11 marlaBadha (113)
  • 7//12/2/23 kanal 9 marlaBadha (113)
  • 7//18/1/12 kanal 1 marlaBadha (113)
  • 7//198 kanalBadha (113)
  • 7//208 kanalBadha (113)
  • 7//218 kanalBadha (113)
  • 7//22/14 kanalBadha (113)
  • 7//22/24 kanalBadha (113)
  • 7//7/26 kanal 5 marlaBadha (113)
  • 7//8/13 kanal 4 marlaBadha (113)
  • 7//8/24 kanal 4 marlaBadha (113)
  • 7//9/26 kanal 9 marlaBadha (113)
  • 18//1/11 kanal 1 marlaBadha (113)
  • 18//1/3/14 kanal 12 marlaBadha (113)
  • 18//1/3/21 kanal 16 marlaBadha (113)
  • 18//27 kanal 7 marlaBadha (113)
  • 19//15/1/1/13 kanal 14 marlaBadha (113)
  • 19//15/1/1/2/13 kanal 2 marlaBadha (113)
  • 19//16/1/11 kanal 7 marlaBadha (113)
  • 19//16/1/31 kanal 12 marlaBadha (113)
  • 19//5/26 kanal 8 marlaBadha (113)
  • 19//6/13 kanal 2 marlaBadha (113)
  • 19//6/24 kanal 18 marlaBadha (113)
  • 8//2/1/2/23 kanal 19 marlaBadha (113)
  • 8//2/2/23 kanal 8 marlaBadha (113)
  • 8//3/1/22 kanal 9 marlaBadha (113)
  • 8//3/1/617 marlaBadha (113)
  • 7//41 kanal 15 marlaBadha (113)
  • 7//58 marlaBadha (113)
  • 7//9/16 marlaBadha (113)
  • 7//10/117 marlaBadha (113)
  • 7//3/2/18 marlaBadha (113)
  • 7//3/25 marlaBadha (113)
  • 31//25/1/11 kanal 4 marlaHayatpur (114)

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village you want: Hayatpur (hadbast 114, tehsil Harsaru) or Badha (hadbast 113, tehsil Manesar). The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 8//21/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan9 Mar 2021

Layout plan

1 file
Latest Layout Plan9 Mar 2021

Building plans

1 file
Approved Building Plans, Full Set9 Mar 2021

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (13 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1577 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Bright Buildtech

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.