Skip to content

ADORE SAMRIDDHI

by Alesia Buildtech · Fatehabad

Not on our price list yet

Possession 31 Dec 2022 · as the developer declared it to HARERA

About this project

Key facts

Location
Fatehabad
Carpet area
323–646 sq ft
In m²about 30–60 m², as declared
Registered by
ALESIA BUILDTECH PRIVATE LIMITEDthe company that filed it, for Alesia Buildtech
Timeline
  1. 23 Oct 2018Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Dec 2022Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

838homes, 323 to 646 sq ft of carpet area
  • Under 1,000 sq ft323–646 sq ft838

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • KitchenCounter top:- marble top/ KOTA stone, tiles up to 2 FT height above counter
  • Lifts2 lifts in each tower
  • FloorsVitrified tiles/ ceramic tiles
  • WallsColour WASH/ dry distemper/oil bound distemper (OBD)
  • BathroomsPPR pipes/CPVC pipes, CP fittings of ISI marked
  • WindowsMS -Z section/ press steel/ power coated aluminium
  • Main doorFlush doors painted with FLAT enamel paint
  • Electrical fittingsISI marked

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: VILLAGE RIWAZPUR AND TIKAWALI, SECTOR 89, FARIDABAD

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Other register states: 1

Questions buyers ask

Is ADORE SAMRIDDHI registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as HRERA-PKL-FBD-68-2018. The register’s record shows an end date of 31 Dec 2022. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for ADORE SAMRIDDHI?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2022. Its registration runs to 31 Dec 2022; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ADORE SAMRIDDHI?From the records · HARERA, read 3 Nov 2026

ADORE SAMRIDDHI is in Fatehabad; the site address declared to HARERA is Village Riwazpur And Tikawali, Sector 89, Faridabad. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ADORE SAMRIDDHI?From the records · HARERA, read 3 Nov 2026

ADORE SAMRIDDHI is a Alesia Buildtech project, registered by its company ALESIA BUILDTECH PRIVATE LIMITED.

The source ↗Alesia Buildtech's projects and court record

The records

What the registers hold for ADORE SAMRIDDHI: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration HRERA-PKL-FBD-68-2018: Registration lapsed. The register’s record shows an end date of 31 Dec 2022.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 47 OF 2018 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 8 Jul 2025.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 23 Oct 2018, building plans 23 Oct 2018.Declared to HARERA, read 29 Oct 2026
The court record of Alesia Buildtech’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 31 Dec 2022. HARERA Panchkula, read 3 Nov 2026. Source

  • Amber flag: Licence 47 OF 2018 validity ended

    Named in this project’s application. Valid to 8 Jul 2025. The register links a completion certificate (LC-IX), dated 27 Oct 2026, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 11 HARERA files, with the dates we read them
Registration no.
HRERA-PKL-FBD-68-2018
Registration valid till
31 Dec 2022
Declared possession
31 Dec 2022

Declared by the promoter to HARERA

Land area
6.331 (Acre) (25,620.65 sq m)
FAR
the application prints 225, which is not a ratio
licence
47 of 2018
Estimated project cost
₹182.23 crore
Cost of land
₹55.50 crore
Layout plan, declared approved (field 5a)
23 Oct 2018
Building plans, declared approved
23 Oct 2018
Construction to start
1 Dec 2018
Completion declared for
31 Dec 2022
Declared inventory · 3 types

Declared inventory

  • Apartment/Shops/Other Buildings · 96 units · 30 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 520 units · 52.96 sq m carpet · 3 towers · one flat
  • Apartment/Shops/Other Buildings · 222 units · 60 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 2

Statutory approvals, as declared

  • I. ENVIRONMENT CLEARANCE — declared: applied for but yet to receive (16 Jul 2018)
  • II. AIRPORT CLEARANCE — declared: applied for but yet to receive (3 Aug 2018)
On file with HARERA · 11 files

On file with HARERA (11)

Plans

Site plan

1 file
Approved Site Plan29 Oct 2018

Layout plan

1 file
Latest Layout Plan29 Oct 2018

Zoning plan

1 file
Zoning Plan29 Oct 2018

Demarcation plan

1 file
Demarcation Plan29 Oct 2018

Building plans

1 file
Approved Building Plans, Full Set29 Oct 2018

Services

Service plans

1 file
Service Plans on the Layout29 Oct 2018

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule29 Oct 2018

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration29 Oct 2018

Money

Accounts and finance

3 files
CA Certificate on the Application’s Figures29 Oct 2018Non-Default Certificate from a CA29 Oct 2018Cash Flow Statement29 Oct 2018

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

47 OF 2018 · Alesia Buildtech Pvt. Ltd. · FARIDABAD

Licence valid to 8 Jul 2025

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Panchkula bench · submitted 29 Oct 2018 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/1 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

47 OF 2018: 10 parcels, 6.3312 acres in all, in Rivajpur (hadbast 142) and Tikawli (hadbast 141), tehsil Faridabad.

The licence register prints the same licensed area, 6.331 acres.

  • 30//152 kanal 7 marlaRivajpur (142)
  • 30//163 kanal 19 marlaRivajpur (142)
  • 30//64 marlaRivajpur (142)
  • 31//107 kanal 7 marlaRivajpur (142)
Show the other 6 parcels
  • 31//118 kanalRivajpur (142)
  • 31//128 kanalRivajpur (142)
  • rectangle 31, kila 206 kanal 13 marlaRivajpur (142)
  • 45//14/27 kanalTikawli (141)
  • 45//162 kanal 7 marlaTikawli (141)
  • 45//17/14 kanal 16 marlaTikawli (141)

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Faridabad, then the tehsil and the village you want: Rivajpur (hadbast 142) or Tikawli (hadbast 141), tehsil Faridabad. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 30//15.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan29 Oct 2018

Layout plan

1 file
Latest Layout Plan29 Oct 2018

Building plans

1 file
Approved Building Plans, Full Set29 Oct 2018

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (11 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/261 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Alesia Buildtech

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Panchkula records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.