Possession 12 Feb 2024 · as the developer declared it to HARERA

About this project

Key facts

Location
Faridabad
Carpet area
334–646 sq ft
In m²about 31–60 m², as declared
Registered by
AMOLIK RESIDENCY LLPthe company that filed it, for Amolik Residency
Timeline
  1. 22 Aug 2019Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 12 Feb 2024Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 12 Nov 2024Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

838homes, 334 to 646 sq ft of carpet area
  • Under 1,000 sq ft334–646 sq ft838

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside21,979 m² in all, by use
  • Roads6,179 m² · 28%
  • Pavements5,973 m² · 27%
  • Apartment buildings4,189 m² · 19%
  • Parks and playgrounds1,894 m² · 9%
  • Shops and offices1,538 m² · 7%
  • Green belts1,410 m² · 6%
  • Electricity sub-station420 m² · 2%
  • Other usesas the form names them: Anganwadi, Community376 m² · 2%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenMarble stone/KOTA stone, tiles upto 2 FEET from the counter, stainless steel sink (singe bowl)
  • LiftsAs per provision
  • FloorsVitrified tiles/ IPS in all PART of the houses.
  • WallsColour WASH /dry distemper/ oil bound distemper (OBD)
  • BathroomsCeramic tiles/ IPS, colour WASH /dry distemper/ oil bound distemper (OBD)
  • WindowsAs above.
  • Main doorMS Z- section/ fiber/UPVC/ powder coated aluminum, M.S./ fiber door frames, moulded SKIN doors / fiber door / flush doors with enamel paint
  • Electrical fittingsISI marked wires, switches and MCBS

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR 85 , NEAR SRS CHOWK

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2

Questions buyers ask

Is AMOLIK SANKALP registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as HRERA-PKL-FBD-148-2019. Ended 12 Nov 2024. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for AMOLIK SANKALP?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 12 Feb 2024. Its registration runs to 12 Nov 2024; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around AMOLIK SANKALP?From the records · HARERA, read 4 Nov 2026

AMOLIK SANKALP is in Faridabad; the site address declared to HARERA is Sector 85 , Near Srs Chowk. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building AMOLIK SANKALP?From the records · HARERA, read 4 Nov 2026

AMOLIK SANKALP is a Amolik Residency project, registered by its company AMOLIK RESIDENCY LLP.

The source ↗Amolik Residency's projects and court record

The records

What the registers hold for AMOLIK SANKALP: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration HRERA-PKL-FBD-148-2019: Registration expired. Ended 12 Nov 2024.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 21 OF 2019 is on the DTCP register: Licence lapsed; the register prints its validity to 12 Feb 2024.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 22 Aug 2019.Declared to HARERA, read 29 Oct 2026
The court record of Amolik Residency’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 12 Nov 2024. HARERA Panchkula, read 4 Nov 2026. Source

  • Red flag: Licence 21 OF 2019 lapsed

    Named in this project’s application. Valid to 12 Feb 2024; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 9 HARERA files, with the dates we read them
Registration no.
HRERA-PKL-FBD-148-2019
Registration valid till
12 Nov 2024
Declared possession
12 Feb 2024

Declared by the promoter to HARERA

Land area
5.43125 (Acre) (21,979.49 sq m)
FAR
2.25 proposed of 2.25 permissible
licence
License No. 21 of 2019 dated 13.02.2019 and Valid upto 12.02.2024.
Estimated project cost
₹119.87 crore
Cost of land
₹49.35 crore
Building plans, declared approved
22 Aug 2019
Construction to start
31 Oct 2019
Completion declared for
12 Feb 2024
Declared inventory · 5 types

Declared inventory

  • Apartment/Shops/Other Buildings · 144 units · 30.988 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 112 units · 31.32 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 192 units · 60 sq m carpet · 4 towers · one flat
  • Apartment/Shops/Other Buildings · 342 units · 60 sq m carpet · 6 towers · one flat
  • Apartment/Shops/Other Buildings · 48 units · 37.9 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 3

Statutory approvals, as declared

  • I. LICENSE NO. 21 OF 2019 — declared: already been obtained (13 Feb 2019)
  • II. APPROVAL OF ZONING PLAN — declared: already been obtained (14 Feb 2019)
  • III. TRANSFER OF LICENSE ORDERS ISSUED BY DTCP, HARYANA IN FAVOUR OF AMOLIK RESIDENCY LLP — declared: already been obtained (15 Jul 2019)
On file with HARERA · 9 files

On file with HARERA (9)

Plans

Site plan

1 file
Approved Site Plan30 Aug 2019

Layout plan

1 file
Latest Layout Plan30 Aug 2019

Zoning plan

1 file
Zoning Plan30 Aug 2019

Approvals and clearances

Completion certificate (CC)

1 file
Completion Certificate10 Dec 2025

DTCP licence

2 files
License Transfer Orders Issued by DTCP Vide Dated 15.07.201930 Aug 2019Licence Copy with Land Schedule30 Aug 2019

Money

Accounts and finance

1 file
Non-Default Certificate from a CA30 Aug 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit30 Aug 2019

HARERA’s orders

HARERA’s orders

1 file
Extension granted16 Jan 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

21 OF 2019 · Countrywide Promoters Pvt. Ltd. · FARIDABAD

Licence valid to 12 Feb 2024

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Panchkula bench · submitted 10 Sept 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/1 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

21 OF 2019: 9 parcels, 5.4312 acres in all, in Kheri kalan (hadbast 113), tehsil Faridabad.

The licence register prints the same licensed area, 5.4313 acres.

  • 23//21/15 kanal 19 marla
  • 23//21/21 kanal 7 marla
  • 23//22/15 kanal
  • 23//22/23 kanal
Show the other 5 parcels
  • 26//18 kanal
  • 26//28 kanal
  • 26//38 kanal
  • rectangle 26, kila 94 kanal
  • 24//253 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Faridabad, then the tehsil and the village: Kheri kalan (hadbast 113), tehsil Faridabad. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 23//21/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Lenders that list this project

  • PNB Housing Finance’s approved-projects list carries “Amolik Sankalp”, by M/s. Amolik Residency LLP, code Faridabad-0220-001378, approved 2020.

    PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗

A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan30 Aug 2019

Layout plan

1 file
Latest Layout Plan30 Aug 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (9 in all), none is a building plan, a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/816 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Amolik Residency

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Panchkula records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.