Skip to content

ANTARES BY ROF

by ROF Housing & Infrastructure · Gurugram

Not on our price list yet

Possession 31 Jan 2032 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Registered by
ROF INFRATECH AND HOUSING PRIVATE LIMITEDthe company that filed it, for ROF Housing & Infrastructure
Timeline
  1. 15 Jul 2025Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 15 Oct 2025Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 31 Jan 2032Possession, as declareddeclared to HARERA, read 29 Oct 2026
  4. 31 May 2032Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside11.119 acres in all, by use
  • Apartment buildings3.614 acres · 33%
  • Parking1.927 acres · 17%
  • Roads1.9 acres · 17%
  • Other usesas the form names them: Community centre and creche, Construction of circulation road, Guard room, Underground water tank, Rain water harvesting1.151 acres · 10%
  • Green belts1.02 acres · 9%
  • Pavements0.633 acres · 6%
  • Parks and playgrounds0.5 acres · 4%
  • Shops and offices0.337 acres · 3%
  • Electricity sub-station0.032 acres · under 1%
  • Sewage and waste treatment0.005 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenCeramic tile, paint, granite marble and sink
  • LiftsTwo no. of lift each tower
  • FloorsBedroom and living room- vitrified tile floor, toilet and balcony- antiskid ceremic tile, kitchen vitrified tile
  • WallsPutty + primer+ 2 coat of OBD paint
  • BathroomsCP fitting and china WARE
  • WindowsAluminum/UPVC
  • Main doorWooden
  • Electrical fittingsSwitch boards, light point, fan point

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: VILLAGE SOHNA, SECTOR 7

The builder

Its 6 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 4
  • Other register states: 1

Questions buyers ask

Is ANTARES BY ROF registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/1057/789/2026/29. Valid to 31 May 2032.

The source ↗
What is the possession timeline for ANTARES BY ROF?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Jan 2032. Its registration runs to 31 May 2032; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ANTARES BY ROF?From the records · HARERA, read 4 Nov 2026

ANTARES BY ROF is in Gurugram; the site address declared to HARERA is Village Sohna, Sector 7. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ANTARES BY ROF?From the records · HARERA, read 4 Nov 2026

ANTARES BY ROF is a ROF Housing & Infrastructure project, registered by its company ROF INFRATECH AND HOUSING PRIVATE LIMITED.

The source ↗ROF Housing & Infrastructure's projects and court record

The records

What the registers hold for ANTARES BY ROF: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/1057/789/2026/29: Registered. Valid to 31 May 2032.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 182 OF 2024 is on the DTCP register, valid to 9 Dec 2029.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 15 Jul 2025, building plans 15 Oct 2025.Declared to HARERA, read 29 Oct 2026
The court record of ROF Housing & Infrastructure’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 86 HARERA files, with the dates we read them
Registration no.
GGM/1057/789/2026/29
Registration valid till
31 May 2032
Declared possession
31 Jan 2032

Declared by the promoter to HARERA

Land area
11.11875 (Acre) (44,995.98 sq m)
FAR
2.88 proposed of 3.15 permissible
licence
182 0f 2024
Estimated project cost
₹624.68 crore
Cost of land
₹144.00 crore
Layout plan, declared approved (field 5a)
15 Jul 2025
Building plans, declared approved
15 Oct 2025
Construction to start
1 Feb 2026
Completion declared for
31 Jan 2032
Declared inventory · 2 types

Declared inventory

  • Apartment/Shops/Other Buildings · 1,891 units · 1,13,227.407 sq m carpet · 17 towers
  • Apartment/Shops/Other Buildings · 62 units · 1,254.14 sq m carpet · 1 tower
Statutory approvals, as declared · 8

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (19 Jul 2024)
  • II. FOREST NOC — declared: already been obtained (16 Aug 2024)
  • III. ASSURANCE DRINKING WATER — declared: already been obtained (26 Oct 2024)
  • IV. ASSURANCE STORM WATER — declared: already been obtained (4 Nov 2024)
  • V. ASSURANCE SEWARAGE — declared: already been obtained (4 Nov 2024)
  • VI. LAYOUT PLAN — declared: already been obtained (15 Jul 2025)
  • VII. ZONING PLAN — declared: already been obtained (26 Jul 2024)
  • VIII. SERVICE ESTIMATE — declared: already been obtained (13 Feb 2026)
On file with HARERA · 86 files

On file with HARERA (86)

Plans

Site plan

7 files
Site Plan and Area Cal16 Apr 2026Site Plan Green13 Nov 2025Site Plan Parking Part A13 Nov 2025

Layout plan

2 files
Cordinate Layout16 Apr 2026Latest Layout Plan8 Nov 2025

Zoning plan

2 files
Zoning Approval Letter16 Apr 2026Zoning Plan13 Nov 2025

Demarcation plan

2 files
Superimpose Site & Demarcation16 Apr 2026Demarcation Plan8 Nov 2025

Building plans

14 files
Tower 02,03,04,09 Building Elevation13 Nov 2025Tower 02,03,04,09&15; Building Elevation13 Nov 2025Approved Building Plans, Full Set13 Nov 2025

Floor plans

9 files
Tower 01 Area Diagram Calculation13 Nov 2025Tower 02,03,04,09 Area Diagram Calculation13 Nov 2025Tower 14 Area Diagram Calculation13 Nov 2025

Services

Sewerage and drainage

5 files
Storm Water Layout16 Apr 2026Assurance Storm Water16 Apr 2026Sewarage Assurance16 Apr 2026

Water supply

1 file
Water Supply Layout16 Apr 2026

Electricity

1 file
Electrical Load Circular16 Apr 2026

Service plans

3 files
Service Estimate Plan 1 Calculation16 Apr 2026Approval of Service Estimates16 Apr 2026Service Plans on the Layout16 Apr 2026

Approvals and clearances

DTCP licence

2 files
LOI16 Apr 2026Licence Copy with Land Schedule6 Nov 2025

Fire safety

1 file
Fire Layout16 Apr 2026

Other NOCs and clearances

5 files
Aravali16 Apr 2026Tree Cutting NOC16 Apr 2026Forest NOC16 Apr 2026

Land records

Land records

6 files
Mutation16 Apr 2026Sale Deed 116 Apr 2026Sale Deed 216 Apr 2026

Sales papers

Payment plan

1 file
Antares by Rof Payment Plan16 Apr 2026

Allotment and sale agreements

3 files
Conveyance Deed Draft Rof Antares16 Apr 2026BBA Draft Rof Antares16 Apr 2026Revised Allotment Letter Antares by Rof16 Apr 2026

Money

Accounts and finance

7 files
Cash Flow Statement16 Apr 2026CA Certificate on the Application’s Figures16 Apr 2026Latest CA Networth Certificate Rof Infratech Prov Basis 3101202616 Apr 2026

Timeline and progress

Construction schedule

1 file
PERT Chart26 Nov 2025

The promoter’s papers

Declarations and affidavits

11 files
Affidavit Promoter16 Apr 2026Undertaking Deficit Fees16 Apr 2026The Promoter’s Declaration on Affidavit16 Apr 2026

Other filings

Other filings

3 files
Approved BR-III16 Apr 2026Commercial Site Pan & Calculation13 Nov 2025Community Site Pan & Calculation13 Nov 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

182 OF 2024 · ROF Infratech and Housing Pvt. Ltd. · SOHNA

Licence valid to 9 Dec 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 27 Nov 2025 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

182 OF 2024: 22 parcels, 11.1188 acres in all, in Sohna (hadbast 187), tehsil Sohna.

The licence register prints the same licensed area, 11.1188 acres.

  • 222//12/11 kanal
  • 222//188 kanal
  • 222//19/28 marla
  • 222//22/18 marla
Show the other 18 parcels
  • 222//22/31 kanal 10 marla
  • 222//23/16 kanal 9 marla
  • 222//23/21 kanal 11 marla
  • 227//128 kanal
  • 227//13/14 kanal
  • 227//13/24 kanal
  • 227//198 kanal
  • 227//2/18 marla
  • 227//2/27 kanal 6 marla
  • 227//2/37 marla
  • 227//228 kanal
  • 227//38 kanal
  • 227//88 kanal
  • 227//9/1/18 marla
  • 227//9/1/21 kanal 10 marla
  • rectangle 222, kila 22/2/25 kanal 19 marla
  • rectangle 222, kila 22/2/13 marla
  • rectangle 222, kila 19/1/25 kanal 12 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Sohna (hadbast 187), tehsil Sohna. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 222//12/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Lenders that list this project

  • PNB Housing Finance’s approved-projects list carries “ANTARES BY ROF”, by ROF Infratech & Housing Pvt Ltd., code Gurgaon-0726-007450, approved 2026.

    PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗

A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

7 files
Site Plan and Area Cal16 Apr 2026Site Plan Green13 Nov 2025Site Plan Parking Part A13 Nov 2025Site Plan Parking13 Nov 2025Approved Site Plan13 Nov 2025Site Plan Parking Diagram13 Nov 2025Site Plan Parking Part B13 Nov 2025

Layout plan

2 files
Cordinate Layout16 Apr 2026Latest Layout Plan8 Nov 2025

Building plans

14 files
Tower 02,03,04,09 Building Elevation13 Nov 2025Tower 02,03,04,09&15; Building Elevation13 Nov 2025Approved Building Plans, Full Set13 Nov 2025Tower 05&06;, 07& 08,16&17; Building Elevation13 Nov 2025Tower 10-&11;,12&12A; Building Section & Elevation13 Nov 2025Tower 01 Building Section13 Nov 2025

Floor plans

9 files
Tower 01 Area Diagram Calculation13 Nov 2025Tower 02,03,04,09 Area Diagram Calculation13 Nov 2025Tower 14 Area Diagram Calculation13 Nov 2025Tower 12-&12A; Area Diagram Calculation13 Nov 2025Tower 15 Area Diagram Calculation13 Nov 2025Unit Category Type-1,2,3 Detail13 Nov 2025

Payment plan

1 file
Antares by Rof Payment Plan16 Apr 2026

source: https://haryanarera.gov.in/view_project/project_preview_open/3790 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on ROF Housing & Infrastructure

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.