ASHIANA ANMOL PHASE II

by Ashiana Housing · Gurugram

Not on our price list yet

About this project

Key facts

Location
Gurugram
Carpet area
780–1,262 sq ft
In m²about 72–117 m², as declared
Registered by
ASHIANA HOUSING LIMITEDthe company that filed it, for Ashiana Housing
Timeline
  1. 5 Mar 2021Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Apr 2026Registration valid toHARERA, read 3 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

180homes, 780 to 1,262 sq ft of carpet area
  • Under 1,000 sq ft780–996 sq ft120
  • 1,000–1,500 sq ft1,180–1,262 sq ft60

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside9,750 m² in all, by use
  • Club house2,320 m² · 24%
  • Roads2,013 m² · 21%
  • Other uses1,724 m² · 18%
  • Apartment buildings1,576 m² · 16%
  • Parks and playgrounds1,380 m² · 14%
  • Parking738 m² · 8%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningProvision for split AC in all bed room and living room(no AIR conditioner are provided)
  • KitchenDouble charged vitrified tiles, 600MM high ceramic tiles DADO above platfrom and plastic plastic emulsion of pleasing shade. kitchen platform in quality quartz/granite stone with stainless steel sink with stainless, shink drain and provision for hot and cold water supply.
  • LiftsTwo gearless high speed automatic lifts in each block with DG backup.
  • FloorsLiving/ dining / lobby : double charged vitrified tiles bedroom: double charged vitrified tiles kitchen: double charged vitrified tiles bathroom & balcony : ceramic tiles
  • WallsPlastic emulsion of pleasing shade of a reputed brand
  • BathroomsEWC & WASH basin of RAK brand/ROCA/jaquar or equivalent glass curtain in master toilet, wall mixer & basin mixer of jaquar/grohe/kohler or equivalent. other CP fillings or JAL/continental/prayag or equivalent mirror,towel ROAD & health faucet.
  • WindowsFolded steel section
  • Main door35 MM laminated flush door/SKIN doors with night latch, magiceye and handle.

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: VILL. WAZIRPUR, SECTOR - 93

The builder

Its 11 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2
  • Registered, no OC or CC yet: 9

Questions buyers ask

Is ASHIANA ANMOL PHASE II registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/482/214/2021/50. Ended 30 Apr 2026. The register shows it as: Registration expired.

The source ↗
How is the connectivity around ASHIANA ANMOL PHASE II?From the records · HARERA, read 3 Nov 2026

ASHIANA ANMOL PHASE II is in Gurugram; the site address declared to HARERA is Vill. Wazirpur, Sector - 93. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ASHIANA ANMOL PHASE II?From the records · HARERA, read 3 Nov 2026

ASHIANA ANMOL PHASE II is a Ashiana Housing project, registered by its company ASHIANA HOUSING LIMITED.

The source ↗Ashiana Housing's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for ASHIANA ANMOL PHASE II: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/482/214/2021/50: Registration expired. Ended 30 Apr 2026.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 20 OF 2014 is on the DTCP register: Licence lapsed; the register prints its validity to 10 Jun 2021.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 5 Mar 2021, building plans 5 Mar 2021.Declared to HARERA, read 29 Oct 2026
The court record of Ashiana Housing’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 30 Apr 2026. HARERA Gurugram, read 3 Nov 2026. Source

  • Red flag: Licence 20 OF 2014 lapsed

    Named in this project’s application. Valid to 10 Jun 2021; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 24 HARERA files, with the dates we read them
Registration no.
GGM/482/214/2021/50
Registration valid till
30 Apr 2026

Declared by the promoter to HARERA

Land area
2.40928 (Acre) (9,750.01 sq m)
FAR
0.43 proposed of 1.75 permissible
licence
20 of 2014 Dated 11.06.2014 valid up to 10.06.2026
Estimated project cost
₹144.53 crore
Cost of land
₹35.77 crore
Layout plan, declared approved (field 5a)
5 Mar 2021
Building plans, declared approved
5 Mar 2021
Declared inventory · 4 types

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK LARGE · 30 units · 109.59 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK SMALL · 90 units · 92.54 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK STAFF · 30 units · 117.27 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK · 30 units · 72.45 sq m carpet · one flat
Statutory approvals, as declared · 7

Statutory approvals, as declared

  • I. ENVIRONMENT CLEARANCE — declared: already been obtained (28 Dec 2015)
  • II. FOREST NOC — declared: already been obtained (12 Aug 2014)
  • III. CONSENT TO ESTABLISH — declared: already been obtained (16 Feb 2021)
  • IV. AAI HEIGHT NOC — declared: already been obtained (29 Aug 2019)
  • V. BUILDING PLAN APPROVAL — declared: already been obtained (5 Mar 2021)
  • VI. FIRE FIGHTING SCHEME APPROVAL — declared: applied for but yet to receive
  • VII. SERVICE PLAN ESTIMATE APPROVAL — declared: applied for but yet to receive
On file with HARERA · 24 files

On file with HARERA (24)

Plans

Site plan

3 files
Site Plan Revised Phase II Compressed (2)31 Aug 2021Final Superimposed Map31 Aug 2021Approved Site Plan17 Mar 2021

Layout plan

1 file
Latest Layout Plan16 Sept 2021

Zoning plan

1 file
Zoning Plan31 Aug 2021

Demarcation plan

1 file
Demarcation Plan16 Sept 2021

Building plans

1 file
Revised Building Plan Phase 2 &331 Aug 2021

Services

Sewerage and drainage

1 file
Assurance Storm Water and Sewage Disposal31 Aug 2021

Electricity

1 file
Electricity Approval31 Aug 2021

Approvals and clearances

Occupation certificate (OC)

2 files
Occupation Certificate4 Jun 2026OC Anmol31 Aug 2021

DTCP licence

3 files
Licence Copy with Land Schedule16 Sept 2021License No. 20 of 2014 and Renewal31 Aug 2021License Renewal 20 of 2014 Upto 10.06.202631 Aug 2021

Environment clearance

1 file
EC Ashiana Anmol31 Aug 2021

Other NOCs and clearances

5 files
Airport Authority of India NOC - Renewed Dt 29.08.201931 Aug 2021Forest NOC Ashiana Anmol31 Aug 2021Aravali NOC31 Aug 2021

Land records

Land records

2 files
Revenue Record Entry of Licence and Collaboration16 Sept 2021Permission for Joint Development Rights Dt 26.11.201531 Aug 2021

Money

Accounts and finance

1 file
Non-Default Certificate from a CA31 Aug 2021

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit16 Sept 2021

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

20 OF 2014 · Universe Heights India LLP · Sohna

Licence valid to 10 Jun 2021

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 9 Sept 2021 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

20 OF 2014: 23 parcels, 13.3375 acres in all, in Dhunela (hadbast 182), tehsil Sohna.

The licence register prints the same licensed area, 13.34 acres.

  • 26//10 min-S6 kanal
  • 26//128 kanal
  • 26//138 kanal
  • 26//14/14 kanal
Show the other 19 parcels
  • 26//14/24 kanal
  • 26//158 kanal
  • 26//166 kanal 13 marla
  • 26//17/12 marla
  • 26//258 kanal
  • 26//281 kanal 7 marla
  • 26//7/2min-S2 kanal 5 marla
  • 26//8/1min-S2 kanal 5 marla
  • 26//8/2min-S3 kanal 15 marla
  • 26//9/1min-S3 kanal 16 marla
  • 26//9/21 kanal 11 marla
  • 26//9/313 marla
  • 26//7/1/2min-S3 kanal 10 marla
  • 25//6/1min-S6 kanal
  • 25//7min-S6 kanal
  • 25//8min-S1 kanal 3 marla
  • 27//11/15 kanal 10 marla
  • 27//208 kanal 4 marla
  • 27//218 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Dhunela (hadbast 182), tehsil Sohna. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 26//10 min-S.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

3 files
Site Plan Revised Phase II Compressed (2)31 Aug 2021Final Superimposed Map31 Aug 2021Approved Site Plan17 Mar 2021

Layout plan

1 file
Latest Layout Plan16 Sept 2021

Building plans

1 file
Revised Building Plan Phase 2 &331 Aug 2021

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (24 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1588 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Ashiana Housing

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.