Ashiana Mulberry

by Ashiana Dwellings · Gurugram

Not on our price list yet

Possession 30 Jun 2020 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Carpet area
698–994 sq ft
In m²about 65–92 m², as declared
Registered
23 Oct 2018
Registered by
ASHIANA DWELLINGS PVT. LTD.the company that filed it, for Ashiana Dwellings
Timeline
  1. 23 Oct 2018Registered with HARERAHARERA, read 4 Nov 2026
  2. 30 Jun 2020Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 30 Sep 2027Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

180homes, 698 to 994 sq ft of carpet area
  • Under 1,000 sq ft698–994 sq ft180

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside11,416 m² in all, by use
  • Roads2,208 m² · 19%
  • Apartment buildings2,059 m² · 18%
  • Green belts1,689 m² · 15%
  • Parks and playgrounds1,606 m² · 14%
  • Parking1,250 m² · 11%
  • Club house1,035 m² · 9%
  • Pavements926 m² · 8%
  • Other uses643 m² · 6%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningAs per attached specification & features
  • KitchenAs per attached specification & features
  • Kitchen appliancesAs per attached specification & features
  • LiftsAs per attached specification & features
  • WardrobesAs per attached specification & features
  • FloorsAs per attached specification & features
  • WallsAs per attached specification & features
  • BathroomsAs per attached specification & features

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR 2, SOHNA, GURUGRAM

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 2
  • Other register states: 1

Questions buyers ask

Is Ashiana Mulberry registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/290/2018/22, registered on 23 Oct 2018. Valid to 30 Sep 2027.

The source ↗
What is the possession timeline for Ashiana Mulberry?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Jun 2020. Its registration runs to 30 Sep 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Ashiana Mulberry?From the records · HARERA, read 4 Nov 2026

Ashiana Mulberry is in Gurugram; the site address declared to HARERA is Sector 2, Sohna, Gurugram. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Ashiana Mulberry?From the records · HARERA, read 4 Nov 2026

Ashiana Mulberry is a Ashiana Dwellings project, registered by its company ASHIANA DWELLINGS PVT. LTD..

The source ↗Ashiana Dwellings's projects and court record

The records

What the registers hold for Ashiana Mulberry: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/290/2018/22: Registered. Valid to 30 Sep 2027.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 16 OF 2014 is on the DTCP register: Licence lapsed; the register prints its validity to 9 Jun 2026.DTCP, read 3 Nov 2026
The court record of Ashiana Dwellings’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 16 OF 2014 lapsed

    Named in this project’s application. Valid to 9 Jun 2026; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 43 HARERA files, with the dates we read them
Registration no.
GGM/290/2018/22
Registration date
23 Oct 2018
Registration valid till
30 Sept 2027
Declared possession
30 Jun 2020

Declared by the promoter to HARERA

Land area
2.81 (Acre) (11,371.67 sq m)
FAR
1.6 proposed of 1.75 permissible
licence
16 of 2014 Dated 11-06-2014
Estimated project cost
₹121.94 crore
Cost of land
₹19.27 crore
Completion declared for
30 Jun 2020
Declared inventory · 4 types

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type A · 56 units · 92.36 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type B · 56 units · 77.57 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type B1 · 4 units · 77.52 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type C · 64 units · 64.83 sq m carpet · one flat
Statutory approvals, as declared · 10

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (10 Jun 2014)
  • II. FOREST NOC — declared: already been obtained (7 Feb 2013)
  • III. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (1 Jan 2015)
  • IV. HUDA CONSTRUCTION WATER — declared: already been obtained (21 Jan 2015)
  • V. ELECTRICAL LOAD AVAILABILITY — declared: already been obtained (16 Jan 2015)
  • VI. ENVIRONMENTAL CLEARANCE — declared: already been obtained (22 Dec 2016)
  • VII. CONSENT TO ESTABLISHMENT — declared: already been obtained (5 Apr 2016)
  • VIII. MINING PERMISSION — declared: already been obtained (26 Feb 2016)
  • IX. FIRE SCHEME APPROVAL — declared: already been obtained (6 Oct 2016)
  • X. SERVICE PLAN ESTIMATE — declared: already been obtained (2 Aug 2017)
On file with HARERA · 43 files

On file with HARERA (43)

Plans

Site plan

2 files
Approved Site Plan23 Dec 2019Site Plan23 Dec 2019

Layout plan

2 files
Latest Layout Plan23 Dec 2019Lay Out Plan23 Dec 2019

Zoning plan

1 file
Zoning Plan23 Dec 2019

Demarcation plan

1 file
Demarcation Plan23 Dec 2019

Building plans

4 files
Building Plan Approval31 Jan 2020Detail Permisible FAR23 Dec 2019Approved Building Plans, Full Set23 Dec 2019Elevation Section23 Dec 2019

Floor plans

2 files
Apartment Plan23 Dec 2019Floor Plan23 Dec 2019

Services

Sewerage and drainage

2 files
Sewarage and Garbage Disposal23 Dec 2019Strom Water Drainage23 Dec 2019

Water supply

2 files
HUDA Construction Water24 Dec 2019Water Supply Plan23 Dec 2019

Electricity

3 files
Electrical Load24 Dec 2019Street Light Plan23 Dec 2019Electricity Supply Plan23 Dec 2019

Roads

1 file
Road & Pavement Plan23 Dec 2019

Service plans

4 files
Service Plan Approval Letter31 Jan 2020Service Plan Approval-Final Approval31 Jan 2020Service Plan Estimate for Aml Phase-231 Jan 2020Service Plans on the Layout23 Dec 2019

Approvals and clearances

DTCP licence

3 files
LOI31 Jan 2020LC-IV31 Jan 2020Licence Copy with Land Schedule23 Dec 2019

Environment clearance

1 file
Environment Clearance24 Dec 2019

Fire safety

1 file
Fire NOC24 Dec 2019

Other NOCs and clearances

4 files
Airport Authority NOC24 Dec 2019Mining NOC24 Dec 2019Forest NOC24 Dec 2019Consent to Establishment24 Dec 2019

Land records

Land records

2 files
Non Encumbrance Certificate31 Jan 2020Revenue Record Entry of Licence and Collaboration23 Dec 2019

Sales papers

Allotment and sale agreements

1 file
AFS Aml Phase-231 Jan 2020

Brochure and specifications

1 file
Specification2 Jan 2020

Money

Accounts and finance

4 files
Cash Flow Statement31 Jan 2020BR for Operation of Bank Account31 Jan 2020CA Certificate on the Application’s Figures23 Dec 2019Non-Default Certificate from a CA23 Dec 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit31 Jan 2020

Other filings

Other filings

1 file
Project Continuation- RC/REP/HARERA/GGM/22 of 2018/7(3)/44/2024/03 Dated 05.06.20249 Jul 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

16 OF 2014 · Ashiana Dwellings Pvt. Ltd. · SOHNA

Licence valid to 9 Jun 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 9 Jan 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

16 OF 2014: 13 parcels, 10.25 acres in all, in Sohna (hadbast 187), tehsil Sohna.

The licence register prints the same licensed area, 10.25 acres.

  • 55//18 kanal
  • 55//108 kanal
  • 55//128 kanal
  • 55//138 kanal
Show the other 9 parcels
  • 55//147 kanal 10 marla
  • 55//77 kanal 4 marla
  • 55//87 kanal 4 marla
  • 55//816 marla
  • 55//98 kanal
  • 56//68 kanal
  • 56//7/16 kanal 12 marla
  • 56//7/21 kanal 8 marla
  • 56//8/13 kanal 6 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Sohna (hadbast 187), tehsil Sohna. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 55//1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Approved Site Plan23 Dec 2019Site Plan23 Dec 2019

Layout plan

2 files
Latest Layout Plan23 Dec 2019Lay Out Plan23 Dec 2019

Building plans

4 files
Building Plan Approval31 Jan 2020Detail Permisible FAR23 Dec 2019Approved Building Plans, Full Set23 Dec 2019Elevation Section23 Dec 2019

Floor plans

2 files
Apartment Plan23 Dec 2019Floor Plan23 Dec 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (43 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1059 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Ashiana Dwellings

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.