ASHIANA MULBERRY PHASE IV

by Ashiana Dwellings · Gurugram

Not on our price list yet

Possession 31 Aug 2030 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Carpet area
1,013–1,272 sq ft
In m²about 94–118 m², as declared
Registered by
ASHIANA DWELLINGS PRIVATE LIMITEDthe company that filed it, for Ashiana Dwellings
Timeline
  1. 18 Aug 2025Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Aug 2030Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

138homes, 1,013 to 1,272 sq ft of carpet area
  • 1,000–1,500 sq ft1,013–1,272 sq ft138

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside6,758 m² in all, by use
  • Parks and playgrounds3,908 m² · 58%
  • Apartment buildings1,478 m² · 22%
  • Roads1,151 m² · 17%
  • Parking188 m² · 3%
  • Other uses33 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningAs per specification sheet attached
  • KitchenAs per specification sheet attached
  • Kitchen appliancesAs per specification sheet attached
  • LiftsAs per specification sheet attached
  • WardrobesAs per specification sheet attached
  • FloorsAs per specification sheet attached
  • WallsAs per specification sheet attached
  • BathroomsAs per specification sheet attached

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR-2, OPP K.R MANGALAM UNIVERSITY

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 2
  • Other register states: 1

Questions buyers ask

Is ASHIANA MULBERRY PHASE IV registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/989/721/2025/92. Valid to 31 Aug 2030.

The source ↗
What is the possession timeline for ASHIANA MULBERRY PHASE IV?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Aug 2030. Its registration runs to 31 Aug 2030; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ASHIANA MULBERRY PHASE IV?From the records · HARERA, read 4 Nov 2026

ASHIANA MULBERRY PHASE IV is in Gurugram; the site address declared to HARERA is Sector-2, Opp K.R Mangalam University. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ASHIANA MULBERRY PHASE IV?From the records · HARERA, read 4 Nov 2026

ASHIANA MULBERRY PHASE IV is a Ashiana Dwellings project, registered by its company ASHIANA DWELLINGS PRIVATE LIMITED.

The source ↗Ashiana Dwellings's projects and court record

The records

What the registers hold for ASHIANA MULBERRY PHASE IV: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/989/721/2025/92: Registered. Valid to 31 Aug 2030.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 16 OF 2014 is on the DTCP register: Licence lapsed; the register prints its validity to 9 Jun 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 18 Aug 2025, building plans 18 Aug 2025.Declared to HARERA, read 29 Oct 2026
The court record of Ashiana Dwellings’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 16 OF 2014 lapsed

    Named in this project’s application. Valid to 9 Jun 2026; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 76 HARERA files, with the dates we read them
Registration no.
GGM/989/721/2025/92
Registration valid till
31 Aug 2030
Declared possession
31 Aug 2030

Declared by the promoter to HARERA

Land area
6758.25 (Sqr/mtrs)
FAR
1.87 proposed of 1.87 permissible
licence
Licence No. 16 of 2014 dated 10.06.2014
Estimated project cost
₹150.98 crore
Cost of land
₹18.18 crore
Layout plan, declared approved (field 5a)
18 Aug 2025
Building plans, declared approved
18 Aug 2025
Construction to start
1 Sept 2025
Completion declared for
31 Aug 2030
Declared inventory · 3 types

Declared inventory

  • Apartment/Shops/Other Buildings · 50 units · 118.16 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 40 units · 114 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 48 units · 94.08 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 9

Statutory approvals, as declared

  • I. LICENCE — declared: already been obtained (10 Jun 2014)
  • II. ENVIRONMENT CLEARANCE — declared: already been obtained (18 Feb 2025)
  • III. HEIGHT CLEARANCE — declared: already been obtained (31 Aug 2023)
  • IV. FOREST NOC — declared: already been obtained (7 Feb 2013)
  • V. BUILDING PLAN — declared: already been obtained (18 Aug 2025)
  • VI. ELECTRICITY — declared: already been obtained (20 Mar 2019)
  • VII. PHASING — declared: already been obtained (22 May 2025)
  • VIII. FIRE FIGHTING SCHEME — declared: yet to file for approval
  • IX. SERVICE PLAN ESTIMATES — declared: yet to file for approval
On file with HARERA · 76 files

On file with HARERA (76)

Plans

Site plan

4 files
Site Plan Green Area20 Nov 2025Site Plan & Area Details20 Nov 2025Superimposed Drawing20 Nov 2025Approved Site Plan18 Aug 2025

Layout plan

1 file
Latest Layout Plan18 Aug 2025

Zoning plan

1 file
Zoning Plan20 Nov 2025

Demarcation plan

1 file
Demarcation Plan20 Nov 2025

Building plans

22 files
Ground Floor FAR & Ground Coverage Area Details20 Nov 2025Phasing Drawing Approved20 Nov 2025Approved Drawing 820 Nov 2025

Floor plans

9 files
2nd to 18th Floor Plan & Area Detail20 Nov 202519th Floor Plan & Area Detail20 Nov 202521st Floor Plan & Area Details20 Nov 2025

Services

Electricity

3 files
Final Approval of Electrification Plan - Aml 20.03.1920 Nov 2025Approval of Electrification Plan - Aml20 Nov 2025Electrical Load Calculation20 Nov 2025

Service plans

1 file
Service Plan Estimates Ack 15.09.202520 Nov 2025

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule5 Aug 2025

Fire safety

1 file
Fire Scheme Ack 16.09.202520 Nov 2025

Other NOCs and clearances

4 files
AAI Height NOC20 Nov 2025Mining Permission20 Nov 2025NCZ Approval (NOC)20 Nov 2025Forest NOC20 Nov 2025

Land records

Land records

1 file
Non Encumbrance Certificate20 Nov 2025

Sales papers

Allotment and sale agreements

3 files
CA Certificate Unsold Inventory20 Nov 2025Allotment Letter New20 Nov 2025AFS New20 Nov 2025

Brochure and specifications

1 file
Specification of Construction20 Nov 2025

Money

Accounts and finance

11 files
CA Certificate Land Cost20 Nov 2025IDC Payment Receipt Nov 1420 Nov 2025CA Certificate on the Application’s Figures20 Nov 2025

Timeline and progress

Construction schedule

1 file
PERT Charts20 Nov 2025

The promoter’s papers

Declarations and affidavits

7 files
Undertaking20 Nov 2025Bank Undertaking New20 Nov 2025Litigation Details20 Nov 2025

Other filings

Other filings

4 files
Nursery School20 Nov 2025Room Plan & Area Details20 Nov 2025EC Ashiana Mulberry20 Nov 2025Phasing Approval20 Nov 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

16 OF 2014 · Ashiana Dwellings Pvt. Ltd. · SOHNA

Licence valid to 9 Jun 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 18 Aug 2025 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

16 OF 2014: 13 parcels, 10.25 acres in all, in Sohna (hadbast 187), tehsil Sohna.

The licence register prints the same licensed area, 10.25 acres.

  • 55//18 kanal
  • 55//108 kanal
  • 55//128 kanal
  • 55//138 kanal
Show the other 9 parcels
  • 55//147 kanal 10 marla
  • 55//77 kanal 4 marla
  • 55//87 kanal 4 marla
  • 55//816 marla
  • 55//98 kanal
  • 56//68 kanal
  • 56//7/16 kanal 12 marla
  • 56//7/21 kanal 8 marla
  • 56//8/13 kanal 6 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Sohna (hadbast 187), tehsil Sohna. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 55//1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

4 files
Site Plan Green Area20 Nov 2025Site Plan & Area Details20 Nov 2025Superimposed Drawing20 Nov 2025Approved Site Plan18 Aug 2025

Layout plan

1 file
Latest Layout Plan18 Aug 2025

Building plans

22 files
Ground Floor FAR & Ground Coverage Area Details20 Nov 2025Phasing Drawing Approved20 Nov 2025Approved Drawing 820 Nov 2025Approved Drawing 220 Nov 2025Tower 7 Elevation A& B20 Nov 2025Terrace Plan & Area Details20 Nov 2025

Floor plans

9 files
2nd to 18th Floor Plan & Area Detail20 Nov 202519th Floor Plan & Area Detail20 Nov 202521st Floor Plan & Area Details20 Nov 2025Ground Floor Plan20 Nov 2025First Floor20 Nov 2025Basement Floor Plan20 Nov 2025

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (76 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3634 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Ashiana Dwellings

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.