Skip to content

ASTER AVENUE 36 PHASE 2

by 4S Developers · Gurugram

Not on our price list yet

Possession 29 Feb 2032 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Carpet area
645 sq ft
In m²about 60–60 m², as declared
Registered by
4S DEVELOPERS PRIVATE LIMITEDthe company that filed it, for 4S Developers
Timeline
  1. 9 Jul 2024Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 9 Apr 2026Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 30 Nov 2031Registration valid toHARERA, read 4 Nov 2026
  4. 29 Feb 2032Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

790homes, 645 to 645 sq ft of carpet area
  • Under 1,000 sq ft645 sq ft790

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 2 rows of a single unit, because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside10,024 m² in all, by use
  • Apartment buildings5,971 m² · 60%
  • Roads2,396 m² · 24%
  • Other usesas the form names them: STP (sewage treatment plant), Area1,658 m² · 17%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenTile flooring
  • LiftsKONE/fujitec/ johnson/OTIS or equivalent
  • FloorsTile flooring
  • WallsOil bound distamper
  • BathroomsISI marked or equivalent
  • WindowsUPVC/aluminium glazing
  • Main doorLaminated flush door
  • Electrical fittingsISI marked or equivalent

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: VILLAGE DHUNELA SECTOR 36

The builder

Its 4 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 3
  • Other register states: 1

Questions buyers ask

Is ASTER AVENUE 36 PHASE 2 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/1061/793/2026/33. Valid to 30 Nov 2031.

The source ↗
What is the possession timeline for ASTER AVENUE 36 PHASE 2?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 29 Feb 2032. Its registration runs to 30 Nov 2031; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ASTER AVENUE 36 PHASE 2?From the records · HARERA, read 4 Nov 2026

ASTER AVENUE 36 PHASE 2 is in Gurugram; the site address declared to HARERA is Village Dhunela Sector 36. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ASTER AVENUE 36 PHASE 2?From the records · HARERA, read 4 Nov 2026

ASTER AVENUE 36 PHASE 2 is a 4S Developers project, registered by its company 4S DEVELOPERS PRIVATE LIMITED.

The source ↗4S Developers's projects and court record

The records

What the registers hold for ASTER AVENUE 36 PHASE 2: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/1061/793/2026/33: Registered. Valid to 30 Nov 2031.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 235 OF 2023 is on the DTCP register, valid to 1 Nov 2028.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 9 Jul 2024, building plans 9 Apr 2026.Declared to HARERA, read 29 Oct 2026
The court record of 4S Developers’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 67 HARERA files, with the dates we read them
Registration no.
GGM/1061/793/2026/33
Registration valid till
30 Nov 2031
Declared possession
29 Feb 2032

Declared by the promoter to HARERA

Land area
2.477 (Acre) (10,024.06 sq m)
FAR
2.88 proposed of 2.89 permissible
licence
235 of 2023 (02-11-2023) and 269 of 2023 (28-12-2023)
Estimated project cost
₹269.17 crore
Cost of land
₹33.45 crore
Layout plan, declared approved (field 5a)
9 Jul 2024
Building plans, declared approved
9 Apr 2026
Construction to start
1 Sept 2026
Completion declared for
29 Feb 2032
Declared inventory · 10 types

Declared inventory — 10 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 353 units · 59.89 sq m carpet · 5 towers · one flat
  • Apartment/Shops/Other Buildings · 13 units · 59.89 sq m carpet · 5 towers · one flat
  • Apartment/Shops/Other Buildings · 3 units · 59.89 sq m carpet · 3 towers · one flat
  • Apartment/Shops/Other Buildings · 2 units · 59.89 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 59.89 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 404 units · 59.93 sq m carpet · 5 towers · one flat
  • Apartment/Shops/Other Buildings · 11 units · 59.93 sq m carpet · 5 towers · one flat
  • Apartment/Shops/Other Buildings · 2 units · 59.93 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 8

Statutory approvals, as declared

  • I. LICENCE FROM DTCP — declared: already been obtained (2 Nov 2023)
  • II. LICENCE FROM DTCP — declared: already been obtained (28 Dec 2023)
  • III. DEMARCATION PLAN — declared: already been obtained (11 Sept 2023)
  • IV. ZONING PLAN — declared: already been obtained (8 May 2024)
  • V. ELECTRICAL LOAD — declared: already been obtained (13 Nov 2024)
  • VI. REVISED BUILDING PLAN APPROVAL — declared: already been obtained (9 Apr 2026)
  • VII. REVISED ZONING PLAN WITH TDR — declared: already been obtained (16 Oct 2025)
  • VIII. PHASING PLAN — declared: already been obtained (9 May 2024)
On file with HARERA · 67 files

On file with HARERA (67)

Plans

Site plan

3 files
Site Plan for Green & Services2 Jun 2026Approved Site Plan2 Jun 2026Demarcation Superimposed2 Jun 2026

Layout plan

1 file
Latest Layout Plan2 Jun 2026

Zoning plan

1 file
Zoning Plan2 Jun 2026

Demarcation plan

1 file
Demarcation Plan1 Apr 2026

Building plans

15 files
Commercial-2 Elevations2 Jun 2026Tower-H Section & Elevations2 Jun 2026Tower-G Elevations2 Jun 2026

Floor plans

24 files
Commercial-2-Floor Plans & Area Calculations2 Jun 2026Tower-F 21st Floor Plan & Area Calculation2 Jun 2026Tower-I 1st Floor Plan & Area Calculation2 Jun 2026

Services

Electricity

1 file
Electrification Plan Approval2 Jun 2026

Service plans

1 file
PERT Chart Services2 Jun 2026

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule2 Jun 2026

Land records

Land records

4 files
Revenue Record Entry of Licence and Collaboration2 Jun 2026Collaboration2 Jun 2026Land Title Search Report2 Jun 2026Shajra2 Jun 2026

Money

Accounts and finance

2 files
CA Certificate on the Application’s Figures13 Apr 2026Non-Default Certificate from a CA13 Apr 2026

Timeline and progress

Construction schedule

2 files
PERT Construction2 Jun 2026PERT Non Construction2 Jun 2026

The promoter’s papers

Declarations and affidavits

9 files
Affidavit-Share Allocation to Landowners3 Jun 2026Affidavit Power Line Shifting2 Jun 2026Affidavit Natural Conservation Zone2 Jun 2026

Other filings

Other filings

2 files
Phasing2 Jun 2026Phasing Approval2 Jun 2026

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

235 OF 2023 · 4S Developers Pvt. Ltd. · SOHNA

Licence valid to 1 Nov 2028

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

269 OF 2023 · 4S Developers Pvt. Ltd. · SOHNA

Licence valid to 27 Dec 2028

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 20 Apr 2026 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 2 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

235 OF 2023: 16 parcels, 8.3083 acres in all, in Dhunela (hadbast 182), tehsil Sohna.

The licence register prints the same licensed area, 8.309 acres.

  • 9//2/2/218 marla
  • 9//3/216 marla
  • 9//48 kanal
  • 9//5/14 kanal 9 marla
Show the other 12 parcels
  • 9//5/23 kanal 11 marla
  • 9//68 kanal
  • 9//78 kanal
  • 9//88 kanal
  • 10//1/2/18 marla
  • 10//107 kanal 15 marla
  • 10//105 marla
  • 10//11/15 marla
  • rectangle 10, kila 9/2/1 min2 kanal 4 marla 3 sarsai
  • rectangle 10, kila 9/2/2 min7 marla 3 sarsai
  • rectangle 9, kila 14 min6 kanal 14 marla 7 sarsai
  • rectangle 9, kila 15 min6 kanal 15 marla 8 sarsai

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

269 OF 2023: 3 parcels, 1.3757 acres in all, in Dhunela (hadbast 182), tehsil Sohna.

The licence register prints the same licensed area, 1.375 acres.

  • rectangle 9, kila 16 min5 kanal 11 marla 6 sarsai
  • 10//20/23 kanal 19 marla
  • rectangle 10, kila 20/1 min1 kanal 9 marla 4 sarsai

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Dhunela (hadbast 182), tehsil Sohna. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 9//2/2/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

3 files
Site Plan for Green & Services2 Jun 2026Approved Site Plan2 Jun 2026Demarcation Superimposed2 Jun 2026

Layout plan

1 file
Latest Layout Plan2 Jun 2026

Building plans

15 files
Commercial-2 Elevations2 Jun 2026Tower-H Section & Elevations2 Jun 2026Tower-G Elevations2 Jun 2026Tower-F Terrace Floor Plan & Area Calculation2 Jun 2026Tower-G Terrace Floor Plan & Area Calculation2 Jun 2026Tower-H Elevations2 Jun 2026

Floor plans

24 files
Commercial-2-Floor Plans & Area Calculations2 Jun 2026Tower-F 21st Floor Plan & Area Calculation2 Jun 2026Tower-I 1st Floor Plan & Area Calculation2 Jun 2026Commercial-2 Floor Plans & Area Calculations2 Jun 2026Tower-I Stilt Floor Plan & Area Calculation2 Jun 2026Tower-H Stilt Floor Plan & Area Calculation2 Jun 2026

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (67 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3996 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on 4S Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.