Skip to content

AVANI SIGNATURE FLOORS

by N. S. Buildtech · Gurugram

Not on our price list yet

Possession 30 Apr 2030 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Carpet area
779–943 sq ft
In m²about 72–88 m², as declared
Registered by
N. S. BUILDTECH PRIVATE LIMITEDthe company that filed it, for N. S. Buildtech
Timeline
  1. 31 Dec 2024Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Apr 2030Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

140homes, 779 to 943 sq ft of carpet area
  • Under 1,000 sq ft779–943 sq ft140

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside4,515 m² in all, by use
  • Apartment buildings4,515 m² · 100%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenAnti-skid vitrified tiles, ceramic tiles and plastic emulsion, UPVC frames with glass
  • Kitchen appliancesKitchen counter with granite top
  • LiftsOne lift
  • FloorsAnti skid, vitrified tiles
  • WallsCeramic tiles, oil bound distemper, paint,
  • BathroomsCP fittings, of ISI MARK, sanitary WARE ISI MARK
  • WindowsUPVC with glass
  • Main doorFlush door

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR-2, SOHNA

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 3

Questions buyers ask

Is AVANI SIGNATURE FLOORS registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/971/703/2025/74. Valid to 30 Apr 2030.

The source ↗
What is the possession timeline for AVANI SIGNATURE FLOORS?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Apr 2030. Its registration runs to 30 Apr 2030; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around AVANI SIGNATURE FLOORS?From the records · HARERA, read 4 Nov 2026

AVANI SIGNATURE FLOORS is in Gurugram; the site address declared to HARERA is Sector-2, Sohna. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building AVANI SIGNATURE FLOORS?From the records · HARERA, read 4 Nov 2026

AVANI SIGNATURE FLOORS is a N. S. Buildtech project, registered by its company N. S. BUILDTECH PRIVATE LIMITED.

The source ↗N. S. Buildtech's projects and court record

The records

What the registers hold for AVANI SIGNATURE FLOORS: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/971/703/2025/74: Registered. Valid to 30 Apr 2030.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 103 OF 2022 is on the DTCP register, valid to 27 Jul 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 31 Dec 2024.Declared to HARERA, read 29 Oct 2026
The court record of N. S. Buildtech’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 51 HARERA files, with the dates we read them
Registration no.
GGM/971/703/2025/74
Registration valid till
30 Apr 2030
Declared possession
30 Apr 2030

Declared by the promoter to HARERA

Land area
1.1157 (Acre) (4,515.08 sq m)
FAR
2.64 proposed of 2.64 permissible
licence
103 of 2022 and 115 of 2023
Estimated project cost
₹185.08 crore
Cost of land
₹95.81 crore
Building plans, declared approved
31 Dec 2024
Construction to start
1 May 2025
Completion declared for
30 Apr 2030
Declared inventory · 5 types

Declared inventory

  • Apartment/Shops/Other Buildings · 28 units · 72.374 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 4 units · 72.74 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 28 units · 75.34 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 56 units · 79.4 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 24 units · 87.6 sq m carpet · one flat
Statutory approvals, as declared · 2

Statutory approvals, as declared

  • I. BUILDING PLAN APPROVAL — declared: already been obtained (1 Apr 2025)
  • II. BUILDING PLAN APPROVAL — declared: already been obtained (31 Dec 2025)
On file with HARERA · 51 files

On file with HARERA (51)

Plans

Site plan

1 file
Approved Site Plan23 Apr 2025

Layout plan

2 files
Layout Plan Final27 Jun 2025Latest Layout Plan23 Apr 2025

Zoning plan

2 files
Zonning Plan27 Jun 2025Zoning Plan23 Apr 2025

Demarcation plan

3 files
Demarcation Plan27 Jun 2025Superimposed Demarcation Plan27 Jun 2025Demarcation Plan23 Apr 2025

Building plans

1 file
Approved Building Plans, Full Set7 May 2025

Services

Sewerage and drainage

1 file
Assurance Storm Water27 Jun 2025

Water supply

1 file
Assurance D Water Merged27 Jun 2025

Electricity

2 files
DHBVN27 Jun 2025Assurance Power Load Merged27 Jun 2025

Service plans

3 files
Ministry of Corporate Affairs - Mca Services27 Jun 2025Approval of Service Plan Estimates27 Jun 2025Service Plans on the Layout23 Apr 2025

Approvals and clearances

DTCP licence

4 files
LOI27 Jun 2025Copy of License27 Jun 2025LC-IV27 Jun 2025Licence Copy with Land Schedule23 Apr 2025

Other NOCs and clearances

2 files
Forest NOC27 Jun 2025Various NOC27 Jun 2025

Land records

Land records

11 files
Sale Deed27 Jun 2025Entry in Revenue Record27 Jun 2025Title Search Report New27 Jun 2025

Money

Accounts and finance

12 files
CA Certificate Non Default Latest27 Jun 2025BR Person Authorised to Operate the Bank Account27 Jun 2025CA Net Worth Certificate27 Jun 2025

The promoter’s papers

Declarations and affidavits

3 files
All Affidavit27 Jun 2025Promoter Affidavit27 Jun 2025The Promoter’s Declaration on Affidavit30 Apr 2025

Company papers

1 file
Board Resolution for Authorised Signatory27 Jun 2025

Other filings

Other filings

2 files
All Plans27 Jun 2025Mou GPA127 Jun 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

103 OF 2022 · N.S. Buildtech Pvt. Ltd. · SOHNA

Licence valid to 27 Jul 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

115 OF 2023 · N.S. Buildtech Pvt. Ltd. · SOHNA

Licence valid to 2 Jun 2028

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 7 May 2025 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 2 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

103 OF 2022: 15 parcels, 9.9583 acres in all, in Sohna (hadbast 187), tehsil Sohna.

The licence register prints the same licensed area, 9.9583 acres.

  • 38//15/2/11 kanal 11 marla
  • 38//218 marla 6 sarsai
  • 38//36 kanal 8 marla 2 sarsai
  • 38//46 kanal 8 marla 2 sarsai
Show the other 11 parcels
  • 38//56 kanal 8 marla 2 sarsai
  • 38//6/17 kanal 11 marla
  • 38//7/17 kanal 6 marla
  • 38//7/15 marla
  • 38//8/16 kanal 19 marla
  • 39//1/12 kanal 11 marla 3 sarsai
  • 39//10/17 kanal 11 marla
  • 39//11/16 kanal 18 marla
  • 39//12/16 kanal 18 marla
  • 39//13/24 kanal 8 marla 6 sarsai
  • 39//9/17 kanal 11 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

115 OF 2023: 4 parcels, 1.9938 acres in all, in Sohna (hadbast 187), tehsil Sohna.

The licence register prints the same licensed area, 1.9938 acres.

  • 38//13/1/210 marla
  • 38//15/1/15 kanal 7 marla
  • rectangle 38, kila 13/1/1/23 kanal 4 marla
  • rectangle 38, kila 14/16 kanal 18 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Sohna (hadbast 187), tehsil Sohna. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 38//15/2/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan23 Apr 2025

Layout plan

2 files
Layout Plan Final27 Jun 2025Latest Layout Plan23 Apr 2025

Building plans

1 file
Approved Building Plans, Full Set7 May 2025

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (51 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3448 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on N. S. Buildtech

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.