BIRLA ARIKA PHASE 2

by Birla Estates · Gurugram

From ₹10.42 Cr

As listed on birlaestates.com (“₹10.42 Cr*”), read 23 Oct 2026.

Possession 9 Oct 2033 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Carpet area
2,319–2,356 sq ft
In m²about 215–219 m², as declared
Price, as listed
From ₹10.42 Cr
Registered by
BIRLA ESTATES PRIVATE LIMITEDthe company that filed it, for Birla Estates
Timeline
  1. 16 Jan 2026Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 9 Jul 2033Registration valid toHARERA, read 4 Nov 2026
  3. 9 Oct 2033Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

234homes, 2,319 to 2,356 sq ft of carpet area
  • 2,000–2,500 sq ft2,319–2,356 sq ft234

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside1.529 acres in all, by use
  • Apartment buildings0.596 acres · 39%
  • Roads0.383 acres · 25%
  • Parks and playgrounds0.27 acres · 18%
  • Parking0.136 acres · 9%
  • Club house0.072 acres · 5%
  • Nursery school0.069 acres · 5%
  • Other uses0.003 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningVRV/VRF
  • KitchenMarble/anti skid tiles; acrylic emulsion paint/oil bound distemper/tile DADO; CP fittings, SS sink
  • Kitchen appliancesModular kitchen
  • FloorsMarble/laminated wooden flooring/ vitrified tiles/anti skid tiles/ceramic tiles/engineered stones and equivalents
  • WallsTiles/acrylic emulsion/OBD/paint and equivalents
  • BathroomsPVC, CPVC pipes, CP & sanitary fittings
  • WindowsWooden / powder coated aluminum / UPVC
  • Main doorPainted/ polished frame with painted/laminated/veneered flush doors

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR 31-32A, GURUGRAM

The builder

Its 4 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 4

Questions buyers ask

Is BIRLA ARIKA PHASE 2 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/1044/776/2026/16. Valid to 9 Jul 2033.

The source ↗
What is the possession timeline for BIRLA ARIKA PHASE 2?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 9 Oct 2033. Its registration runs to 9 Jul 2033; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around BIRLA ARIKA PHASE 2?From the records · HARERA, read 4 Nov 2026

BIRLA ARIKA PHASE 2 is in Gurugram; the site address declared to HARERA is Sector 31-32a, Gurugram. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What does a home in BIRLA ARIKA PHASE 2 cost, and how does that compare nearby?From the records · birlaestates.com, read 23 Oct 2026

The developer's website, birlaestates.com, lists homes from ₹10.42 Cr ("₹10.42 Cr*"). Prices change; ask the developer for its current price list.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty

The records

What the registers hold for BIRLA ARIKA PHASE 2: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/1044/776/2026/16: Registered. Valid to 9 Jul 2033.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 116 OF 2011 is on the DTCP register, valid to 22 Dec 2029.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 16 Jan 2026, building plans 16 Jan 2026.Declared to HARERA, read 29 Oct 2026
The court record of Birla Estates’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 100 HARERA files, with the dates we read them
Registration no.
GGM/1044/776/2026/16
Registration valid till
9 Jul 2033
Declared possession
9 Oct 2033

Declared by the promoter to HARERA

Land area
1.53 (Acre) (6,191.69 sq m)
FAR
1.25 proposed of 1.25 permissible
licence
License No. 116 of 2011 Dated 23.12.2011 granted by DTCP, Haryana
Estimated project cost
₹2287.83 crore
Cost of land
₹1159.85 crore
Layout plan, declared approved (field 5a)
16 Jan 2026; Part E of the same form gives 24 Dec 2024
Building plans, declared approved
16 Jan 2026
Construction to start
10 Mar 2026
Completion declared for
9 Oct 2033
Declared inventory · 4 types

Declared inventory

  • Apartment/Shops/Other Buildings · 77 units · 218.26 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 77 units · 215.45 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 40 units · 218.89 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 40 units · 218.06 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 13

Statutory approvals, as declared

  • I. LAYOUT PLAN/SITE PLAN — declared: already been obtained (24 Dec 2024)
  • II. ENVIRONMENT CLAREARANCE — declared: already been obtained (13 Nov 2024)
  • III. BUILDING PLAN — declared: already been obtained (16 Jan 2026)
  • IV. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (27 Dec 2018)
  • V. FOREST NOC — declared: already been obtained (30 Jul 2024)
  • VI. ASSURANCE ELECTRICAL LOAD — declared: already been obtained (19 Jul 2024)
  • VII. TREE CUTTING PERMISSION — declared: already been obtained (29 Oct 2024)
  • VIII. HUDA SEWAGE TREATED WATER FOR CONSTRUCTION — declared: already been obtained (24 Jul 2024)
  • IX. ASSURANCE FOR TREATED WATER FOR CONSTRUCTION — declared: already been obtained (11 Jul 2024)
  • X. ASSURANCE FOR FRESH WATER FOR DRINKING — declared: already been obtained (8 Jul 2024)
  • XI. ARAVALI NOC — declared: already been obtained (19 Sept 2024)
  • XII. ASSURANCE FOR STORM WATER CONNECTION — declared: already been obtained (11 Jul 2024)
  • XIII. ASSURANCE FOR SEWERAGE CONNECTION — declared: already been obtained (11 Jul 2025)
On file with HARERA · 100 files

On file with HARERA (100)

Plans

Site plan

6 files
Superimposed16 Apr 2026Revised Site Plan16 Apr 2026Site Plan (Green Area & Surface Parking Area)16 Apr 2026

Layout plan

1 file
Latest Layout Plan6 Jan 2026

Zoning plan

3 files
Approval of Revised Demarcation-Cum-Zoning Plan16 Apr 2026Revised Demarcation-Cum-Zoning Plan16 Apr 2026Zoning Plan6 Jan 2026

Demarcation plan

1 file
Demarcation Plan6 Jan 2026

Building plans

23 files
Tower 5 Terrace and Mumty Plan Area Calculation16 Apr 2026EWS First, Second, Third Terrace Floor Plan and Area Calculation16 Apr 2026Tower 5 & 6 Elevation 216 Apr 2026

Floor plans

20 files
Tower 5 & 6 Stilt Ground Floor & Area Calculation16 Apr 2026Basement 2 Area Diagram16 Apr 2026Tower 5 & 616 Apr 2026

Services

Sewerage and drainage

3 files
Approval- Sewerage Connection Assurance16 Apr 2026Approval - Storm Water Connection Assurance16 Apr 2026Approval- STP Treated Water Assurance16 Apr 2026

Water supply

1 file
Approval- Water Connection Assurance16 Apr 2026

Electricity

1 file
Approval- Electrical Load Assurance16 Apr 2026

Service plans

3 files
Basement 1 Area Service Diagram16 Apr 2026Basement 2 Service Area Diagram16 Apr 2026Service Plans on the Layout14 Jan 2026

Approvals and clearances

DTCP licence

3 files
Licence Copy with Land Schedule16 Apr 2026LC- IV16 Apr 2026LOI16 Apr 2026

Environment clearance

1 file
EC Approval- 13.11.2416 Apr 2026

Other NOCs and clearances

3 files
Forest NOC- Barmalt- 30.07.2416 Apr 2026Tree Cutting New16 Apr 2026Tree Cutting Old16 Apr 2026

Land records

Land records

9 files
Mutation16 Apr 2026Land Title Search Report Arika Phase 216 Apr 2026Collaboration Agreement16 Apr 2026

Sales papers

Allotment and sale agreements

1 file
Agreement for Sale ARIKA216 Apr 2026

Brochure and specifications

1 file
Brochure Arika Phase 216 Apr 2026

Money

Accounts and finance

8 files
BR- Bank Account Arika 216 Apr 2026CA Certificate Cost Incurred16 Apr 2026CA Certificate on the Application’s Figures16 Apr 2026

Timeline and progress

Construction schedule

1 file
PERT Chart16 Apr 2026

The promoter’s papers

Declarations and affidavits

8 files
Affidavit Bank Account16 Apr 2026Bank Undertaking16 Apr 2026Application Form ARIKA216 Apr 2026

Other filings

Other filings

3 files
COD Approval16 Apr 2026Bepl ROC16 Apr 2026DD Fees16 Apr 2026

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

116 OF 2011 · Birla Estates Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 22 Dec 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 16 Jan 2026 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

116 OF 2011: 19 parcels, 13.275 acres in all, in Jharsa (hadbast 94), tehsil Wazirabad.

The licence register prints the same licensed area, 13.28 acres.

  • 37//207 kanal 12 marla
  • 37//217 kanal 12 marla
  • 38//12/23 kanal
  • 38//138 kanal
Show the other 15 parcels
  • 38//148 kanal
  • 38//168 kanal
  • 38//17/15 kanal 4 marla
  • 38//17/22 kanal 16 marla
  • 38//188 kanal
  • 38//23/11 kanal 8 marla
  • 38//23/26 kanal 12 marla
  • 38//24/12 kanal 16 marla
  • 38//24/25 kanal 4 marla
  • 38//25/16 kanal
  • 38//78 kanal
  • 38//8/14 kanal
  • 38//8/24 kanal
  • 38//98 kanal
  • 38//25/22 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Jharsa (hadbast 94), tehsil Wazirabad. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 37//20.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

6 files
Superimposed16 Apr 2026Revised Site Plan16 Apr 2026Site Plan (Green Area & Surface Parking Area)16 Apr 2026Site Plan (Green Area & Surface Parking Area)16 Apr 2026Site Plan Phase I & II16 Apr 2026Approved Site Plan14 Jan 2026

Layout plan

1 file
Latest Layout Plan6 Jan 2026

Building plans

23 files
Tower 5 Terrace and Mumty Plan Area Calculation16 Apr 2026EWS First, Second, Third Terrace Floor Plan and Area Calculation16 Apr 2026Tower 5 & 6 Elevation 216 Apr 2026Nursery School, Community Bldg 4 Section16 Apr 2026Tower 5 & 6 Elevation 116 Apr 2026BR-III16 Apr 2026

Floor plans

20 files
Tower 5 & 6 Stilt Ground Floor & Area Calculation16 Apr 2026Basement 2 Area Diagram16 Apr 2026Tower 5 & 616 Apr 2026Tower 4 Carpet Area16 Apr 2026Basement 1 Area Diagram16 Apr 2026Basement 2 Floor Plan16 Apr 2026

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (100 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3892 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Birla Estates

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.