About this project

Key facts

Location
Gurugram
Registered
23 Oct 2017
Timeline
  1. 23 Oct 2017Registered with HARERAHARERA, read 4 Nov 2026
  2. 22 Oct 2018Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside15,985 m² in all, by use
  • Parking7,475 m² · 47%
  • Other uses5,706 m² · 36%
  • Roads2,182 m² · 14%
  • Pavements416 m² · 3%
  • Green belts206 m² · 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningAHU installed
  • Lifts8 passenger + 1 service lift (schindler)
  • FloorsArrival lobby & lift lobby- imported marble, office/retail - concrete floor, staircase - KOTA
  • WallsOffice & retail – cement plastered walls, arrival lobby & lift lobby– imported marble/ acrylic emulsion paint, staircase – enamel paint, common toilets - vitrified tiles /acrylic emulsion paint
  • BathroomsCeramic/ vitrified tiles
  • WindowsAluminum glazing
  • Main doorMS FIRE doors/ aluminum
  • Electrical fittingsModular switch sockets in common area

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: PART-II, SECTOR-15 GURUGRAM, HARYANA

The builder

Its 17 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 11
  • Registered, no OC or CC yet: 3
  • Other register states: 3

Questions buyers ask

Is Commercial Project registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 329 OF 2017, registered on 23 Oct 2017. Ended 22 Oct 2018. The register shows it as: Registration expired.

The source ↗
How is the connectivity around Commercial Project?From the records · HARERA, read 4 Nov 2026

Commercial Project is in Gurugram; the site address declared to HARERA is Part-Ii, Sector-15 Gurugram, Haryana. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Commercial Project?From the records · HARERA, read 4 Nov 2026

Commercial Project is a Experion Developers project.

The source ↗Experion Developers's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Commercial Project: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 329 OF 2017: Registration expired. Ended 22 Oct 2018.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 63 OF 2008 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 19 Mar 2020.DTCP, read 3 Nov 2026
The court record of Experion Developers’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 22 Oct 2018. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 63 OF 2008 validity ended

    Named in this project’s application. Valid to 19 Mar 2020. The register links a completion certificate (LC-IX), dated 7 Feb 2018, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Licence 92 OF 2010 validity ended

    Named in this project’s application. Valid to 29 Oct 2020. The register links a completion certificate (LC-IX), dated 7 Feb 2018, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 22 HARERA files, with the dates we read them
Registration no.
329 OF 2017
Registration date
23 Oct 2017
Registration valid till
22 Oct 2018

Declared by the promoter to HARERA

Land area
3.95 (Acre) (15,985.08 sq m)
FAR
1.81 proposed of 1.87 permissible
licence
License No. 63 of 2008 dated 20.03.2008 and License No. 92 of 2010 dated 30.10.2010
Estimated project cost
₹300.85 crore
Cost of land
₹0.40 crore
Declared inventory · 1 type

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type · 553 units
Statutory approvals, as declared · 10

Statutory approvals, as declared

  • I. OCCUPATION CERTIFICATE — declared: already been obtained (15 Jan 2019)
  • II. OCCUPATION CERTIFICATE — declared: already been obtained (31 May 2022)
  • III. BUILDING PLAN APPROVAL — declared: already been obtained (7 Dec 2015)
  • IV. ENVIRONMENT CLEARANCE APPROVAL — declared: already been obtained (23 Oct 2013)
  • V. FOREST NOC — declared: already been obtained (10 Jan 2013)
  • VI. FIRE FIGHTING APPROVAL — declared: already been obtained (29 Mar 2017)
  • VII. AIRPORT HEIGHT CLEARANCE APPROVAL — declared: already been obtained (1 Jul 2015)
  • VIII. SERVICE PLAN ESTIMATE APPROVAL — declared: already been obtained (11 Sept 2018)
  • IX. ELECTRICITY APPROVAL — declared: already been obtained (21 Oct 2016)
  • X. HUDA CONSTRUCTION WATER NOC — declared: already been obtained (21 Aug 2013)
On file with HARERA · 22 files

On file with HARERA (22)

Plans

Site plan

1 file
Approved Site Plan15 Mar 2023

Layout plan

1 file
Latest Layout Plan1 Mar 2023

Zoning plan

1 file
Zoning Plan15 Mar 2023

Building plans

1 file
Approved Building Plans, Full Set1 Mar 2023

Services

Water supply

1 file
Water Connection Approval1 Mar 2023

Electricity

1 file
Electricity Approval15 Mar 2023

Service plans

1 file
Approved Service Estimate15 Mar 2023

Approvals and clearances

Occupation certificate (OC)

4 files
OC uploaded8 Aug 2023OC uploaded8 Aug 2023Oc uploaded8 Aug 2023Occupation Certificate1 Mar 2023

DTCP licence

1 file
Licence Copy with Land Schedule1 Mar 2023

Environment clearance

1 file
Environment Clearance Approval1 Mar 2023

Fire safety

1 file
Fire Fighting15 Mar 2023

Other NOCs and clearances

3 files
Aravali NOC15 Mar 2023Airport Height Clearance Approval15 Mar 2023Forest Approval1 Mar 2023

Land records

Land records

1 file
Registered Development Agreement15 Mar 2023

Money

Accounts and finance

3 files
CA Certificate on the Application’s Figures16 Mar 2023Non-Default Certificate from a CA1 Mar 2023Cash Flow Statement1 Mar 2023

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit15 Mar 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

63 OF 2008 · Experion Developers Pvt. Ltd. (Earlier known as Unitech Ltd. vide orders dt. 14/03/2016) · GURGAON-MANESAR

Licence valid to 19 Mar 2020

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

92 OF 2010 · Experion Developers Pvt. Ltd. (Earlier known as Unitech Ltd. vide orders dt. 14/03/2016) · GURGAON-MANESAR

Licence valid to 29 Oct 2020

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 16 Mar 2023 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 2 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

63 OF 2008: 16 parcels, 3.8375 acres in all, in Salokhera (hadbast 72), tehsil Wazirabad.

The licence register prints the same licensed area, 3.84 acres.

  • 30//14/23 kanal 1 marla
  • 30//14/31 kanal 16 marla
  • 30//15/1/1/21 kanal 4 marla
  • 30//16/2/13 marla
Show the other 12 parcels
  • 30//17/12 kanal 9 marla
  • 30//6/13 kanal 1 marla
  • 30//6/23 kanal
  • 30//6/318 marla
  • 30//6/412 marla
  • 30//7/16 kanal 9 marla
  • 30//7/33 marla
  • 30//7/45 marla
  • 30//8/2/218 marla
  • 30//15/1/1/13 kanal 15 marla
  • rectangle 30, kila 10/2/2/1/12 marla
  • 30//8/2/12 kanal 18 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

92 OF 2010: 2 parcels, 0.1125 acres in all, in Salokhera (hadbast 72), tehsil Wazirabad.

The licence register prints the same licensed area, 0.11 acres.

  • 30//7/2/14 marla
  • 30//7/2/214 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Salokhera (hadbast 72), tehsil Wazirabad. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 30//14/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan15 Mar 2023

Layout plan

1 file
Latest Layout Plan1 Mar 2023

Building plans

1 file
Approved Building Plans, Full Set1 Mar 2023

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (22 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2383 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Experion Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.