Skip to content

COMMERCIAL/ RESIDENTIAL COLONY

by Hl Residency · Jhajjar

Not on our price list yet

About this project

Key facts

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • Air-conditioningSplit/ VRF type
  • LiftsAutomatic passenger lift with proper controls
  • FloorsIPS flooring/stone/tiles
  • WallsCement plaster with POP punning and enable paint
  • BathroomsCP fitting and chinaware of standard brand
  • WindowsToughened glass of required fitness
  • Main doorGlass door/flush door
  • Electrical fittingsStandard LED fittings

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: HL CITY, SEC-37, BAHADURGARH

The builder

Its 19 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 4
  • Registered, no OC or CC yet: 9
  • Other register states: 6

Questions buyers ask

Is COMMERCIAL/ RESIDENTIAL COLONY registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 79 OF 2017. The register’s record shows an end date of 27 Jul 2022. The register shows it as: Registration lapsed.

The source ↗
How is the connectivity around COMMERCIAL/ RESIDENTIAL COLONY?From the records · HARERA, read 4 Nov 2026

COMMERCIAL/ RESIDENTIAL COLONY is in Jhajjar; the site address declared to HARERA is Hl City, Sec-37, Bahadurgarh. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building COMMERCIAL/ RESIDENTIAL COLONY?From the records · HARERA, read 4 Nov 2026

COMMERCIAL/ RESIDENTIAL COLONY is a Hl Residency project, registered by its company H L RESIDENCY PRIVATE LIMITED.

The source ↗Hl Residency's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for COMMERCIAL/ RESIDENTIAL COLONY: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 79 OF 2017: Registration lapsed. The register’s record shows an end date of 27 Jul 2022.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 90 OF 2017 is on the DTCP register: Licence lapsed; the register prints its validity to 5 Nov 2025.DTCP, read 3 Nov 2026
The court record of Hl Residency’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 90 OF 2017 lapsed

    Named in this project’s application. Valid to 5 Nov 2025; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 27 Jul 2022. HARERA Panchkula, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 12 HARERA files, with the dates we read them
Registration no.
79 OF 2017
Registration valid till
27 Jul 2022

Declared by the promoter to HARERA

Land area
3.0993 (Acre) (12,542.42 sq m)
FAR
1.84 proposed of 1.84 permissible
licence
commercial colony vide licence no 59 and 90 of 2017
Estimated project cost
₹85.00 crore
Cost of land
₹0.93 crore
Declared inventory · 72 types

Declared inventory — 72 types declared, first 8 shown

  • APARTMENT/SHOPS/OTHER BUILDINGS Type SHOP/OFFICE · 2 units · 8.42 sq m carpet · a unit for another use, left out of home sizes
  • APARTMENT/SHOPS/OTHER BUILDINGS Type SHOP/OFFICE · 1 unit · 9.92 sq m carpet · a unit for another use, left out of home sizes
  • APARTMENT/SHOPS/OTHER BUILDINGS Type SHOP/OFFICE · 1 unit · 11.55 sq m carpet · a unit for another use, left out of home sizes
  • APARTMENT/SHOPS/OTHER BUILDINGS Type SHOP/OFFICE · 1 unit · 13.3 sq m carpet · a unit for another use, left out of home sizes
  • APARTMENT/SHOPS/OTHER BUILDINGS Type SHOP/OFFICE · 2 units · 14.81 sq m carpet · a unit for another use, left out of home sizes
  • APARTMENT/SHOPS/OTHER BUILDINGS Type SHOP/OFFICE · 1 unit · 14.91 sq m carpet · a unit for another use, left out of home sizes
  • APARTMENT/SHOPS/OTHER BUILDINGS Type SHOP/OFFICE · 2 units · 15.18 sq m carpet · a unit for another use, left out of home sizes
  • APARTMENT/SHOPS/OTHER BUILDINGS Type SHOP/OFFICE · 2 units · 15.63 sq m carpet · a unit for another use, left out of home sizes
Statutory approvals, as declared · 6

Statutory approvals, as declared

  • I. LICENSE NO 59 OF 2017 — declared: already been obtained (28 Jul 2017)
  • II. LICENSE NO 90 OF 2017 — declared: already been obtained (6 Nov 2017)
  • III. BUILDING PLAN APPROVAL — declared: already been obtained (25 Jan 2018)
  • IV. ENVIORNMENTAL CLEARENCE — declared: already been obtained (4 Apr 2018)
  • V. CTE FROM HARYANA STATE POLUTION CONTROL BOARD — declared: already been obtained (29 Sept 2019)
  • VI. RERA REGISTRATION CERTIFICATE — declared: already been obtained (23 Aug 2017)
On file with HARERA · 12 files

On file with HARERA (12)

Plans

Site plan

1 file
Approved Site Plan3 Nov 2019

Layout plan

1 file
Latest Layout Plan3 Nov 2019

Zoning plan

1 file
Zoning Plan3 Nov 2019

Demarcation plan

1 file
Demarcation Plan3 Nov 2019

Building plans

1 file
Approved Building Plans, Full Set3 Nov 2019

Services

Service plans

1 file
Service Plans on the Layout3 Nov 2019

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule3 Nov 2019

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration3 Nov 2019

Money

Accounts and finance

3 files
Non-Default Certificate from a CA7 Nov 2019CA Certificate on the Application’s Figures7 Nov 2019Cash Flow Statement7 Nov 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit7 Nov 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

90 OF 2017 · HL RESIDENCY PVT LTD · BAHADURGARH

Licence valid to 5 Nov 2025

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

59 OF 2017 · H.L. Residency Pvt. Ltd. · Bahadurgarh

Licence valid to 27 Jul 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Panchkula bench · submitted 7 Nov 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/1 · fetched 4 Nov 2026

Land under the 2 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

90 OF 2017: 5 parcels, 0.7118 acres in all, in Barktabad (hadbast 63), tehsil Bahadurgarh.

The licence register prints the same licensed area, 0.7118 acres.

  • 22//1/1/1/2 MIN2 kanal 8 marla 7 sarsai
  • 22//10/2 MIN2 kanal 7 marla
  • 23//5/1/26 marla 5 sarsai
  • 23//5/2/26 marla
Show the other 1 parcel
  • 23//6 MIN5 marla 5 sarsai

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

59 OF 2017: 8 parcels, 2.3875 acres in all, in Barktabad (hadbast 63), tehsil Bahadurgarh.

The licence register prints the same licensed area, 2.39 acres.

  • 23//4/2 min1 marla
  • 23//5/1/2 min5 kanal 2 marla
  • 23//6 min7 kanal 15 marla
  • 23//7/1/1 min8 marla
Show the other 4 parcels
  • 23//7/1/2 min14 marla
  • 12//19/31 kanal 9 marla
  • 12//20/2/117 marla
  • 12//21/22 kanal 16 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Jhajjar, then the tehsil and the village: Barktabad (hadbast 63), tehsil Bahadurgarh. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 22//1/1/1/2 MIN.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan3 Nov 2019

Layout plan

1 file
Latest Layout Plan3 Nov 2019

Building plans

1 file
Approved Building Plans, Full Set3 Nov 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (12 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/827 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Hl Residency

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Panchkula records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.