Key facts
- 22 Jan 2026Building plans approveddeclared to HARERA, read 29 Oct 2026
- 21 Jan 2031Possession, as declareddeclared to HARERA, read 29 Oct 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Roads734 m² · 30%
- Parks and playgrounds508 m² · 20%
- Parking467 m² · 19%
- Other usesas the form names them: Basement297 m² · 12%
- Apartment buildings264 m² · 11%
- Green belts123 m² · 5%
- Pavements83 m² · 3%
- Electricity sub-station11 m² · under 1%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioning5-STAR rated inverter split AC ( daikin or equivalent)
- KitchenGranite or quartz (cambria quartz surfaces or equivalent make), E1 grade board with low-VOC laminate (century PLY or equivalent make), water-efficient faucets (kohler or equivalent make), 5-STAR rated refrigerator (samsung or equivalent make) and low-noise chimney (faber or equivalent make)
- Kitchen appliancesLow-noise chimney (faber or equivalent make)
- LiftsPassenger lifts (schindler or equivalent make) equipped with regenerative braking system, VVVF drive control and LED cabin lighting.
- WardrobesE1-grade board with low-VOC laminate
- FloorsVitrified tiles/ engineered wood (simpolo or equivalent make)
- WallsLow-VOC acrylic emulsion paint (dulux or equivalent make)
- BathroomsSanitary WARE, faucets, showers and accessories (kohler or equivalent make) and sealants/grout (MYK laticrete india PVT. LTD. or equivalent make)
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR-5C MDC
The builder
- Registered, no OC or CC yet: 1
Questions buyers ask
Is CROWN -5 registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as HRERA-PKL-PKL-882-2026. Valid to 21 Jan 2031.
The source ↗What is the possession timeline for CROWN -5?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 21 Jan 2031. Its registration runs to 21 Jan 2031; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around CROWN -5?From the records · HARERA, read 4 Nov 2026
CROWN -5 is in Panchkula; the site address declared to HARERA is Sector-5c Mdc. Bhumiq has not measured its distance to the main roads and metro lines yet.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building CROWN -5?From the records · HARERA, read 4 Nov 2026
The records
What the registers hold for CROWN -5: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration HRERA-PKL-PKL-882-2026: Registered. Valid to 21 Jan 2031.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Plans approved, as the developer declared: building plans 22 Jan 2026.Declared to HARERA, read 29 Oct 2026
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 6 HARERA files, with the dates we read them
- Registration no.
- HRERA-PKL-PKL-882-2026
- Registration valid till
- 21 Jan 2031
- Declared possession
- 21 Jan 2031
Declared by the promoter to HARERA
- Land area
- 2487.62 (Sqr/mtrs)
- FAR
- 1.75 proposed of 1.75 permissible
- licence
- ALLOTMENT BY HSVP VIDE MEMO NO ZO004/EO012/UE020/REALL/0000002115, DATED-28-06-2024, POSSESSION CERTIFICATE VIDE MEMO NO 2665 DATED 01/07/2024
- Estimated project cost
- ₹75.00 crore
- Cost of land
- ₹31.80 crore
- Building plans, declared approved
- 22 Jan 2026
- Construction to start
- 1 Mar 2026
- Completion declared for
- 21 Jan 2031
Declared inventory · 2 types
Declared inventory
- Apartment/Shops/Other Buildings · 12 units · 368 sq m carpet · one flat
- Apartment/Shops/Other Buildings · 1 unit · 211 sq m carpet · one flat
Statutory approvals, as declared · 4
Statutory approvals, as declared
- I. RE-ALLOTMENT LETTER BY HSVP — declared: already been obtained (28 Mar 2025)
- II. APPROVAL OF BUILDING PLANS — declared: already been obtained (22 Jan 2026)
- III. POSSESSION CERTIFICATE — declared: already been obtained (1 Jul 2024)
- IV. APPROVAL OF ZONING PLAN — declared: already been obtained (14 Oct 2023)
On file with HARERA · 6 files
On file with HARERA (6)
Plans
Site plan
1 fileLayout plan
1 fileApprovals and clearances
DTCP licence
1 fileSales papers
Payment plan
1 fileMoney
Accounts and finance
1 fileThe promoter’s papers
Declarations and affidavits
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
The promoter declared ALLOTMENT BY HSVP VIDE MEMO NO ZO004/EO012/UE020/REALL/0000002115, DATED-28-06-2024, POSSESSION CERTIFICATE VIDE MEMO NO 2665 DATED 01/07/2024. We could not read a licence number from that, so nothing is claimed about it here.
declared in the registration application (Form REP-I), Panchkula bench · submitted 5 Mar 2026 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/1 · fetched 4 Nov 2026
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 filePayment plan
1 fileAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (6 in all), none is a building plan or a floor plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/3792 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Harish Kumar Gupta