Skip to content

CROWN -5

by Harish Kumar Gupta · Panchkula

Not on our price list yet

Possession 21 Jan 2031 · as the developer declared it to HARERA

About this project

Key facts

Location
Panchkula
Carpet area
2,271–3,961 sq ft
In m²211–368 m², as declared
Timeline
  1. 22 Jan 2026Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 21 Jan 2031Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside2,488 m² in all, by use
  • Roads734 m² · 30%
  • Parks and playgrounds508 m² · 20%
  • Parking467 m² · 19%
  • Other usesas the form names them: Basement297 m² · 12%
  • Apartment buildings264 m² · 11%
  • Green belts123 m² · 5%
  • Pavements83 m² · 3%
  • Electricity sub-station11 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioning5-STAR rated inverter split AC ( daikin or equivalent)
  • KitchenGranite or quartz (cambria quartz surfaces or equivalent make), E1 grade board with low-VOC laminate (century PLY or equivalent make), water-efficient faucets (kohler or equivalent make), 5-STAR rated refrigerator (samsung or equivalent make) and low-noise chimney (faber or equivalent make)
  • Kitchen appliancesLow-noise chimney (faber or equivalent make)
  • LiftsPassenger lifts (schindler or equivalent make) equipped with regenerative braking system, VVVF drive control and LED cabin lighting.
  • WardrobesE1-grade board with low-VOC laminate
  • FloorsVitrified tiles/ engineered wood (simpolo or equivalent make)
  • WallsLow-VOC acrylic emulsion paint (dulux or equivalent make)
  • BathroomsSanitary WARE, faucets, showers and accessories (kohler or equivalent make) and sealants/grout (MYK laticrete india PVT. LTD. or equivalent make)

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR-5C MDC

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Questions buyers ask

Is CROWN -5 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as HRERA-PKL-PKL-882-2026. Valid to 21 Jan 2031.

The source ↗
What is the possession timeline for CROWN -5?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 21 Jan 2031. Its registration runs to 21 Jan 2031; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around CROWN -5?From the records · HARERA, read 4 Nov 2026

CROWN -5 is in Panchkula; the site address declared to HARERA is Sector-5c Mdc. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building CROWN -5?From the records · HARERA, read 4 Nov 2026

CROWN -5 is a Harish Kumar Gupta project.

The source ↗Harish Kumar Gupta's projects and court record

The records

What the registers hold for CROWN -5: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration HRERA-PKL-PKL-882-2026: Registered. Valid to 21 Jan 2031.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Plans approved, as the developer declared: building plans 22 Jan 2026.Declared to HARERA, read 29 Oct 2026
The court record of Harish Kumar Gupta’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 6 HARERA files, with the dates we read them
Registration no.
HRERA-PKL-PKL-882-2026
Registration valid till
21 Jan 2031
Declared possession
21 Jan 2031

Declared by the promoter to HARERA

Land area
2487.62 (Sqr/mtrs)
FAR
1.75 proposed of 1.75 permissible
licence
ALLOTMENT BY HSVP VIDE MEMO NO ZO004/EO012/UE020/REALL/0000002115, DATED-28-06-2024, POSSESSION CERTIFICATE VIDE MEMO NO 2665 DATED 01/07/2024
Estimated project cost
₹75.00 crore
Cost of land
₹31.80 crore
Building plans, declared approved
22 Jan 2026
Construction to start
1 Mar 2026
Completion declared for
21 Jan 2031
Declared inventory · 2 types

Declared inventory

  • Apartment/Shops/Other Buildings · 12 units · 368 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 211 sq m carpet · one flat
Statutory approvals, as declared · 4

Statutory approvals, as declared

  • I. RE-ALLOTMENT LETTER BY HSVP — declared: already been obtained (28 Mar 2025)
  • II. APPROVAL OF BUILDING PLANS — declared: already been obtained (22 Jan 2026)
  • III. POSSESSION CERTIFICATE — declared: already been obtained (1 Jul 2024)
  • IV. APPROVAL OF ZONING PLAN — declared: already been obtained (14 Oct 2023)
On file with HARERA · 6 files

On file with HARERA (6)

Plans

Site plan

1 file
Approved Site Plan2 Feb 2026

Layout plan

1 file
Latest Layout Plan5 Mar 2026

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule10 Feb 2026

Sales papers

Payment plan

1 file
Payment Plan8 Apr 2026

Money

Accounts and finance

1 file
Non-Default Certificate from a CA5 Mar 2026

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit26 Feb 2026

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared ALLOTMENT BY HSVP VIDE MEMO NO ZO004/EO012/UE020/REALL/0000002115, DATED-28-06-2024, POSSESSION CERTIFICATE VIDE MEMO NO 2665 DATED 01/07/2024. We could not read a licence number from that, so nothing is claimed about it here.

declared in the registration application (Form REP-I), Panchkula bench · submitted 5 Mar 2026 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/1 · fetched 4 Nov 2026

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan2 Feb 2026

Layout plan

1 file
Latest Layout Plan5 Mar 2026

Payment plan

1 file
Payment Plan8 Apr 2026

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (6 in all), none is a building plan or a floor plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3792 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Harish Kumar Gupta

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Panchkula records showed the facts above. Statuses change. Verify at the portal for transactions.