ELDECO AMAYA COMMERCIAL
by Eldeco Green Park Infrastructure · Sonipat
Not on our price list yet
Possession 16 May 2028 · as the developer declared it to HARERA
About this project
Key facts
- Registered by
- ELDECO GREEN PARK INFRASTRUCTURE LIMITEDthe company that filed it, for Eldeco Green Park Infrastructure
- 20 Sep 2024Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 16 May 2028Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- Under 1,000 sq ft572–586 sq ft12
- 1,000–1,500 sq ft1,103–1,123 sq ft6
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 1 row of a single unit and 4 units under 25 m², because the form lists homes, shops and other buildings in one table.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Parking1,354 m² · 61%
- Apartment buildings840 m² · 38%
- Other uses40 m² · 2%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- KitchenServices: internal electrical electrical LOAD in built-up units shall be as per the local electrical department modular switches, sockets, and copper wiring shall be provided-make-anchor/panasonic/ABB/greatwhite or equivalent brands water and drainage one water point, drain point & waste point shall be provided in the SHOP
- FloorsInternal shops: internal finish oil bound distemper (OBD) on walls and ceiling-make-asian/nerollac/birla OPUS/bergert/dulux or equivalent brands flooring vitrified tiles make—kajaria /somany/simpolo/sunheart/varmora/orient-BELL or equivalent brands staircase steps & riser finished in stone with MS railing SHOP entry lockable toughened glass door - ground floor flush door shutter & hardwood frame with enamel paint - first & second floor
- WallsExternal & common areas external wall finish combination of texture paint finish and tile- make-asian/nerollac/birla OPUS/bergert/dulux or equivalent brands corridor/ lobby flooring marble
- BathroomsWASH basin: WASH basin without counter fittings & fixtures: good quality C.P. fittings and english type WC in white color
- WindowsGround floor unit-lockable toughened glass door first floor unit—hardwood frame with flush shutter in enamel paint second floor unit—hard wood frame with flush shutter in enamel paint common toilet doors: good quality C.P. fittings and english type WC in white color windows: powder coated with aluminum shutter and glazing
- Electrical fittingsInternal electrical electrical LOAD in built-up units shall be as per the local electrical department, modular switches, sockets, and copper wiring shall be provided
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
Bhumiq holds no map point for this project yet.The site address declared to HARERA: SONIPAT
The builder
- Registered, no OC or CC yet: 3
- Other register states: 1
Questions buyers ask
Is ELDECO AMAYA COMMERCIAL registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as HRERA-PKL-SNP-701-2025. Valid to 16 May 2028.
The source ↗What is the possession timeline for ELDECO AMAYA COMMERCIAL?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 16 May 2028. Its registration runs to 16 May 2028; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around ELDECO AMAYA COMMERCIAL?From the records · HARERA, read 4 Nov 2026
ELDECO AMAYA COMMERCIAL is in Sonipat; the site address declared to HARERA is Sonipat. Bhumiq has not measured its distance to the main roads and metro lines yet.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building ELDECO AMAYA COMMERCIAL?From the records · HARERA, read 4 Nov 2026
ELDECO AMAYA COMMERCIAL is a Eldeco Green Park Infrastructure project, registered by its company ELDECO GREEN PARK INFRASTRUCTURE LIMITED.
The source ↗Eldeco Green Park Infrastructure's projects and court recordThe records
What the registers hold for ELDECO AMAYA COMMERCIAL: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration HRERA-PKL-SNP-701-2025: Registered. Valid to 16 May 2028.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 109 OF 2023 is on the DTCP register, valid to 16 May 2028.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 20 Sep 2024, building plans 20 Sep 2024.Declared to HARERA, read 29 Oct 2026
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 12 HARERA files, with the dates we read them
- Registration no.
- HRERA-PKL-SNP-701-2025
- Registration valid till
- 16 May 2028
- Declared possession
- 16 May 2028
Declared by the promoter to HARERA
- Land area
- 0.551 (Acre) (2,229.82 sq m)
- FAR
- 0.92 proposed of 1.5 permissible
- licence
- License no 109 of 2023
- Estimated project cost
- ₹13.79 crore
- Cost of land
- ₹2.07 crore
- Layout plan, declared approved (field 5a)
- 20 Sept 2024; Part E of the same form gives 3 Mar 2023
- Building plans, declared approved
- 20 Sept 2024
- Construction to start
- 1 Dec 2024
- Completion declared for
- 16 May 2028
Declared inventory · 10 types
Declared inventory — 10 types declared, first 8 shown
- Apartment/Shops/Other Buildings · 2 units · 18.04 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 2 units · 13.87 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 2 units · 102.46 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 4 units · 104.29 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 2 units · 53.35 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 2 units · 53.16 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 4 units · 54.39 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 4 units · 54.42 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 6
Statutory approvals, as declared
- I. LICENSE — declared: already been obtained (17 May 2023)
- II. DEMARCATION — declared: already been obtained (25 May 2023)
- III. ZONING PLAN — declared: already been obtained (7 Jul 2023)
- IV. LATEST LAYOUT PLAN — declared: already been obtained (3 Mar 2023)
- V. BUILDING PLAN 1 — declared: already been obtained (16 Apr 2024)
- VI. BUILDING PLAN 2 — declared: already been obtained (20 Sept 2024)
On file with HARERA · 12 files
On file with HARERA (12)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
1 fileServices
Service plans
1 fileApprovals and clearances
DTCP licence
1 fileLand records
Land records
1 fileMoney
Accounts and finance
3 filesThe promoter’s papers
Declarations and affidavits
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
109 OF 2023 · Eldeco Green Park Infrastructure Ltd. · Sonipat
Licence valid to 16 May 2028
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Panchkula bench · submitted 19 Mar 2025 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/1 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
109 OF 2023: 31 parcels, 14.2063 acres in all, in Rathdhana (hadbast 64), tehsil Sonipat.
The licence register prints the same licensed area, 14.2063 acres.
- 65//1/2/14 kanal 2 marla
- 65//10/27 kanal 15 marla
- 65//11/2/1/219 marla
- 65//11/2/31 kanal 6 marla
Show the other 27 parcels
- 65//12/1/117 marla
- 65//12/2/112 marla
- 65//20/14 kanal 14 marla
- 65//9/37 marla
- 57//18/22 kanal 12 marla
- 57//19/26 kanal 4 marla
- 57//227 kanal 12 marla
- 57//23/12 kanal 4 marla
- 66//10/13 kanal 11 marla
- 66//10/2/11 kanal
- 66//148 kanal
- 66//15/13 kanal
- 66//15/22 kanal 14 marla
- 66//16/2/12 kanal 19 marla
- 66//17/1/119 marla
- 66//27 kanal 2 marla
- 66//25/26 kanal 16 marla
- 66//268 marla
- 66//3/14 kanal 11 marla
- 66//4/22 kanal 18 marla
- 66//56 kanal 2 marla
- 66//6/15 kanal 4 marla
- 66//7/25 kanal 15 marla
- 66//7/31 kanal 16 marla
- 66//8/27 kanal 4 marla
- 66//9/13 kanal 16 marla
- rectangle 57, kila 23/114 marla
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Sonipat, then the tehsil and the village: Rathdhana (hadbast 64), tehsil Sonipat. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 65//1/2/1.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
1 fileAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (12 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/3319 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Eldeco Green Park Infrastructure
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Panchkula records showed the facts above. Statuses change. Verify at the portal for transactions.