ELDECO AMAYA VILLA
by Eldeco Green Park Infrastructure · Sonipat
Not on our price list yet
Possession 16 May 2028 · as the developer declared it to HARERA
About this project
Key facts
- Registered by
- ELDECO GREEN PARK INFRSTRUCTURE LIMITEDthe company that filed it, for Eldeco Green Park Infrastructure
- 3 Mar 2023Layout plan approveddeclared to HARERA, read 29 Oct 2026
- 16 Apr 2024Building plans approveddeclared to HARERA, read 29 Oct 2026
- 16 May 2028Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- 1,000–1,500 sq ft1,120–1,454 sq ft46
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Apartment buildings4,709 m² · 100%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- KitchenWall - 2 FEET DADO vitrifed tiles and REST to bdcounter-granite fitting and fixtures- good quality C.P. fittings, stainless steel single bowl sink with drain board. without woodwork &appliances;.
- FloorsLiving room/ bed room- imported marble staircase-marble roof terrace-brickbatcoba toilet- vitrifed tiles verandh/balcony- vitrified tiles drive WAY-pavers utility court YARD- KOTA stone side terrace- ceramic tiles.
- WallsOil bound distemper (OBD) on walls and ceiling
- BathroomsGood quality C.P. fittings, english type WC and WASH basin in white shade
- WindowsExternal doors & windows UPVC shuttersand glazing
- Main doorHard wood door frame with flush shutter in laminate
- Electrical fittingsGood quality modular switches and sockets,copper wiring. (fittings LIKE fans, geysers,light fixtures, appliances ETC. not provided),provision for AIR conditioning ( AC units notincluded )
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
Bhumiq holds no map point for this project yet.The site address declared to HARERA: SONIPAT
The builder
- Registered, no OC or CC yet: 3
- Other register states: 1
Questions buyers ask
Is ELDECO AMAYA VILLA registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as HRERA-PKL-SNP-629-2024. Valid to 16 May 2028.
The source ↗What is the possession timeline for ELDECO AMAYA VILLA?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 16 May 2028. Its registration runs to 16 May 2028; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around ELDECO AMAYA VILLA?From the records · HARERA, read 4 Nov 2026
ELDECO AMAYA VILLA is in Sonipat; the site address declared to HARERA is Sonipat. Bhumiq has not measured its distance to the main roads and metro lines yet.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building ELDECO AMAYA VILLA?From the records · HARERA, read 4 Nov 2026
ELDECO AMAYA VILLA is a Eldeco Green Park Infrastructure project, registered by its company ELDECO GREEN PARK INFRSTRUCTURE LIMITED.
The source ↗Eldeco Green Park Infrastructure's projects and court recordThe records
What the registers hold for ELDECO AMAYA VILLA: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration HRERA-PKL-SNP-629-2024: Registered. Valid to 16 May 2028.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 109 OF 2023 is on the DTCP register, valid to 16 May 2028.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 3 Mar 2023, building plans 16 Apr 2024.Declared to HARERA, read 29 Oct 2026
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 13 HARERA files, with the dates we read them
- Registration no.
- HRERA-PKL-SNP-629-2024
- Registration valid till
- 16 May 2028
- Declared possession
- 16 May 2028
Declared by the promoter to HARERA
- Land area
- 4709.24 (Sqr/mtrs)
- FAR
- 2 proposed of 2 permissible
- licence
- License no. 109 of 2023
- Estimated project cost
- ₹32.50 crore
- Cost of land
- ₹4.36 crore
- Layout plan, declared approved (field 5a)
- 3 Mar 2023
- Building plans, declared approved
- 16 Apr 2024
- Construction to start
- 1 Oct 2024
- Completion declared for
- 16 May 2028
Declared inventory · 7 types
Declared inventory
- Apartment/Shops/Other Buildings · 7 units · 104.05 sq m carpet · one flat
- Apartment/Shops/Other Buildings · 4 units · 110.69 sq m carpet · one flat
- Apartment/Shops/Other Buildings · 8 units · 125.88 sq m carpet · one flat
- Apartment/Shops/Other Buildings · 4 units · 126.56 sq m carpet · one flat
- Apartment/Shops/Other Buildings · 6 units · 128.92 sq m carpet · one flat
- Apartment/Shops/Other Buildings · 11 units · 129.31 sq m carpet · one flat
- Apartment/Shops/Other Buildings · 6 units · 135.09 sq m carpet · one flat
Statutory approvals, as declared · 5
Statutory approvals, as declared
- I. I. LICENSE — declared: already been obtained (17 May 2023)
- II. II. DEMARCATION — declared: already been obtained (25 May 2023)
- III. III. ZONING PLAN — declared: already been obtained (7 Jul 2023)
- IV. IV. LATEST LAYOUT PLAN — declared: already been obtained (3 Mar 2023)
- V. V. BUILDING PLANS — declared: already been obtained (16 Apr 2024)
On file with HARERA · 13 files
On file with HARERA (13)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
2 filesServices
Service plans
1 fileApprovals and clearances
DTCP licence
1 fileLand records
Land records
1 fileMoney
Accounts and finance
3 filesThe promoter’s papers
Declarations and affidavits
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
109 OF 2023 · Eldeco Green Park Infrastructure Ltd. · Sonipat
Licence valid to 16 May 2028
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Panchkula bench · submitted 3 Sept 2024 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/1 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
109 OF 2023: 31 parcels, 14.2063 acres in all, in Rathdhana (hadbast 64), tehsil Sonipat.
The licence register prints the same licensed area, 14.2063 acres.
- 65//1/2/14 kanal 2 marla
- 65//10/27 kanal 15 marla
- 65//11/2/1/219 marla
- 65//11/2/31 kanal 6 marla
Show the other 27 parcels
- 65//12/1/117 marla
- 65//12/2/112 marla
- 65//20/14 kanal 14 marla
- 65//9/37 marla
- 57//18/22 kanal 12 marla
- 57//19/26 kanal 4 marla
- 57//227 kanal 12 marla
- 57//23/12 kanal 4 marla
- 66//10/13 kanal 11 marla
- 66//10/2/11 kanal
- 66//148 kanal
- 66//15/13 kanal
- 66//15/22 kanal 14 marla
- 66//16/2/12 kanal 19 marla
- 66//17/1/119 marla
- 66//27 kanal 2 marla
- 66//25/26 kanal 16 marla
- 66//268 marla
- 66//3/14 kanal 11 marla
- 66//4/22 kanal 18 marla
- 66//56 kanal 2 marla
- 66//6/15 kanal 4 marla
- 66//7/25 kanal 15 marla
- 66//7/31 kanal 16 marla
- 66//8/27 kanal 4 marla
- 66//9/13 kanal 16 marla
- rectangle 57, kila 23/114 marla
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Sonipat, then the tehsil and the village: Rathdhana (hadbast 64), tehsil Sonipat. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 65//1/2/1.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
2 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (13 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/3036 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Eldeco Green Park Infrastructure
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Panchkula records showed the facts above. Statuses change. Verify at the portal for transactions.