Not on our price list yet

Possession 30 Nov 2024 · as the developer declared it to HARERA

About this project

Key facts

Location
Panchkula
Carpet area
612–928 sq ft
In m²about 57–86 m², as declared
Registered by
ELDECO INFRASTRUCTURE AND PROPERTIES LIMITEDthe company that filed it, for Ansal Properties & Infrastructure
Timeline
  1. 12 Dec 2019Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 2 Jul 2020Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 30 Nov 2024Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

42homes, 612 to 928 sq ft of carpet area
  • Under 1,000 sq ft612–928 sq ft42

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 1 row of a single unit, because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside52,963 m² in all, by use
  • Plots for sale25,008 m² · 47%
  • Roads14,979 m² · 28%
  • Land for community services, handed to the government5,297 m² · 10%
  • Parks and playgrounds3,997 m² · 8%
  • Other usesas the form names them: UGT (underground water tank), Milk1,402 m² · 3%
  • Shops and offices1,023 m² · 2%
  • Club house723 m² · 1%
  • Sewage and waste treatment342 m² · under 1%
  • Electricity sub-station194 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenCounter – granite/ marble fittings and fixtures - chrome plated (CP) faucets and fittings, stainless steel single bowl sink with single drain board. without appliances
  • Kitchen appliancesStainless steel single bowl sink with single drain board. without appliances
  • FloorsVitrified tiles / ceramic tiles – as per design
  • WallsTexture paint / cement paint / oil bound distemper (OBD) / ceramic tiles - as per design
  • BathroomsFittings and fixtures - chrome plated (CP) fittings, english type WC. WASH basin & EWC shall be in white shade
  • WindowsGlazing on external door/windows - as per design
  • Main doorHard wood door frame with FLAT SKIN flush doors with enamel / DECO paint
  • Electrical fittingsModular switches and sockets, copper wiring without any appliances

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: VILLAGE KOT BEHLA, SECTOR 16

The builder

Its 22 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2
  • Registered, no OC or CC yet: 2
  • Other register states: 18

Questions buyers ask

Is ELDECO ARANYA registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as HRERA-PKL-PKL-221-2020. Ended 30 Nov 2024. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for ELDECO ARANYA?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Nov 2024. Its registration runs to 30 Nov 2024; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ELDECO ARANYA?From the records · HARERA, read 4 Nov 2026

ELDECO ARANYA is in Panchkula; the site address declared to HARERA is Village Kot Behla, Sector 16. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ELDECO ARANYA?From the records · HARERA, read 4 Nov 2026

ELDECO ARANYA is a Ansal Properties & Infrastructure project, registered by its company ELDECO INFRASTRUCTURE AND PROPERTIES LIMITED.

The source ↗Ansal Properties & Infrastructure's projects and court record

The records

What the registers hold for ELDECO ARANYA: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration HRERA-PKL-PKL-221-2020: Registration expired. Ended 30 Nov 2024.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 132 OF 2019 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 11 Dec 2024.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 12 Dec 2019, building plans 2 Jul 2020.Declared to HARERA, read 29 Oct 2026
The court record of Ansal Properties & Infrastructure’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 30 Nov 2024. HARERA Panchkula, read 4 Nov 2026. Source

  • Amber flag: Licence 132 OF 2019 validity ended

    Named in this project’s application. Valid to 11 Dec 2024. The register links a completion certificate (LC-IX), dated 8 Aug 2023, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 14 HARERA files, with the dates we read them
Registration no.
HRERA-PKL-PKL-221-2020
Registration valid till
30 Nov 2024
Declared possession
30 Nov 2024

Declared by the promoter to HARERA

Land area
13.0875 (Acre) (52,963.23 sq m)
FAR
0 proposed
licence
132 of 2019
Estimated project cost
₹47.14 crore
Cost of land
₹5.03 crore
Layout plan, declared approved (field 5a)
12 Dec 2019
Building plans, declared approved
2 Jul 2020
Construction to start
1 Aug 2020
Completion declared for
30 Nov 2024
Declared inventory · 5 types

Declared inventory

  • Apartment/Shops/Other Buildings · 9 units · 68.77 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 68.2 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 21 units · 56.84 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 3 units · 56.92 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 9 units · 86.17 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 8

Statutory approvals, as declared

  • I. LAY OUT PLAN — declared: already been obtained (12 Dec 2019)
  • II. DEMARCATION PLAN — declared: already been obtained (9 Jan 2020)
  • III. ZONING PLAN — declared: already been obtained (11 Mar 2020)
  • IV. BUILDING PLAN, — declared: already been obtained (2 Jul 2020)
  • V. ELEVATION SECTION — declared: already been obtained (2 Jul 2020)
  • VI. ELECTRICITY SUPPLY PLAN — declared: yet to file for approval
  • VII. RADS AND PAVEMENT PLAN — declared: yet to file for approval
  • VIII. STORM WATER DRAINAGE — declared: yet to file for approval
On file with HARERA · 14 files

On file with HARERA (14)

Plans

Site plan

1 file
Approved Site Plan16 Mar 2020

Layout plan

1 file
Latest Layout Plan16 Mar 2020

Zoning plan

1 file
Zoning Plan16 Mar 2020

Demarcation plan

1 file
Demarcation Plan16 Mar 2020

Building plans

1 file
Approved Building Plans, Full Set27 Jul 2020

Approvals and clearances

Completion certificate (CC)

1 file
Completion Certificate uploaded30 Jan 2025

DTCP licence

1 file
Licence Copy with Land Schedule16 Mar 2020

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration4 Mar 2022

Money

Accounts and finance

1 file
Non-Default Certificate from a CA16 Mar 2020

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit27 Jul 2020

HARERA’s orders

HARERA’s orders

4 files
corrigendum6 Oct 2025Corrigendum Uploaded20 Jun 2023Addendum27 Jan 2023Corrigendum Issued30 Apr 2021

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

132 OF 2019 · Pigeon Infrastructure Ltd. · PANCHKULA EXTENSION

Licence valid to 11 Dec 2024

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Panchkula bench · submitted 10 Nov 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/1 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

132 OF 2019: 26 parcels, 13.0875 acres in all, in Bihla (hadbast 237), tehsil Panchkula.

The licence register prints the same licensed area, 13.0875 acres.

  • 92//13/12 kanal
  • 92//13/24 kanal 16 marla
  • 92//147 kanal 7 marla
  • 92//158 kanal
Show the other 22 parcels
  • 92//16/12 kanal 13 marla
  • 92//17/12 kanal 13 marla
  • 92//18/15 kanal 8 marla
  • 92//47 kanal 12 marla
  • 92//5/17 kanal 7 marla
  • 92//5/213 marla
  • 92//6/12 kanal 15 marla
  • 92//6/25 kanal 5 marla
  • 92//77 kanal 12 marla
  • 92//8/12 kanal 12 marla
  • 93//1/16 kanal 4 marla
  • 93//1/218 marla
  • 93//10/17 kanal 14 marla
  • 93//10/26 marla
  • 93//11/12 kanal
  • 93//11/26 kanal
  • 93//127 kanal 2 marla
  • 93//8/1 min3 marla
  • 93//8/2 min1 kanal 17 marla
  • 93//9/1 min1 kanal 4 marla
  • 93//9/24 kanal 6 marla
  • rectangle 93, kila 7/3/1/2 min7 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Panchkula, then the tehsil and the village: Bihla (hadbast 237), tehsil Panchkula. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 92//13/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan16 Mar 2020

Layout plan

1 file
Latest Layout Plan16 Mar 2020

Building plans

1 file
Approved Building Plans, Full Set27 Jul 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (14 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1281 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Ansal Properties & Infrastructure

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Panchkula records showed the facts above. Statuses change. Verify at the portal for transactions.