Skip to content

ELDECO PARADISO

by Eldeco Green Park Infrastructure · Panipat

Not on our price list yet

Possession 16 Jan 2025 · as the developer declared it to HARERA

About this project

Key facts

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside1,43,031 m² in all, by use
  • Roads45,203 m² · 32%
  • Other uses32,226 m² · 23%
  • Plots for sale31,093 m² · 22%
  • Land for community services, handed to the government14,310 m² · 10%
  • Parks and playgrounds10,753 m² · 8%
  • Club house4,460 m² · 3%
  • Green belts3,922 m² · 3%
  • Sewage and waste treatment765 m² · under 1%
  • Electricity sub-station301 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenWalls combination of ceramic tiles up to 2’ above the counter and OBD in balance area. counter granite/ marble without woodwork fittings and fixtures chrome plated (CP) faucets and fittings, stainless steel single bowl sink with single drain board. without appliances
  • FloorsMarble / vitrified tiles / ceramic tiles /KOTA /concrete
  • WallsOil bound distemper (OBD) on walls and ceiling
  • BathroomsChrome plated (CP) fittings, english type WC. WASH basin & EWC shall be in white shade
  • WindowsGlazing on external door / windows- as per design
  • Main doorFlush shutter in TEAK finish/ paint or FLAT SKIN flush doors in enamel paint or MICA laminated
  • Electrical fittingsModular switches and sockets, copper wiring without any appliances
  • Water storageUnder ground RCC common water tank and PVC OH tank for individual units

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: VILLAGE SIMLA MAULANA, SECTOR 40

The builder

Its 4 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 3
  • Other register states: 1

Questions buyers ask

Is ELDECO PARADISO registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as HRERA-PKL-PNP-299-2022. The register’s record shows an end date of 16 Jan 2025. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for ELDECO PARADISO?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 16 Jan 2025. Its registration runs to 16 Jan 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ELDECO PARADISO?From the records · HARERA, read 4 Nov 2026

ELDECO PARADISO is in Panipat; the site address declared to HARERA is Village Simla Maulana, Sector 40. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ELDECO PARADISO?From the records · HARERA, read 4 Nov 2026

ELDECO PARADISO is a Eldeco Green Park Infrastructure project, registered by its company ELDECO GREEN PARK INFRASTRUCTURE LIMITED.

The source ↗Eldeco Green Park Infrastructure's projects and court record

The records

What the registers hold for ELDECO PARADISO: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration HRERA-PKL-PNP-299-2022: Registration lapsed. The register’s record shows an end date of 16 Jan 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 3 OF 2020 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 16 Jan 2025.DTCP, read 3 Nov 2026
The court record of Eldeco Green Park Infrastructure’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 16 Jan 2025. HARERA Panchkula, read 4 Nov 2026. Source

  • Amber flag: Licence 3 OF 2020 validity ended

    Named in this project’s application. Valid to 16 Jan 2025. The register links a completion certificate (LC-IX), dated 23 Jul 2024, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Licence 4 OF 2020 validity ended

    Named in this project’s application. Valid to 16 Jan 2025. The register links a completion certificate (LC-IX), dated 13 Jan 2025, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Licence 5 OF 2020 validity ended

    Named in this project’s application. Valid to 16 Jan 2025. The register links a completion certificate (LC-IX), dated 23 Jul 2024, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 18 HARERA files, with the dates we read them
Registration no.
HRERA-PKL-PNP-299-2022
Registration valid till
16 Jan 2025
Declared possession
16 Jan 2025

Declared by the promoter to HARERA

Land area
143031.08168 (Sqr/mtrs)
FAR
the application prints 124.4, which is not a ratio
licence
03 of 2020(16.01.2025), 04 of 2020(16.01.2025) and 05 of 2020(16.01.2025)
Estimated project cost
₹187.82 crore
Cost of land
₹60.92 crore
Construction to start
15 Jan 2022
Completion declared for
16 Jan 2025
Statutory approvals, as declared · 30

Statutory approvals, as declared

  • I. LICENSE - 03_10.71875 ACRES — declared: already been obtained (17 Jan 2020)
  • II. LICENSE - 04_13.65625 ACRES — declared: already been obtained (17 Jan 2020)
  • III. LICENSE - 05_10.96875 ACRES — declared: already been obtained (17 Jan 2020)
  • IV. LATEST REVISED LAYOUT PLAN CUM DEMARCATION - LICENSE - 03_10.71875 ACRES — declared: already been obtained (12 Mar 2021)
  • V. LATEST REVISED LAYOUT PLAN CUM DEMARCATION - LICENSE - 04_13.65625 ACRES — declared: already been obtained (12 Mar 2021)
  • VI. LATEST REVISED LAYOUT PLAN CUM DEMARCATION - LICENSE - 05_10.96875 ACRES — declared: already been obtained (8 Mar 2021)
  • VII. ZONING PLAN - LICENSE - 03_10.71875 ACRES — declared: already been obtained (21 Sept 2021)
  • VIII. ZONING PLAN - LICENSE - 04_13.65625 ACRES — declared: already been obtained (21 Sept 2021)
  • IX. ZONING PLAN - LICENSE - 05_10.96875 ACRES — declared: already been obtained (21 Sept 2021)
  • X. BUILDING PLAN - OF PLOT 1056 — declared: already been obtained (23 Dec 2021)
  • XI. BUILDING PLAN - OF PLOT 1057 — declared: already been obtained (23 Dec 2021)
  • XII. BUILDING PLAN - OF PLOT 1058 — declared: already been obtained (23 Dec 2021)
  • XIII. BUILDING PLAN - OF PLOT 1059 — declared: already been obtained (16 Sept 2021)
  • XIV. ELEVATION SECTION - OF PLOT 1056 — declared: already been obtained (23 Dec 2021)
  • XV. ELEVATION SECTION - OF PLOT 1057 — declared: already been obtained (23 Dec 2021)
  • XVI. ELEVATION SECTION - OF PLOT 1058 — declared: already been obtained (23 Dec 2021)
  • XVII. ELEVATION SECTION - OF PLOT 1059 — declared: already been obtained (16 Sept 2021)
  • XVIII. ROADS PLAN - LICENSE - 03_10.71875 ACRES — declared: already been obtained (22 Oct 2021)
  • XIX. ROADS PLAN - LICENSE - 04_13.65625 ACRES — declared: already been obtained (22 Oct 2021)
  • XX. ROADS PLAN - LICENSE - 05_10.96875 ACRES — declared: already been obtained (22 Oct 2021)
  • XXI. SEWERAGE - LICENSE - 03_10.71875 ACRES — declared: already been obtained (22 Oct 2021)
  • XXII. SEWERAGE - LICENSE - 04_13.65625 ACRES — declared: already been obtained (22 Oct 2021)
  • XXIII. SEWERAGE - LICENSE - 05_10.96875 ACRES — declared: already been obtained (22 Oct 2021)
  • XXIV. STORM WATER DRAINAGE- LICENSE - 03_10.71875 ACRES — declared: already been obtained (22 Oct 2021)
  • XXV. STORM WATER DRAINAGE- LICENSE - 04_13.65625 ACRES — declared: already been obtained (22 Oct 2021)
  • XXVI. STORM WATER DRAINAGE- LICENSE - 05_10.96875 ACRES — declared: already been obtained (22 Oct 2021)
  • XXVII. WATER SUPPLY - LICENSE - 03_10.71875 ACRES — declared: already been obtained (22 Oct 2021)
  • XXVIII. WATER SUPPLY - LICENSE - 04_13.65625 ACRES — declared: already been obtained (22 Oct 2021)
  • XXIX. WATER SUPPLY - LICENSE - 05_10.96875 ACRES — declared: already been obtained (22 Oct 2021)
  • XXX. ELECTRIFICATION PLAN_LICENSE - 03_10.71875 ACRES, 04_13.65625 ACRES AND 05_10.96875 ACRES — declared: already been obtained (7 Dec 2021)
On file with HARERA · 18 files

On file with HARERA (18)

Plans

Site plan

1 file
Approved Site Plan10 Jan 2022

Layout plan

1 file
Latest Layout Plan7 Jan 2022

Zoning plan

1 file
Zoning Plan13 Jan 2022

Demarcation plan

1 file
Demarcation Plan7 Jan 2022

Building plans

1 file
Approved Building Plans, Full Set6 Jan 2022

Services

Service plans

1 file
Service Plans on the Layout14 Jan 2022

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule6 Jan 2022

Land records

Land records

2 files
Revenue Record Entry of Licence and Collaboration6 Jan 2022Legal Title Deeds of Promoter6 Jan 2022

Money

Accounts and finance

3 files
Cash Flow Statement13 Jan 2022CA Certificate on the Application’s Figures13 Jan 2022Non-Default Certificate from a CA27 Dec 2021

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit14 Jan 2022

HARERA’s orders

HARERA’s orders

3 files
Addendum for registration of villas15 Mar 2023Addendum of the registration11 Jan 2023Addendum issued25 Aug 2022

Other filings

Other filings

2 files
Issued Supplementary registration of the project25 Aug 2022Supplementary Registration3 Jun 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 3 DTCP licences named on the application

3 OF 2020 · Eldeco Green Park Infrastructure Ltd. · Panipat

Licence valid to 16 Jan 2025

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

4 OF 2020 · Eldeco Green Park Infrastructure Ltd. · Panipat

Licence valid to 16 Jan 2025

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

5 OF 2020 · Eldeco Green Park Infrastructure Ltd. · Panipat

Licence valid to 16 Jan 2025

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Panchkula bench · submitted 14 Jan 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/1 · fetched 4 Nov 2026

Land under the 3 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

3 OF 2020: 21 parcels, 10.7188 acres in all, in Simla mulana (hadbast 2), tehsil Panipat.

The licence register prints the same licensed area, 10.7188 acres.

  • rectangle 447, kila 4473 bigha
  • rectangle 448, kila 4483 bigha
  • rectangle 458, kila 4583 bigha
  • rectangle 459, kila 4593 bigha
Show the other 17 parcels
  • rectangle 467, kila 467/117 biswa
  • rectangle 463, kila 4633 bigha
  • rectangle 464, kila 4643 bigha
  • rectangle 465, kila 4653 bigha
  • rectangle 466, kila 466/17 biswa
  • rectangle 471, kila 471/212 biswa
  • rectangle 472, kila 4723 bigha
  • rectangle 460, kila 4603 bigha
  • rectangle 449, kila 4493 bigha
  • rectangle 450, kila 45015 biswa
  • rectangle 451, kila 4513 bigha 3 biswa
  • rectangle 452, kila 4521 bigha 10 biswa
  • rectangle 455, kila 4552 bigha 2 biswa
  • rectangle 456, kila 4563 bigha 3 biswa
  • rectangle 457, kila 4573 bigha
  • rectangle 453, kila 4533 bigha
  • rectangle 454, kila 4543 bigha

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 23 Oct 2026. verify at source

4 OF 2020: 33 parcels, 13.6563 acres in all, in Simla mulana (hadbast 2), tehsil Panipat.

The licence register prints the same licensed area, 13.6563 acres.

  • rectangle 445, kila 4453 bigha
  • rectangle 446, kila 4463 bigha
  • rectangle 382, kila 3821 bigha 19 biswa
  • rectangle 386, kila 3863 bigha
Show the other 29 parcels
  • rectangle 402, kila 402/11 bigha 10 biswa
  • rectangle 402, kila 402/21 bigha 10 biswa
  • rectangle 403, kila 403/11 bigha 10 biswa
  • rectangle 404, kila 404/22 bigha
  • rectangle 405, kila 405/11 bigha 1 biswa
  • rectangle 405, kila 405/21 bigha 19 biswa
  • rectangle 406, kila 406/1/118 biswa
  • rectangle 407, kila 407/1/118 biswa
  • rectangle 408, kila 408/1/111 biswa
  • rectangle 409, kila 4093 bigha
  • rectangle 410, kila 4101 bigha 16 biswa
  • rectangle 358, kila 358/2/115 biswa
  • rectangle 358, kila 358/19 biswa
  • rectangle 358, kila 358/2/211 biswa
  • rectangle 358, kila 358/31 bigha 5 biswa
  • rectangle 359, kila 35918 biswa
  • rectangle 399, kila 3993 bigha
  • rectangle 379, kila 3793 bigha
  • rectangle 380, kila 3806 biswa
  • rectangle 381, kila 38115 biswa
  • rectangle 383, kila 3833 bigha
  • rectangle 387, kila 3873 bigha
  • rectangle 391, kila 3913 bigha
  • rectangle 392, kila 3923 bigha
  • rectangle 393, kila 3933 bigha
  • rectangle 394, kila 3943 bigha
  • rectangle 395, kila 3953 bigha
  • rectangle 396, kila 3963 bigha
  • rectangle 398, kila 3983 bigha

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 23 Oct 2026. verify at source

5 OF 2020: 20 parcels, 10.9688 acres in all, in Simla mulana (hadbast 2), tehsil Panipat.

The licence register prints the same licensed area, 10.9688 acres.

  • rectangle 432, kila 432/21 bigha 16 biswa
  • rectangle 397, kila 3973 bigha
  • rectangle 400, kila 4003 bigha
  • rectangle 425, kila 425/11 bigha 1 biswa
Show the other 16 parcels
  • rectangle 427, kila 4273 bigha
  • rectangle 428, kila 4283 bigha
  • rectangle 429, kila 4293 bigha
  • rectangle 441, kila 4413 bigha
  • rectangle 442, kila 4423 bigha
  • rectangle 443, kila 4433 bigha
  • rectangle 430, kila 4301 bigha
  • rectangle 444, kila 4443 bigha
  • rectangle 432, kila 432/12 bigha 14 biswa
  • rectangle 434, kila 4341 bigha 17 biswa
  • rectangle 436, kila 4363 bigha
  • rectangle 437, kila 4372 bigha 5 biswa
  • rectangle 438, kila 4383 bigha
  • rectangle 439, kila 4393 bigha
  • rectangle 440, kila 4403 bigha
  • rectangle 435, kila 4353 bigha

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 23 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Panipat, then the tehsil and the village: Simla mulana (hadbast 2), tehsil Panipat. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as rectangle 447, kila 447.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan10 Jan 2022

Layout plan

1 file
Latest Layout Plan7 Jan 2022

Building plans

1 file
Approved Building Plans, Full Set6 Jan 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (18 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1810 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Eldeco Green Park Infrastructure

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Panchkula records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.