Skip to content

ESPIRE TOWERS (TOWER-A)

by Espire Infrastructure Corporation · Faridabad

Not on our price list yet

About this project

Key facts

Location
Faridabad
Carpet area
1,446 sq ft
In m²about 134–134 m², as declared
Registered by
ESPIRE INFRASTRUCTURE CORPORATION LTDthe company that filed it, for Espire Infrastructure Corporation
Timeline
  1. 7 Aug 2015Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Sep 2023Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

56homes, 1,446 to 1,446 sq ft of carpet area
  • 1,000–1,500 sq ft1,446 sq ft56

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside8,510 m² in all, by use
  • Apartment buildings8,427 m² · 99%
  • Other usesas the form names them: Convenient shops83 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningDaiking AIR conditioners with moduler switches of north EAST or equivalant.
  • KitchenFloor: italian / imported marble. walls: imported marble upto 2FT above granite. WORK counter: corian worktops. windows: power coated aluminium windows. gas: provision of pipe gas supply. ceiling: designer POP false celieng in limited portion.
  • LiftsProvided as per approved by DTCP.
  • FloorsLiving/dining: italian / imported marble, internal lobby: italian / imported marble, master bed room: pergo laminated wooden flooring. toilets: anti skid ceramic tiles. balconies: anti skid ceramic tiles. study room: pergo laminated wooden flooring. kitchen: italian / imported marble, utility room: anti skid ceramic tiles.
  • WallsLiving room: one drawing room wall with decorative wallpaper REST walls with plastic emulsion paint. internal lobby: plastic emulsion paint. master bedroom: one wall with wooden penal for LCD TV, REST walls with plastic emulsion paint. toilets: designer tiles upto ceiling. study room: plastic emulsion paint. kitchen: imported marble tiles upto 2 FEET above granite counter top. utility room: OBD.
  • BathroomsKohlar/ ROCA or equaivalant sanitary fittings and CP fittings.
  • WindowsProvided as per requirement.
  • Main doorSolid wood door with melamine polish in master bedroom.

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: PALLA- TILPAT ROAD, SECTOR- 37, FARIDABAD

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Other register states: 1

Questions buyers ask

Is ESPIRE TOWERS (TOWER-A) registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as HRERA-PKL-FBD-109-2019. Ended 30 Sep 2023. The register shows it as: Registration expired.

The source ↗
How is the connectivity around ESPIRE TOWERS (TOWER-A)?From the records · HARERA, read 4 Nov 2026

ESPIRE TOWERS (TOWER-A) is in Faridabad; the site address declared to HARERA is Palla- Tilpat Road, Sector- 37, Faridabad. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ESPIRE TOWERS (TOWER-A)?From the records · HARERA, read 4 Nov 2026

ESPIRE TOWERS (TOWER-A) is a Espire Infrastructure Corporation project, registered by its company ESPIRE INFRASTRUCTURE CORPORATION LTD.

The source ↗Espire Infrastructure Corporation's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for ESPIRE TOWERS (TOWER-A): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration HRERA-PKL-FBD-109-2019: Registration expired. Ended 30 Sep 2023.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 205 OF 2007 is on the DTCP register: Licence lapsed; the register prints its validity to 2 Aug 2024.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 7 Aug 2015, building plans 7 Aug 2015.Declared to HARERA, read 29 Oct 2026
The court record of Espire Infrastructure Corporation’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 30 Sep 2023. HARERA Panchkula, read 4 Nov 2026. Source

  • Red flag: Licence 205 OF 2007 lapsed

    Named in this project’s application. Valid to 2 Aug 2024; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 9 HARERA files, with the dates we read them
Registration no.
HRERA-PKL-FBD-109-2019
Registration valid till
30 Sept 2023

Declared by the promoter to HARERA

Land area
8509.69 (Sqr/mtrs)
FAR
0.45 proposed of 1.75 permissible
licence
License No. 205 of 2007 dated 03.08.2007. License Valid upto 02.08.2019.
Estimated project cost
₹30.08 crore
Cost of land
₹14.37 crore
Layout plan, declared approved (field 5a)
7 Aug 2015
Building plans, declared approved
7 Aug 2015
Declared inventory · 1 type

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-A · 56 units · 134.296 sq m carpet · one flat
Statutory approvals, as declared · 5

Statutory approvals, as declared

  • I. LICENSE NO. 205 OF 2007 — declared: already been obtained (14 Aug 2007)
  • II. RENEWAL OF LICENSE NO. 205 OF 2007 — declared: already been obtained (14 Nov 2018)
  • III. OCCUPATION CERTIFICATE FOR TOWER-C, D AND EWS. — declared: already been obtained (28 Oct 2015)
  • IV. APPROVAL OF BUILDING PLANS — declared: already been obtained (7 Aug 2015)
  • V. OCCUPATION CERTIFICATE FOR TOWER-B. — declared: applied for but yet to receive (14 Jul 2017)
On file with HARERA · 9 files

On file with HARERA (9)

Plans

Site plan

1 file
Approved Site Plan9 Mar 2019

Layout plan

1 file
Latest Layout Plan9 Mar 2019

Zoning plan

1 file
Zoning Plan9 Mar 2019

Approvals and clearances

Occupation certificate (OC)

1 file
Occupation Certificate Uploaded12 Mar 2024

DTCP licence

1 file
Licence Copy with Land Schedule9 Mar 2019

Money

Accounts and finance

2 files
Non-Default Certificate from a CA11 Mar 2019CA Certificate on the Application’s Figures9 Mar 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit11 Mar 2019

HARERA’s orders

HARERA’s orders

1 file
Extension/rc Upload12 Mar 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

205 OF 2007 · Usha Spinning & weaving mills · Faridabad

Licence valid to 2 Aug 2024

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Panchkula bench · submitted 12 Mar 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/1 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

205 OF 2007: 5 parcels, 4.7938 acres in all, in Palla (hadbast 128), tehsil Faridabad.

The licence register prints the same licensed area, 4.79 acres.

  • 15//14/2/26 kanal 7 marla
  • 15//48 kanal
  • 15//78 kanal
  • 8//178 kanal
Show the other 1 parcel
  • 8//248 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Faridabad, then the tehsil and the village: Palla (hadbast 128), tehsil Faridabad. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 15//14/2/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan9 Mar 2019

Layout plan

1 file
Latest Layout Plan9 Mar 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (9 in all), none is a building plan, a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/457 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Espire Infrastructure Corporation

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Panchkula records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.