Skip to content

GARDEN RESIDENCY

by Ekaakshara Builders · Gurugram

Not on our price list yet

Possession 30 Jun 2029 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Carpet area
about 869 sq ft
In m²about 80.7 m², the average flat, as declared
Registered by
EKAAKSHARA BUILDERS LLPthe company that filed it, for Ekaakshara Builders
Timeline
  1. 14 Jul 2025Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 25 Sep 2025Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 30 Jun 2029Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside1.247 acres in all, by use
  • Plots for sale1.247 acres · 100%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenAsian or equivalent
  • WardrobesCeiling paint asian or equivalent
  • FloorsTile / sunheart or equivalent
  • WallsPaint / asian or equivalent
  • BathroomsFloors tile sunheart or equivalent
  • WindowsWindow shutter UPVC VEKA or equivalent
  • Main doorEntrance door flush door shutter masonite or equivalent

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: REVENUE ESTATE OF VILLAGE SOHNA, SECTOR 5 SOHNA

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 3

Questions buyers ask

Is GARDEN RESIDENCY registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/1009/741/2025/112. Valid to 30 Jun 2029.

The source ↗
What is the possession timeline for GARDEN RESIDENCY?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Jun 2029. Its registration runs to 30 Jun 2029; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around GARDEN RESIDENCY?From the records · HARERA, read 4 Nov 2026

GARDEN RESIDENCY is in Gurugram; the site address declared to HARERA is Revenue Estate Of Village Sohna, Sector 5 Sohna. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building GARDEN RESIDENCY?From the records · HARERA, read 4 Nov 2026

GARDEN RESIDENCY is a Ekaakshara Builders project, registered by its company EKAAKSHARA BUILDERS LLP.

The source ↗Ekaakshara Builders's projects and court record

The records

What the registers hold for GARDEN RESIDENCY: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/1009/741/2025/112: Registered. Valid to 30 Jun 2029.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 118 OF 2025 is on the DTCP register, valid to 13 Jul 2030.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 14 Jul 2025, building plans 25 Sep 2025.Declared to HARERA, read 29 Oct 2026
The court record of Ekaakshara Builders’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 61 HARERA files, with the dates we read them
Registration no.
GGM/1009/741/2025/112
Registration valid till
30 Jun 2029
Declared possession
30 Jun 2029

Declared by the promoter to HARERA

Land area
1.247 (Acre) (5,046.43 sq m)
FAR
2.64 proposed of 2.64 permissible
licence
The Department of Town and Country Planning (DTCP) has granted Licence No. 118 of 2025, dated 14.07.2025, to the Promoter, M/s Ekaakshara Builders LLP, for the development of an Affordable Plotted Colony under the Deen Dayal Jan Awas Yojana, 2016. The project pertains to land measuring 11.0875 acres, situated in the revenue estate of Village Sohna, Sector 5 Sohna, Tehsil Sohna, District Gurugram, Haryana. The said licence is valid up to 13. 07.2030.
Estimated project cost
₹79.25 crore
Cost of land
₹12.26 crore
Layout plan, declared approved (field 5a)
14 Jul 2025
Building plans, declared approved
25 Sept 2025
Construction to start
31 Oct 2025
Completion declared for
30 Jun 2029
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 132 units · 10,655.44 sq m carpet · 33 towers · total for 132 flats, about 80.7 m² each
Statutory approvals, as declared · 12

Statutory approvals, as declared

  • I. LICENCE NO. 118 OF 2025 — declared: already been obtained (14 Jul 2025)
  • II. ELECTRIFICATION PLAN APPROVAL — declared: already been obtained (27 Aug 2025)
  • III. FOREST CLEARANCE — declared: already been obtained (1 Jul 2025)
  • IV. ARAVALI CLEARANCE — declared: already been obtained (26 Aug 2025)
  • V. CONSENT TO ESTABLISH — declared: already been obtained (11 Sept 2025)
  • VI. DEMARCATION CUM ZONING PLAN — declared: already been obtained (11 Aug 2025)
  • VII. SERVICE PLAN ESTIMATES APPROVAL — declared: already been obtained (20 Aug 2025)
  • VIII. STORM WATER ASSURANCE — declared: already been obtained (22 Jul 2025)
  • IX. SEWERAGE CONNECTION ASSURANCE — declared: already been obtained (22 Jul 2025)
  • X. WATER SUPPLY ASSURANCE — declared: already been obtained (22 Jul 2025)
  • XI. TREATED WATER NOC — declared: already been obtained (6 Aug 2025)
  • XII. LAYOUT PLAN — declared: already been obtained (14 Jul 2025)
On file with HARERA · 61 files

On file with HARERA (61)

Plans

Site plan

2 files
Approved Site Plan12 Nov 2025Demarcation Superimposed on Layout11 Nov 2025

Layout plan

9 files
Type J Layout Plans -138 -14418 Nov 2025Type D Layout Plans-68-7218 Nov 2025Type D Layout Plans-63-6718 Nov 2025

Zoning plan

2 files
Zoning Letter DTCP11 Nov 2025Zoning Plan8 Oct 2025

Demarcation plan

1 file
Demarcation Plan8 Oct 2025

Building plans

1 file
Brs III12 Nov 2025

Floor plans

1 file
Email Tcp Statement of Floors12 Nov 2025

Services

Sewerage and drainage

3 files
Assurance- Storm Water11 Nov 2025Assurance- Sewerage Connection11 Nov 2025STP Letter- Approval of Demarcation Plan11 Nov 2025

Water supply

1 file
Assurance- Water Supply11 Nov 2025

Electricity

1 file
Electrification Plan Approval11 Nov 2025

Service plans

2 files
Service Plan Estimates11 Nov 2025Service Plans on the Layout8 Oct 2025

Approvals and clearances

DTCP licence

3 files
LC IV B11 Nov 2025LOI11 Nov 2025Licence Copy with Land Schedule8 Oct 2025

Other NOCs and clearances

3 files
Aravali11 Nov 2025Forest NOC11 Nov 2025Treated Water NOC11 Nov 2025

Land records

Land records

7 files
Mutation12 Nov 2025Non Encumbrance11 Nov 2025Jamabandi11 Nov 2025

Sales papers

Allotment and sale agreements

3 files
Draft Allotment Letter11 Nov 2025Draft Conveyance Deed11 Nov 2025Draft Agreement for Sale11 Nov 2025

Money

Accounts and finance

10 files
Net Worth Sanjeet Singh11 Nov 2025Net Worth Surender Dagar11 Nov 2025BR Bank Account Operation11 Nov 2025

The promoter’s papers

Declarations and affidavits

6 files
The Promoter’s Declaration on Affidavit12 Nov 2025Affidavit Non Applicability of Various Permissions11 Nov 2025Affidavit Under Section 4 2 L D11 Nov 2025

Company papers

2 files
LLP Agreement12 Nov 2025ROC Form11 Nov 2025

HARERA’s orders

HARERA’s orders

1 file
Collaboration Agreement and Its Addendum12 Nov 2025

Other filings

Other filings

3 files
Brs II12 Nov 2025Brs I12 Nov 2025Individual Acceptance-Landowners11 Nov 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

118 OF 2025 · M/s. Ekaakshara Builders LLP · SOHNA

Licence valid to 13 Jul 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 9 Oct 2025 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

118 OF 2025: 19 parcels, 11.0875 acres in all, in Sohna (hadbast 187), tehsil Sohna.

The licence register prints the same licensed area, 11.0875 acres.

  • 142//24/2/21 kanal
  • 177//48 marla
  • 177//5/14 kanal
  • 177//6/16 kanal
Show the other 15 parcels
  • rectangle 177, kila 6/22 kanal
  • 178//10/14 kanal
  • 178//10/24 kanal
  • 178//11/26 kanal 8 marla
  • 178//12/15 kanal 12 marla
  • 178//12/22 kanal 8 marla
  • 178//138 kanal
  • 178//186 kanal 9 marla
  • 178//196 kanal 9 marla
  • 178//268 marla
  • 178//38 kanal
  • 178//48 kanal
  • 178//88 kanal
  • 178//97 kanal
  • 178//912 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Sohna (hadbast 187), tehsil Sohna. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 142//24/2/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Approved Site Plan12 Nov 2025Demarcation Superimposed on Layout11 Nov 2025

Layout plan

9 files
Type J Layout Plans -138 -14418 Nov 2025Type D Layout Plans-68-7218 Nov 2025Type D Layout Plans-63-6718 Nov 2025Type J Layout Plans-117-12318 Nov 2025Type E Layout Plans12 Nov 2025Type B Layout Plans12 Nov 2025

Building plans

1 file
Brs III12 Nov 2025

Floor plans

1 file
Email Tcp Statement of Floors12 Nov 2025

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (61 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3754 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Ekaakshara Builders

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.