Skip to content

GARDEN RESIDENCY II

by Ekaakshara Builders · Gurugram

Not on our price list yet

Possession 30 Jun 2029 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Carpet area
898–1,028 sq ft
In m²about 83–96 m², as declared
Registered by
EKAAKSHARA BUILDERS LLPthe company that filed it, for Ekaakshara Builders
Timeline
  1. 14 Jul 2025Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 25 Sep 2025Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 30 Jun 2029Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

108homes, 898 to 1,028 sq ft of carpet area
  • Under 1,000 sq ft898 sq ft16
  • 1,000–1,500 sq ft1,006–1,028 sq ft92

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • Air-conditioningInverter type panasonic/LG
  • KitchenAsian or equivalent
  • Lifts01 lift per project (schindler/KONE)
  • WardrobesWalls paint asian or equivalent
  • FloorsTile / sunheart or equivalent
  • WallsPaint / asian or equivalent
  • BathroomsFloors tile sunheart or equivalent
  • WindowsWindow shutter UPVC VEKA or equivalent

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: REVENUE ESTATE OF VILLAGE SOHNA, SECTOR 5 SOHNA

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 3

Questions buyers ask

Is GARDEN RESIDENCY II registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/1021/753/2025/124. Valid to 30 Jun 2029.

The source ↗
What is the possession timeline for GARDEN RESIDENCY II?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Jun 2029. Its registration runs to 30 Jun 2029; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around GARDEN RESIDENCY II?From the records · HARERA, read 4 Nov 2026

GARDEN RESIDENCY II is in Gurugram; the site address declared to HARERA is Revenue Estate Of Village Sohna, Sector 5 Sohna. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building GARDEN RESIDENCY II?From the records · HARERA, read 4 Nov 2026

GARDEN RESIDENCY II is a Ekaakshara Builders project, registered by its company EKAAKSHARA BUILDERS LLP.

The source ↗Ekaakshara Builders's projects and court record

The records

What the registers hold for GARDEN RESIDENCY II: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/1021/753/2025/124: Registered. Valid to 30 Jun 2029.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 118 OF 2025 is on the DTCP register, valid to 13 Jul 2030.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 14 Jul 2025, building plans 25 Sep 2025.Declared to HARERA, read 29 Oct 2026
The court record of Ekaakshara Builders’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 85 HARERA files, with the dates we read them
Registration no.
GGM/1021/753/2025/124
Registration valid till
30 Jun 2029
Declared possession
30 Jun 2029

Declared by the promoter to HARERA

Land area
11.0875 (Acre) (44,869.52 sq m)
FAR
2.64 proposed of 2.64 permissible
licence
Licence No. 118 of 2025 dated 14.07.2025 granted by Director, Town and Country Planning, Haryana for setting up Affordable Plotted Colony under Deen Dayal Jan Awas Yojana, 2016 for land admeasuring 11.0875 acres situated in the revenue estate Sohna, Sector 5 Sohna, District Gurugram, Haryana.
Estimated project cost
₹73.37 crore
Cost of land
₹11.40 crore
Layout plan, declared approved (field 5a)
14 Jul 2025
Building plans, declared approved
25 Sept 2025
Construction to start
1 Nov 2025
Completion declared for
30 Jun 2029
Declared inventory · 5 types

Declared inventory

  • Apartment/Shops/Other Buildings · 12 units · 95.24 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 8 units · 93.86 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 56 units · 93.5 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 16 units · 83.42 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 16 units · 95.48 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 12

Statutory approvals, as declared

  • I. LICENCE NO. 118 OF 2025 — declared: already been obtained (14 Jul 2025)
  • II. ELECTRIFICATION PLAN APPROVAL — declared: already been obtained (27 Aug 2025)
  • III. FOREST CLEARANCE — declared: already been obtained (1 Jul 2025)
  • IV. ARAVALI CLEARANCE — declared: already been obtained (26 Aug 2025)
  • V. CONSENT TO ESTABLISH — declared: already been obtained (11 Sept 2025)
  • VI. DEMARCATION CUM ZONING PLAN — declared: already been obtained (11 Aug 2025)
  • VII. SERVICE PLAN ESTIMATES APPROVAL — declared: already been obtained (20 Aug 2025)
  • VIII. STORM WATER ASSURANCE — declared: already been obtained (22 Jul 2025)
  • IX. SEWERAGE CONNECTION ASSURANCE — declared: already been obtained (22 Jul 2025)
  • X. WATER SUPPLY ASSURANCE — declared: already been obtained (22 Jul 2025)
  • XI. TREATED WATER NOC — declared: already been obtained (6 Aug 2025)
  • XII. LAYOUT PLAN — declared: already been obtained (14 Jul 2025)
On file with HARERA · 85 files

On file with HARERA (85)

Plans

Site plan

2 files
Approved Site Plan15 Dec 2025Demarcation Superimposed on Layout15 Dec 2025

Layout plan

3 files
Layout with Plot Marking Garden II15 Dec 2025Latest Layout Plan15 Dec 2025Landowners Acceptance of Share--- Layout15 Dec 2025

Zoning plan

2 files
Zoning Letter DTCP15 Dec 2025Zoning Plan15 Dec 2025

Demarcation plan

1 file
Demarcation Plan15 Dec 2025

Building plans

12 files
Plot 25,26,27 Brs III15 Dec 2025Plot 19,20,21 Brs III15 Dec 2025Plot 97,98,99 Brs III15 Dec 2025

Floor plans

4 files
Plot 97,98,99,100 Floor Plan15 Dec 2025Plot 24,25,26,27,28,29,30,31 Floor Plan15 Dec 2025Plot 01,02,03,16,17,18,19,20,21,22,23 Floor Plan15 Dec 2025Plot 101,102,103,104 Floor Plan15 Dec 2025

Services

Sewerage and drainage

3 files
STP Letter- Approval of Demarcation Plan15 Dec 2025Assurance- Storm Water15 Dec 2025Assurance- Sewerage Connection15 Dec 2025

Water supply

1 file
Assurance- Water Supply15 Dec 2025

Electricity

1 file
Electrification Plan Approval15 Dec 2025

Service plans

2 files
Service Plan Estimates15 Dec 2025Service Plans on the Layout11 Nov 2025

Approvals and clearances

DTCP licence

3 files
LOI Dated 2705202515 Dec 2025LC IV B15 Dec 2025Licence Copy with Land Schedule11 Nov 2025

Other NOCs and clearances

4 files
Forest Clearance15 Dec 2025Treated Water NOC15 Dec 2025Forest NOC15 Dec 2025Aravali15 Dec 2025

Land records

Land records

13 files
Mutation15 Dec 2025GPA 115 Dec 2025Collaboration Agreement-115 Dec 2025

Sales papers

Allotment and sale agreements

3 files
Conveyance Deed15 Dec 2025Agreement for Sale15 Dec 2025Allotment Letter15 Dec 2025

Brochure and specifications

2 files
Brochure Garden II15 Dec 2025Advertisement Garden II15 Dec 2025

Money

Accounts and finance

11 files
Copy of Fees- Paid During Registration15 Dec 2025Board Resolution Bank Account Operation Garden II15 Dec 2025Deficit Fees--- Garden II15 Dec 2025

Timeline and progress

Construction schedule

1 file
Revised PERT Chart15 Dec 2025

The promoter’s papers

Declarations and affidavits

6 files
Undertaking EDC-- Garden II15 Dec 2025Bank Undertaking Garden II15 Dec 2025Affidavit 4 2 L D Garden II15 Dec 2025

Company papers

4 files
LLP Agreement15 Dec 2025BR-- Authorized Signatory Garden II15 Dec 2025Coi15 Dec 2025GST15 Dec 2025

Other filings

Other filings

7 files
Brs I-- 27 Plots15 Dec 2025Email Garden Residency II15 Dec 2025Authority Lettter Legal Garden II15 Dec 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

118 OF 2025 · M/s. Ekaakshara Builders LLP · SOHNA

Licence valid to 13 Jul 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 11 Nov 2025 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

118 OF 2025: 19 parcels, 11.0875 acres in all, in Sohna (hadbast 187), tehsil Sohna.

The licence register prints the same licensed area, 11.0875 acres.

  • 142//24/2/21 kanal
  • 177//48 marla
  • 177//5/14 kanal
  • 177//6/16 kanal
Show the other 15 parcels
  • rectangle 177, kila 6/22 kanal
  • 178//10/14 kanal
  • 178//10/24 kanal
  • 178//11/26 kanal 8 marla
  • 178//12/15 kanal 12 marla
  • 178//12/22 kanal 8 marla
  • 178//138 kanal
  • 178//186 kanal 9 marla
  • 178//196 kanal 9 marla
  • 178//268 marla
  • 178//38 kanal
  • 178//48 kanal
  • 178//88 kanal
  • 178//97 kanal
  • 178//912 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Sohna (hadbast 187), tehsil Sohna. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 142//24/2/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Approved Site Plan15 Dec 2025Demarcation Superimposed on Layout15 Dec 2025

Layout plan

3 files
Layout with Plot Marking Garden II15 Dec 2025Latest Layout Plan15 Dec 2025Landowners Acceptance of Share--- Layout15 Dec 2025

Building plans

12 files
Plot 25,26,27 Brs III15 Dec 2025Plot 19,20,21 Brs III15 Dec 2025Plot 97,98,99 Brs III15 Dec 2025Plot 100-104 Brs III15 Dec 2025Plot 22,23,24 Brs III15 Dec 2025Type A --- Building Plans15 Dec 2025

Floor plans

4 files
Plot 97,98,99,100 Floor Plan15 Dec 2025Plot 24,25,26,27,28,29,30,31 Floor Plan15 Dec 2025Plot 01,02,03,16,17,18,19,20,21,22,23 Floor Plan15 Dec 2025Plot 101,102,103,104 Floor Plan15 Dec 2025

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (85 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3794 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Ekaakshara Builders

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.