Skip to content

GLS AUREVA

by Aar Housing · Gurugram

Not on our price list yet

Possession 31 Dec 2032 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Carpet area
1,260–1,398 sq ft
In m²about 117–130 m², as declared
Registered by
AAR HOUSING PVT LTDthe company that filed it, for Aar Housing
Timeline
  1. 6 Aug 2025Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Dec 2032Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 31 Mar 2033Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

102homes, 1,260 to 1,398 sq ft of carpet area
  • 1,000–1,500 sq ft1,260–1,398 sq ft102

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 62 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside15,823 m² in all, by use
  • Parks and playgrounds5,686 m² · 36%
  • Roads4,672 m² · 30%
  • Other usesas the form names them: Staircase, Guard, EWS (homes for economically weaker sections), Pool3,390 m² · 21%
  • Apartment buildings1,070 m² · 7%
  • Green belts549 m² · 3%
  • Parking360 m² · 2%
  • Shops and offices96 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenVitrified tiles or equivalent
  • LiftsOTIS/thyssun/schindler or equivalent
  • FloorsVitrified tiles or equivalent
  • WallsAcrylic emulsion paint / OBD or equivalent
  • BathroomsAs per indian standard/ kolher/ jaguar or equivalent
  • WindowsAluminum frames / UPVC with toughened glass or equivalent
  • Main doorFlush panel door
  • Electrical fittingsISI marked

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: REVENUE ESTATE OF VILLAGE KHAIKA, SECTOR 4, SOHNA, DISTRICT GURUGRAM, HARYANA

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1
  • Other register states: 1

Questions buyers ask

Is GLS AUREVA registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/995/727/2025/98. Valid to 31 Mar 2033.

The source ↗
What is the possession timeline for GLS AUREVA?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2032. Its registration runs to 31 Mar 2033; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around GLS AUREVA?From the records · HARERA, read 4 Nov 2026

GLS AUREVA is in Gurugram; the site address declared to HARERA is Revenue Estate Of Village Khaika, Sector 4, Sohna, District Gurugram, Haryana. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building GLS AUREVA?From the records · HARERA, read 4 Nov 2026

GLS AUREVA is a Aar Housing project, registered by its company AAR HOUSING PVT LTD.

The source ↗Aar Housing's projects and court record

The records

What the registers hold for GLS AUREVA: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/995/727/2025/98: Registered. Valid to 31 Mar 2033.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 25 OF 2025 is on the DTCP register, valid to 11 Mar 2030.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 6 Aug 2025, building plans 6 Aug 2025.Declared to HARERA, read 29 Oct 2026
The court record of Aar Housing’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 67 HARERA files, with the dates we read them
Registration no.
GGM/995/727/2025/98
Registration valid till
31 Mar 2033
Declared possession
31 Dec 2032

Declared by the promoter to HARERA

Land area
3.91 (Acre) (15,823.21 sq m)
FAR
0.91 proposed of 1.87 permissible
licence
25 of 2025 (12.03.2025)
Estimated project cost
₹318.73 crore
Cost of land
₹8.14 crore
Layout plan, declared approved (field 5a)
6 Aug 2025
Building plans, declared approved
6 Aug 2025
Construction to start
1 Apr 2026
Completion declared for
31 Dec 2032
Declared inventory · 6 types

Declared inventory

  • Apartment/Shops/Other Buildings · 51 units · 118.15 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 24 units · 117.1 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 17 units · 129.86 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 10 units · 117.1 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 56 units · 17.55 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 6 units · 11.89 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 16

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (12 Mar 2025)
  • II. AAI NOC — declared: already been obtained (6 Feb 2025)
  • III. ARAWALI NOC — declared: already been obtained (7 Feb 2025)
  • IV. ELECTRICAL ASSURANCE — declared: already been obtained (30 May 2025)
  • V. SEWERAGE ASSURANCE — declared: already been obtained (16 Jun 2025)
  • VI. STORM WATER ASSURANCE — declared: already been obtained (16 Jun 2025)
  • VII. WATER SUPPLY ASSURANCE — declared: already been obtained (16 Jun 2025)
  • VIII. BR III — declared: already been obtained (6 Aug 2025)
  • IX. FOREST NOC — declared: already been obtained (23 Jan 2025)
  • X. PHASING PLAN — declared: already been obtained (17 Jul 2025)
  • XI. LOI — declared: already been obtained (31 Dec 2024)
  • XII. STP WATER NOC — declared: already been obtained (9 Jun 2025)
  • XIII. DEMARCATION CUM ZONNIN PLAN — declared: already been obtained (13 Mar 2025)
  • XIV. ENVIRONMENT CLEARANCE — declared: yet to file for approval (1 Aug 2025)
  • XV. FIRE SCHEME APPROVAL — declared: yet to file for approval (10 Aug 2025)
  • XVI. SPE — declared: yet to file for approval (18 Aug 2025)
On file with HARERA · 67 files

On file with HARERA (67)

Plans

Site plan

1 file
Approved Site Plan8 Aug 2025

Layout plan

3 files
Latest Layout Plan8 Aug 2025Phasing Plan Approval7 Aug 2025Phasing Plan7 Aug 2025

Zoning plan

1 file
Zoning Plan4 Jul 2025

Demarcation plan

2 files
Superimposed Demarcation8 Aug 2025Demarcation Plan7 Aug 2025

Building plans

6 files
Approved Building Plans, Full Set8 Aug 2025EWS Section and Elevation8 Aug 2025Section Tower C8 Aug 2025

Floor plans

6 files
Basement 18 Aug 2025EWS8 Aug 2025Ground and Stilt Tower C8 Aug 2025

Services

Sewerage and drainage

4 files
Sewerage Layout12 Aug 2025Storm Water Layout12 Aug 2025Storm Water Assurance4 Jul 2025Sewerage Assurance4 Jul 2025

Water supply

3 files
Domestic Water Supply Layout12 Aug 2025Flushing and Irrigation Layout12 Aug 2025Water Supply Assurance4 Jul 2025

Electricity

3 files
Electrical Layout12 Aug 2025Street Light Layout12 Aug 2025Electrical Assurance4 Jul 2025

Roads

1 file
Road Layout12 Aug 2025

Landscape and green areas

1 file
Green Area and Services8 Aug 2025

Service plans

1 file
Service Plans on the Layout8 Aug 2025

Approvals and clearances

DTCP licence

4 files
Aggr LC IV16 Oct 2025LC IV7 Aug 2025LOI7 Aug 2025Licence Copy with Land Schedule4 Jul 2025

Other NOCs and clearances

6 files
Counstruction NOC16 Oct 2025AAI NOC - Aar Housing16 Oct 2025STP Water NOC7 Aug 2025

Land records

Land records

8 files
Collaboration-A16 Oct 2025Title Search Report16 Oct 2025Revenue Record Entry of Licence and Collaboration8 Aug 2025

Sales papers

Allotment and sale agreements

3 files
Conveyance Deed16 Oct 2025Allotment16 Oct 2025BBA16 Oct 2025

Money

Accounts and finance

7 files
Project Report with Brouchree16 Oct 2025Net Worth16 Oct 2025Payment Receipt16 Oct 2025

The promoter’s papers

Declarations and affidavits

3 files
Application16 Oct 2025The Promoter’s Declaration on Affidavit11 Aug 2025Bank Undertaking8 Aug 2025

Other filings

Other filings

4 files
Aggr Bilateral16 Oct 2025Commercial8 Aug 2025Swimming Pool Dwg8 Aug 2025Bilateral Agreement7 Aug 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

25 OF 2025 · AAR HOUSING PVT. LTD. · SOHNA

Licence valid to 11 Mar 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 12 Aug 2025 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

25 OF 2025: 9 parcels, 4.75 acres in all, in Khailka (hadbast 197), tehsil Sohna.

The licence register prints the same licensed area, 4.75 acres.

  • 30//108 kanal
  • 31//14/12 kanal
  • 31//68 kanal
  • 31//77 kanal 10 marla
Show the other 5 parcels
  • 31//710 marla
  • 31//3/1/11 kanal 12 marla
  • 31//8/1/17 kanal 18 marla
  • 31//9/1/12 kanal 9 marla
  • 23//23/31 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Khailka (hadbast 197), tehsil Sohna. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 30//10.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan8 Aug 2025

Layout plan

3 files
Latest Layout Plan8 Aug 2025Phasing Plan Approval7 Aug 2025Phasing Plan7 Aug 2025

Building plans

6 files
Approved Building Plans, Full Set8 Aug 2025EWS Section and Elevation8 Aug 2025Section Tower C8 Aug 2025Terrace Tower C8 Aug 2025BR III8 Aug 2025Elevation Tower C8 Aug 2025

Floor plans

6 files
Basement 18 Aug 2025EWS8 Aug 2025Ground and Stilt Tower C8 Aug 2025Typical Floor 1, 2, 8 to 17 Tower C8 Aug 2025Typical Floor 3 to 7 Tower C8 Aug 2025Basement 28 Aug 2025

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (67 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3534 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Aar Housing

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.