Skip to content

GODREJ ARIA & 101 (VOL. II)

by Wonder City Buildcon · Gurugram

Not on our price list yet

About this project

Key facts

Location
Gurugram
Registered by
WONDER CITY BUILDCON LIMITEDthe company that filed it, for Wonder City Buildcon
Timeline
  1. 10 Feb 2020Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Aug 2028Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside0.988 acres in all, by use
  • Other uses0.68 acres · 69%
  • Apartment buildings0.16 acres · 16%
  • Green belts0.148 acres · 15%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningAll provided of standard company make
  • Kitchen(floors-vitrified tiles external doors & windows-powder coated aluminum internal walls-ceramic tiles 2'-0" above counter. fixtures & fittings-granite top with stainless steel sink with drain board)
  • Kitchen appliancesAll provided of standard company make
  • FloorsLiving & dining room/kitchen- vitrified tiles bedrooms-laminated wooden floor toilets - vitrified tiles balcony- anti skid tiles utility room-ceramic tiles
  • WallsLiving room & dining room,bedrooms- oil based lustre – internal acrylic distemper toilets – ceramic tiles below grid ceiling kitchen- ceramic tiles 2'-0" above counter. utility room- oil bound distemper
  • BathroomsAll provided of standard company make
  • WindowsPowder coated aluminum
  • Main doorPrehung- LVL with veneer

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SEC 79, NAURANGPUR

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 1

Questions buyers ask

Is GODREJ ARIA & 101 (VOL. II) registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/746/478/2023/90. Valid to 30 Aug 2028.

The source ↗
How is the connectivity around GODREJ ARIA & 101 (VOL. II)?From the records · HARERA, read 4 Nov 2026

GODREJ ARIA & 101 (VOL. II) is in Gurugram; the site address declared to HARERA is Sec 79, Naurangpur. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building GODREJ ARIA & 101 (VOL. II)?From the records · HARERA, read 4 Nov 2026

GODREJ ARIA & 101 (VOL. II) is a Wonder City Buildcon project, registered by its company WONDER CITY BUILDCON LIMITED.

The source ↗Wonder City Buildcon's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for GODREJ ARIA & 101 (VOL. II): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/746/478/2023/90: Registered. Valid to 30 Aug 2028.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 47 OF 2013 is on the DTCP register, valid to 5 Jun 2030.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 10 Feb 2020, building plans 10 Feb 2020.Declared to HARERA, read 29 Oct 2026
The court record of Wonder City Buildcon’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 50 HARERA files, with the dates we read them
Registration no.
GGM/746/478/2023/90
Registration valid till
30 Aug 2028

Declared by the promoter to HARERA

Land area
0.9875 (Acre) (3,996.27 sq m)
FAR
1.75 proposed of 1.75 permissible
licence
47 of 2013 dated 06.06.2013(14.59375 acres) 109 of 2014 dated 14.08.2014 (2.8375 acres)
Estimated project cost
₹111.47 crore
Cost of land
₹40.53 crore
Layout plan, declared approved (field 5a)
10 Feb 2020
Building plans, declared approved
10 Feb 2020
Declared inventory · 4 types

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE 2BHK · 1 unit · 950.45 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE 3.5 BHK · 27 units · 1,323.32 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE 3.5 BHK · 14 units · 1,292.64 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE 3.5 BHK · 14 units · 1,324.93 sq m carpet
Statutory approvals, as declared · 28

Statutory approvals, as declared

  • I. LICENCE NO. 47 OF 2013 — declared: already been obtained (6 Jun 2013)
  • II. RENEWAL OF LICENCE NO. 47 OF 2013 — declared: already been obtained (2 Aug 2021)
  • III. LICENCE NO. 109 OF 2014 — declared: already been obtained (14 Aug 2014)
  • IV. RENEWAL OF LICENCE NO. 109 OF 2014 — declared: already been obtained (30 Sept 2019)
  • V. ZONING PLAN — declared: already been obtained (14 Aug 2014)
  • VI. NOC FOR HEIGHT CLEARANCE — declared: already been obtained (23 Jul 2014)
  • VII. REVALIDATION OF NOC FOR HEIGHT CLEARANCE — declared: already been obtained (23 May 2019)
  • VIII. NOC FOR HEIGHT CLEARANCE — declared: already been obtained (18 May 2015)
  • IX. REVALIDATION OF NOC FOR HEIGHT CLEARANCE — declared: already been obtained (25 Jun 2020)
  • X. APPROVAL OF BUILDING PLAN — declared: already been obtained (20 Aug 2014)
  • XI. APPROVAL OF REVISED BUILDING PLAN — declared: already been obtained (7 Aug 2015)
  • XII. HUDA NOC FOR CONSTRUCTION PURPOSE — declared: already been obtained (24 Jul 2014)
  • XIII. HUDA NOC FOR CONSTRUCTION PURPOSE — declared: already been obtained (5 May 2015)
  • XIV. APPROVAL OF SERVICE PLAN ESTIMATES — declared: already been obtained (8 Mar 2018)
  • XV. APPROVAL OF FIRE SCHEME — declared: already been obtained (12 Dec 2017)
  • XVI. MINING APPROVAL — declared: already been obtained (12 Jan 2016)
  • XVII. APPROVAL OF ENVIRONMENT CLEARANCE — declared: already been obtained (1 May 2017)
  • XVIII. FOREST NOC — declared: already been obtained (11 Aug 2014)
  • XIX. FOREST NOC — declared: already been obtained (11 Jun 2015)
  • XX. ASSURANCE OF ELECTRICAL LOAD — declared: already been obtained (16 Aug 2016)
  • XXI. ASSURANCE OF WATER SUPPLY — declared: already been obtained (2 Aug 2016)
  • XXII. ASSURANCE OF SEWERAGE CONNECTION — declared: already been obtained (29 Jul 2016)
  • XXIII. CTE — declared: already been obtained (21 Jun 2017)
  • XXIV. REVALIDATION OF BUILDING PLAN — declared: already been obtained (10 Feb 2020)
  • XXV. REVALIDATION OF BUILDING PLAN — declared: already been obtained (1 Dec 2020)
  • XXVI. MINING PERMISSION — declared: already been obtained (11 Jan 2018)
  • XXVII. NOC FOR HEIGHT CLEARANCE — declared: already been obtained (5 Aug 2022)
  • XXVIII. NOC FOR HEIGHT CLEARANCE — declared: already been obtained (5 Jun 2023)
On file with HARERA · 50 files

On file with HARERA (50)

Plans

Site plan

2 files
Tower-G-Site Plan Layouts5 Oct 2023Approved Site Plan26 Nov 2021

Layout plan

2 files
Basement Parking Layout Plan Godrej-1015 Oct 2023Latest Layout Plan26 Nov 2021

Zoning plan

1 file
Zoning Plan6 Jun 2023

Demarcation plan

1 file
Superimposed Demarcation Plan5 Oct 2023

Building plans

7 files
Tower-7 Elevation 1 & 25 Oct 2023Approved Building Plans, Full Set5 Oct 2023Tower-7 Elevation 3 & 45 Oct 2023

Floor plans

2 files
Tower-7 Floor Plan-15 Oct 2023Tower-7 Floor Plan 25 Oct 2023

Services

Sewerage and drainage

3 files
Storm Plan5 Oct 2023Sewer Plan5 Oct 2023Assurance Sewerage6 Jun 2023

Water supply

2 files
Water Supply Plan5 Oct 2023Assurance Water6 Jun 2023

Electricity

2 files
Electrical Load Availability5 Oct 2023Tower J&H and Tower-G-Lighting Layout5 Oct 2023

Roads

1 file
Road Plan5 Oct 2023

Landscape and green areas

1 file
Landscape Plan5 Oct 2023

Service plans

2 files
Service Plans on the Layout5 Oct 2023Approval of Service Plan Estimate6 Jun 2023

Approvals and clearances

Occupation certificate (OC)

1 file
Occupation Certificate Dated 01.10.20195 Oct 2023

DTCP licence

1 file
Licence Copy with Land Schedule6 Jun 2023

Environment clearance

1 file
Environment Clearance5 Oct 2023

Fire safety

1 file
Fire Scheme Approval5 Oct 2023

Other NOCs and clearances

12 files
AAI Approval5 Oct 2023Forest NOC5 Oct 2023Renewal of NOC for Height Clearance (2.83 Acs)10 Jul 2023

Money

Accounts and finance

4 files
CA Certificate Inventory Tower G5 Oct 2023Non-Default Certificate from a CA5 Oct 2023CA Certificate Cost Certificate Tower G5 Oct 2023CA Certificate on the Application’s Figures10 Jun 2023

The promoter’s papers

Declarations and affidavits

3 files
Bank Undertaking- Tower G5 Oct 2023The Promoter’s Declaration on Affidavit5 Oct 2023Affidavit of Promoter Regarding Arrangement with the Bank of Master Account- Tower G5 Oct 2023

Other filings

Other filings

1 file
Bip-Jdr5 Oct 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

47 OF 2013 · Sterling Infrastructure Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 5 Jun 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

109 OF 2014 · Sterling Infrastructure Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 13 Aug 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 12 Jul 2023 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 2 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

47 OF 2013: 33 parcels, 14.5938 acres in all, in Nurangpur (hadbast 157), tehsil Manesar.

The licence register prints the same licensed area, 14.59 acres.

  • 48//148 kanal
  • 48//16/14 kanal 10 marla
  • 48//16/21 kanal 6 marla
  • 48//16/32 kanal 4 marla
Show the other 29 parcels
  • 48//176 kanal
  • 48//18/19 marla
  • 48//18/23 kanal 11 marla
  • 48//19/13 kanal 12 marla
  • 48//19/22 kanal
  • 48//19/32 kanal 8 marla
  • 48//208 kanal
  • 48//21/24 kanal
  • 48//22/14 kanal 8 marla
  • 48//23/21 kanal 2 marla
  • 48//23/32 kanal 13 marla
  • 48//23/41 kanal 16 marla
  • 48//24 min north6 kanal
  • 48//25/1/11 kanal 9 marla
  • 48//25/2/11 kanal
  • 58//2/13 kanal 4 marla
  • 58//2/23 kanal 8 marla
  • 58//3/1 min west1 kanal 6 marla
  • 47//15/32 kanal 17 marla
  • 47//16/13 kanal 16 marla
  • 49//12/35 kanal 2 marla
  • 49//198 kanal
  • 49//208 kanal
  • 49//21/18 marla
  • 49//21/21 kanal 6 marla
  • 49//228 kanal
  • 49//23/11 kanal 8 marla
  • 48//172 kanal
  • 48//22/23 kanal 12 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

109 OF 2014: 6 parcels, 2.8375 acres in all, in Nurangpur (hadbast 157), tehsil Manesar.

The licence register prints the same licensed area, 2.84 acres.

  • 48//21/14 kanal
  • 48//23/512 marla
  • 48//7/22 kanal
  • 48//12/2/22 kanal
Show the other 2 parcels
  • 47//258 kanal
  • rectangle 47, kila 24 min6 kanal 2 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Nurangpur (hadbast 157), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 48//14.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Tower-G-Site Plan Layouts5 Oct 2023Approved Site Plan26 Nov 2021

Layout plan

2 files
Basement Parking Layout Plan Godrej-1015 Oct 2023Latest Layout Plan26 Nov 2021

Building plans

7 files
Tower-7 Elevation 1 & 25 Oct 2023Approved Building Plans, Full Set5 Oct 2023Tower-7 Elevation 3 & 45 Oct 2023Approval of Building Plan5 Oct 2023Tower 7 Section AA& Bb5 Oct 2023Revalidation of Building Plan5 Jul 2023Revised Building Plan6 Jun 2023

Floor plans

2 files
Tower-7 Floor Plan-15 Oct 2023Tower-7 Floor Plan 25 Oct 2023

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (50 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1749 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Wonder City Buildcon

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.