- OASIS LANDMARKS LLPthe company that filed it, for Oasis Landmarks
- 3 Oct 2018Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 31 Dec 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026
- 31 Dec 2029Registration valid toHARERA, read 4 Nov 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- Under 1,000 sq ft776–915 sq ft70
- 1,000–1,500 sq ft1,071–1,076 sq ft56
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 1 row of a single unit, because the form lists homes, shops and other buildings in one table.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Roads1,409 m² · 24%
- Parking1,250 m² · 22%
- Apartment buildings1,026 m² · 18%
- Other uses808 m² · 14%
- Parks and playgrounds600 m² · 10%
- Club house513 m² · 9%
- Sewage and waste treatment159 m² · 3%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- KitchenGranite counter with sink and CP fittings
- LiftsStone architrave and italian marble/stone flooring in CAR BODY and granite cladding
- WardrobesNo wardrobe
- FloorsVitrified tile or EQV. in living/dining, wooden flooring or EQV. in bedrooms, anti-skid tiles or EQV. in toilets, kitchen, balcony & utility
- WallsAcrylic emulsion or EQV. in intenal walls, oil bound distemper or EQV. in ceiling, weather proof or EQV. in external
- BathroomsRocca/parryware or equivalent
- WindowsAnodised aluminium/EQ. frame with annealed glass
- Main doorMAIN door :- TEAK wood/EQ. with veneer/EQ. finish
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR 88A & 89A
The builder
- OC or CC dispatched: 4
- Registered, no OC or CC yet: 1
Questions buyers ask
Is GODREJ ICON TOWER 4/E AND TOWER 5/F registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/670/402/2023/14. Valid to 31 Dec 2029.
The source ↗What is the possession timeline for GODREJ ICON TOWER 4/E AND TOWER 5/F?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Dec 2025. Its registration runs to 31 Dec 2029; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around GODREJ ICON TOWER 4/E AND TOWER 5/F?From the records · HARERA, read 4 Nov 2026
GODREJ ICON TOWER 4/E AND TOWER 5/F is in Gurugram; the site address declared to HARERA is Sector 88a & 89a. Bhumiq has not measured its distance to the main roads and metro lines yet.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building GODREJ ICON TOWER 4/E AND TOWER 5/F?From the records · HARERA, read 4 Nov 2026
GODREJ ICON TOWER 4/E AND TOWER 5/F is a Oasis Landmarks project, registered by its company OASIS LANDMARKS LLP.
The source ↗Oasis Landmarks's projects and court recordThe records
What the registers hold for GODREJ ICON TOWER 4/E AND TOWER 5/F: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/670/402/2023/14: Registered. Valid to 31 Dec 2029.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 85 OF 2013 is on the DTCP register, valid to 9 Oct 2029.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 3 Oct 2018, building plans 3 Oct 2018.Declared to HARERA, read 29 Oct 2026
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 73 HARERA files, with the dates we read them
- Registration no.
- GGM/670/402/2023/14
- Registration valid till
- 31 Dec 2029
- Declared possession
- 31 Dec 2025
Declared by the promoter to HARERA
- Land area
- 1.424625 (Acre) (5,765.25 sq m)
- FAR
- 0.25 proposed of 1.75 permissible
- licence
- 85 of 2013(10-10-2013), 151 of 2014(05-09-2014)
- Estimated project cost
- ₹126.60 crore
- Cost of land
- ₹10.68 crore
- Layout plan, declared approved (field 5a)
- 3 Oct 2018
- Building plans, declared approved
- 3 Oct 2018
- Completion declared for
- 31 Dec 2025
Declared inventory · 7 types
Declared inventory
- APARTMENT/SHOPS/OTHER BUILDINGS Type 1 BHK + 2 TOI · 1 unit · 55.98 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 2 BHK + STUDY, TYPE - J · 8 units · 81.18 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 2 BHK + STUDY, TYPE - K · 7 units · 81.15 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 2 BHK + STUDY, TYPE - L · 8 units · 84.97 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK - TYPE - E · 8 units · 99.47 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 2 BHK - TYPE - L · 47 units · 72.13 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK - TYPE - G · 48 units · 99.96 sq m carpet · one flat
Statutory approvals, as declared · 36
Statutory approvals, as declared
- I. LOI (13.759 ACS) — declared: already been obtained (26 Mar 2013)
- II. LICENCE NO. 85 OF 2013 — declared: already been obtained (10 Oct 2013)
- III. RENEWAL OF LICENCE — declared: already been obtained (9 Dec 2019)
- IV. LOI (0.925 ACS) — declared: already been obtained (28 Aug 2014)
- V. LICENCE NO. 151 OF 2014 — declared: already been obtained (5 Sept 2014)
- VI. RENEWAL OF LICENCE — declared: already been obtained (25 Oct 2019)
- VII. CHANGE OF DEVELOPER — declared: already been obtained (3 Oct 2018)
- VIII. ZONING PLAN — declared: already been obtained (4 Sept 2015)
- IX. NOC FOR HEIGHT CLEARANCE (13.759 ACS) — declared: already been obtained (17 Feb 2014)
- X. REVALIDATION OF NOC FOR HEIGHT CLEARANCE — declared: already been obtained (23 May 2019)
- XI. NOC FOR HEIGHT CLEARANCE (0.925 ACS) — declared: already been obtained (12 Feb 2016)
- XII. BUILDING PLAN APPROVAL — declared: already been obtained (9 Apr 2014)
- XIII. REVISED BUILDING PLAN APPROVAL — declared: already been obtained (3 Oct 2018)
- XIV. MINING PERMISSION — declared: already been obtained (1 Oct 2014)
- XV. ARAVALI NOC (13.759 ACS) — declared: already been obtained (22 Sept 2016)
- XVI. ARAVALI NOC (0.925 ACRES) — declared: already been obtained (22 Dec 2015)
- XVII. FOREST NOC (13.759 ACS) — declared: already been obtained (24 Mar 2014)
- XVIII. FOREST NOC (0.925 ACS) — declared: already been obtained (9 Dec 2015)
- XIX. ENVIRONMENT CLEARANCE — declared: already been obtained (3 Sept 2014)
- XX. ENVIRONMENT CLEARANCE — declared: already been obtained (14 Sept 2017)
- XXI. ENVIRONMENT CLEARANCE — declared: already been obtained (30 Apr 2021)
- XXII. CONSENT TO ESTABLISH — declared: already been obtained (6 Oct 2014)
- XXIII. CONSENT TO ESTABLISH — declared: already been obtained (27 Nov 2017)
- XXIV. WATER ASSURNACE — declared: already been obtained (20 Feb 2017)
- XXV. SEWERAGE ASSURANCE — declared: already been obtained (29 Aug 2016)
- XXVI. ELECTRICITY LOAD ASSURANCE — declared: already been obtained (27 Nov 2015)
- XXVII. REVISED FIRE SCHEME — declared: already been obtained (24 Apr 2019)
- XXVIII. SERVICE PLAN ESTIMATE — declared: already been obtained (5 Feb 2019)
- XXIX. FIRE NOC I — declared: already been obtained (19 Dec 2018)
- XXX. FIRE NOC II — declared: already been obtained (20 Aug 2020)
- XXXI. FIRE NOC III — declared: already been obtained (23 Oct 2021)
- XXXII. WATER CONNECTION APPROVAL — declared: already been obtained (22 May 2019)
- XXXIII. SEWERAGE & SEWER WATER APPROVAL — declared: already been obtained (9 May 2019)
- XXXIV. OCCUPATION CERTIFICATE — declared: already been obtained (29 Mar 2019)
- XXXV. OCCUPATION CERTIFICATE — declared: already been obtained (18 Sept 2020)
- XXXVI. OCCUPATION CERTIFICATE — declared: already been obtained (25 Jan 2022)
On file with HARERA · 73 files
On file with HARERA (73)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
2 filesDemarcation plan
2 filesBuilding plans
11 filesFloor plans
11 filesServices
Sewerage and drainage
3 filesWater supply
3 filesElectricity
1 fileRoads
1 fileService plans
2 filesApprovals and clearances
Occupation certificate (OC)
3 filesDTCP licence
8 filesEnvironment clearance
3 filesFire safety
4 filesOther NOCs and clearances
11 filesLand records
Land records
1 fileMoney
Accounts and finance
1 fileThe promoter’s papers
Declarations and affidavits
1 fileOther filings
Other filings
3 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The 2 DTCP licences named on the application
85 OF 2013 · Oasis Landmarks LLP · GURGAON-MANESAR
Licence valid to 9 Oct 2029
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
151 OF 2014 · Oasis Landmarks LLP · GURGAON-MANESAR
Licence valid to 4 Sept 2029
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 5 Dec 2022 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the 2 licences
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
85 OF 2013: 22 parcels, 13.7593 acres in all, in Harsuru (hadbast 107), tehsil Harsaru.
The licence register prints the same licensed area, 13.76 acres.
- 86//1/15 kanal 7 marla
- 86//1/33 marla
- 86//28 kanal
- 86//36 kanal
Show the other 18 parcels
- 86//32 kanal
- 86//48 kanal
- 73//124 kanal 19 marla
- 73//122 kanal
- 73//137 kanal 11 marla
- 73//147 kanal 11 marla
- 73//15/13 kanal 12 marla
- 73//16/23 kanal 16 marla
- 73//178 kanal
- 73//188 kanal
- 73//21/22 kanal
- 73//21/22 kanal 4 marla
- 73//7/14 kanal
- 73//23/26 kanal 4 marla
- 73//24/26 kanal 4 marla
- 73//25/26 kanal 4 marla
- 73//22/26 kanal 4 marla
- 73//21/1/22 kanal
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
151 OF 2014: 2 parcels, 0.925 acres in all, in Harsuru (hadbast 107), tehsil Harsaru.
The licence register prints the same licensed area, 0.925 acres.
- 73//45 kanal
- 73//7/22 kanal 8 marla
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Harsuru (hadbast 107), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 86//1/1.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
11 filesFloor plans
11 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (73 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/2232 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Oasis Landmarks
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.