GODREJ ICON TOWER 4/E AND TOWER 5/F

by Oasis Landmarks · Gurugram

Not on our price list yet

Possession 31 Dec 2025 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Home types
1, 2 and 3 BHK
Carpet area
776–1,076 sq ft
In m²about 72–100 m², as declared
Registered by
OASIS LANDMARKS LLPthe company that filed it, for Oasis Landmarks
Timeline
  1. 3 Oct 2018Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Dec 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 31 Dec 2029Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

126homes, 776 to 1,076 sq ft of carpet area
  • Under 1,000 sq ft776–915 sq ft70
  • 1,000–1,500 sq ft1,071–1,076 sq ft56

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 1 row of a single unit, because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside5,765 m² in all, by use
  • Roads1,409 m² · 24%
  • Parking1,250 m² · 22%
  • Apartment buildings1,026 m² · 18%
  • Other uses808 m² · 14%
  • Parks and playgrounds600 m² · 10%
  • Club house513 m² · 9%
  • Sewage and waste treatment159 m² · 3%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenGranite counter with sink and CP fittings
  • LiftsStone architrave and italian marble/stone flooring in CAR BODY and granite cladding
  • WardrobesNo wardrobe
  • FloorsVitrified tile or EQV. in living/dining, wooden flooring or EQV. in bedrooms, anti-skid tiles or EQV. in toilets, kitchen, balcony & utility
  • WallsAcrylic emulsion or EQV. in intenal walls, oil bound distemper or EQV. in ceiling, weather proof or EQV. in external
  • BathroomsRocca/parryware or equivalent
  • WindowsAnodised aluminium/EQ. frame with annealed glass
  • Main doorMAIN door :- TEAK wood/EQ. with veneer/EQ. finish

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR 88A & 89A

The builder

Its 5 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 4
  • Registered, no OC or CC yet: 1

Questions buyers ask

Is GODREJ ICON TOWER 4/E AND TOWER 5/F registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/670/402/2023/14. Valid to 31 Dec 2029.

The source ↗
What is the possession timeline for GODREJ ICON TOWER 4/E AND TOWER 5/F?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2025. Its registration runs to 31 Dec 2029; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around GODREJ ICON TOWER 4/E AND TOWER 5/F?From the records · HARERA, read 4 Nov 2026

GODREJ ICON TOWER 4/E AND TOWER 5/F is in Gurugram; the site address declared to HARERA is Sector 88a & 89a. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building GODREJ ICON TOWER 4/E AND TOWER 5/F?From the records · HARERA, read 4 Nov 2026

GODREJ ICON TOWER 4/E AND TOWER 5/F is a Oasis Landmarks project, registered by its company OASIS LANDMARKS LLP.

The source ↗Oasis Landmarks's projects and court record

The records

What the registers hold for GODREJ ICON TOWER 4/E AND TOWER 5/F: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/670/402/2023/14: Registered. Valid to 31 Dec 2029.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 85 OF 2013 is on the DTCP register, valid to 9 Oct 2029.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 3 Oct 2018, building plans 3 Oct 2018.Declared to HARERA, read 29 Oct 2026
The court record of Oasis Landmarks’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 73 HARERA files, with the dates we read them
Registration no.
GGM/670/402/2023/14
Registration valid till
31 Dec 2029
Declared possession
31 Dec 2025

Declared by the promoter to HARERA

Land area
1.424625 (Acre) (5,765.25 sq m)
FAR
0.25 proposed of 1.75 permissible
licence
85 of 2013(10-10-2013), 151 of 2014(05-09-2014)
Estimated project cost
₹126.60 crore
Cost of land
₹10.68 crore
Layout plan, declared approved (field 5a)
3 Oct 2018
Building plans, declared approved
3 Oct 2018
Completion declared for
31 Dec 2025
Declared inventory · 7 types

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type 1 BHK + 2 TOI · 1 unit · 55.98 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2 BHK + STUDY, TYPE - J · 8 units · 81.18 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2 BHK + STUDY, TYPE - K · 7 units · 81.15 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2 BHK + STUDY, TYPE - L · 8 units · 84.97 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK - TYPE - E · 8 units · 99.47 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2 BHK - TYPE - L · 47 units · 72.13 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK - TYPE - G · 48 units · 99.96 sq m carpet · one flat
Statutory approvals, as declared · 36

Statutory approvals, as declared

  • I. LOI (13.759 ACS) — declared: already been obtained (26 Mar 2013)
  • II. LICENCE NO. 85 OF 2013 — declared: already been obtained (10 Oct 2013)
  • III. RENEWAL OF LICENCE — declared: already been obtained (9 Dec 2019)
  • IV. LOI (0.925 ACS) — declared: already been obtained (28 Aug 2014)
  • V. LICENCE NO. 151 OF 2014 — declared: already been obtained (5 Sept 2014)
  • VI. RENEWAL OF LICENCE — declared: already been obtained (25 Oct 2019)
  • VII. CHANGE OF DEVELOPER — declared: already been obtained (3 Oct 2018)
  • VIII. ZONING PLAN — declared: already been obtained (4 Sept 2015)
  • IX. NOC FOR HEIGHT CLEARANCE (13.759 ACS) — declared: already been obtained (17 Feb 2014)
  • X. REVALIDATION OF NOC FOR HEIGHT CLEARANCE — declared: already been obtained (23 May 2019)
  • XI. NOC FOR HEIGHT CLEARANCE (0.925 ACS) — declared: already been obtained (12 Feb 2016)
  • XII. BUILDING PLAN APPROVAL — declared: already been obtained (9 Apr 2014)
  • XIII. REVISED BUILDING PLAN APPROVAL — declared: already been obtained (3 Oct 2018)
  • XIV. MINING PERMISSION — declared: already been obtained (1 Oct 2014)
  • XV. ARAVALI NOC (13.759 ACS) — declared: already been obtained (22 Sept 2016)
  • XVI. ARAVALI NOC (0.925 ACRES) — declared: already been obtained (22 Dec 2015)
  • XVII. FOREST NOC (13.759 ACS) — declared: already been obtained (24 Mar 2014)
  • XVIII. FOREST NOC (0.925 ACS) — declared: already been obtained (9 Dec 2015)
  • XIX. ENVIRONMENT CLEARANCE — declared: already been obtained (3 Sept 2014)
  • XX. ENVIRONMENT CLEARANCE — declared: already been obtained (14 Sept 2017)
  • XXI. ENVIRONMENT CLEARANCE — declared: already been obtained (30 Apr 2021)
  • XXII. CONSENT TO ESTABLISH — declared: already been obtained (6 Oct 2014)
  • XXIII. CONSENT TO ESTABLISH — declared: already been obtained (27 Nov 2017)
  • XXIV. WATER ASSURNACE — declared: already been obtained (20 Feb 2017)
  • XXV. SEWERAGE ASSURANCE — declared: already been obtained (29 Aug 2016)
  • XXVI. ELECTRICITY LOAD ASSURANCE — declared: already been obtained (27 Nov 2015)
  • XXVII. REVISED FIRE SCHEME — declared: already been obtained (24 Apr 2019)
  • XXVIII. SERVICE PLAN ESTIMATE — declared: already been obtained (5 Feb 2019)
  • XXIX. FIRE NOC I — declared: already been obtained (19 Dec 2018)
  • XXX. FIRE NOC II — declared: already been obtained (20 Aug 2020)
  • XXXI. FIRE NOC III — declared: already been obtained (23 Oct 2021)
  • XXXII. WATER CONNECTION APPROVAL — declared: already been obtained (22 May 2019)
  • XXXIII. SEWERAGE & SEWER WATER APPROVAL — declared: already been obtained (9 May 2019)
  • XXXIV. OCCUPATION CERTIFICATE — declared: already been obtained (29 Mar 2019)
  • XXXV. OCCUPATION CERTIFICATE — declared: already been obtained (18 Sept 2020)
  • XXXVI. OCCUPATION CERTIFICATE — declared: already been obtained (25 Jan 2022)
On file with HARERA · 73 files

On file with HARERA (73)

Plans

Site plan

1 file
Approved Site Plan30 Nov 2022

Layout plan

1 file
Latest Layout Plan30 Nov 2022

Zoning plan

2 files
Zoning Plan Approval30 Nov 2022Zoning Plan30 Nov 2022

Demarcation plan

2 files
Demarcation Plan of GH-13.759 Acres11 Jul 2023Demarcation Plan30 Nov 2022

Building plans

11 files
Tower-5 Elevation11 Jul 2023Tower-5 Section11 Jul 2023Approval of Building Plan11 Jul 2023

Floor plans

11 files
Basement Plan (Second Level) Parcel-A & B (1)11 Jul 2023Tower-5 Typical as Built11 Jul 2023Basement Parcel D11 Jul 2023

Services

Sewerage and drainage

3 files
Sewerage Layout11 Jul 2023Strom Drainage Layout11 Jul 2023Sewerage Assurance30 Nov 2022

Water supply

3 files
Irrigation Drawing11 Jul 2023Water Supply Layout11 Jul 2023Water Assurnace30 Nov 2022

Electricity

1 file
Revised Electrical Load of 4618 Kw (26.10.17)11 Jul 2023

Roads

1 file
Road Layout11 Jul 2023

Service plans

2 files
Service Plan Estimate30 Nov 2022Service Plans on the Layout30 Nov 2022

Approvals and clearances

Occupation certificate (OC)

3 files
Occupation Certificate Phase I30 Nov 2022Occupation Certificate Phase II30 Nov 2022Occupation Certificate Phase III30 Nov 2022

DTCP licence

8 files
Renewal of Licence-85 of 201311 Jul 2023Renewal of Licence-151 of 201411 Jul 2023LOI (13.759 Acs)30 Nov 2022

Environment clearance

3 files
Environment Clearance-201411 Jul 2023Environment Clearance-201711 Jul 2023Environment Clearance-202111 Jul 2023

Fire safety

4 files
Fire NOC II30 Nov 2022Fire NOC III30 Nov 2022Fire Scheme30 Nov 2022Fire NOC I30 Nov 2022

Other NOCs and clearances

11 files
Water Permission11 Jul 2023Sewerage Permission11 Jul 2023Aravali NOC30 Nov 2022

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration11 Jul 2023

Money

Accounts and finance

1 file
Non-Default Certificate from a CA30 Nov 2022

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit11 Jul 2023

Other filings

Other filings

3 files
Folder D - Bs 19-2030 Nov 2022Folder D - Bs 20-2130 Nov 2022Folder D - Bs 21-2230 Nov 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

85 OF 2013 · Oasis Landmarks LLP · GURGAON-MANESAR

Licence valid to 9 Oct 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

151 OF 2014 · Oasis Landmarks LLP · GURGAON-MANESAR

Licence valid to 4 Sept 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 5 Dec 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 2 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

85 OF 2013: 22 parcels, 13.7593 acres in all, in Harsuru (hadbast 107), tehsil Harsaru.

The licence register prints the same licensed area, 13.76 acres.

  • 86//1/15 kanal 7 marla
  • 86//1/33 marla
  • 86//28 kanal
  • 86//36 kanal
Show the other 18 parcels
  • 86//32 kanal
  • 86//48 kanal
  • 73//124 kanal 19 marla
  • 73//122 kanal
  • 73//137 kanal 11 marla
  • 73//147 kanal 11 marla
  • 73//15/13 kanal 12 marla
  • 73//16/23 kanal 16 marla
  • 73//178 kanal
  • 73//188 kanal
  • 73//21/22 kanal
  • 73//21/22 kanal 4 marla
  • 73//7/14 kanal
  • 73//23/26 kanal 4 marla
  • 73//24/26 kanal 4 marla
  • 73//25/26 kanal 4 marla
  • 73//22/26 kanal 4 marla
  • 73//21/1/22 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

151 OF 2014: 2 parcels, 0.925 acres in all, in Harsuru (hadbast 107), tehsil Harsaru.

The licence register prints the same licensed area, 0.925 acres.

  • 73//45 kanal
  • 73//7/22 kanal 8 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Harsuru (hadbast 107), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 86//1/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan30 Nov 2022

Layout plan

1 file
Latest Layout Plan30 Nov 2022

Building plans

11 files
Tower-5 Elevation11 Jul 2023Tower-5 Section11 Jul 2023Approval of Building Plan11 Jul 2023Tower-4 Elevation (2)11 Jul 2023Tower-4 Elevation11 Jul 2023Tower-4 Section11 Jul 2023

Floor plans

11 files
Basement Plan (Second Level) Parcel-A & B (1)11 Jul 2023Tower-5 Typical as Built11 Jul 2023Basement Parcel D11 Jul 2023Basement Plan (First Level) Parcel-A & B (1)11 Jul 2023Tower-4 ( 2 to 5)11 Jul 2023Tower-4 (1ST Floor Comm. Building-3)11 Jul 2023

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (73 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2232 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Oasis Landmarks

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.