GODREJ VERANO

by Godrej Properties · Gurugram

Not on our price list yet

Possession 31 Aug 2033 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Carpet area
935–2,098 sq ft
In m²about 87–195 m², as declared
Registered by
GODREJ PROPERTIES LIMITEDthe company that filed it, for Godrej Properties
Timeline
  1. 2 Jul 2026Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 2 Jun 2033Registration valid toHARERA, read 4 Nov 2026
  3. 31 Aug 2033Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

616homes, 935 to 2,098 sq ft of carpet area
  • Under 1,000 sq ft935 sq ft3
  • 1,000–1,500 sq ft1,029–1,449 sq ft467
  • 1,500–2,000 sq ft1,625–1,908 sq ft76
  • 2,000–2,500 sq ft2,098 sq ft70

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 13 rows of a single unit, because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside39,065 m² in all, by use
  • Other usesas the form names them: Rain, Softscape, Hardscap17,764 m² · 45%
  • Roads8,207 m² · 21%
  • Land for community services, handed to the government4,597 m² · 12%
  • Apartment buildings3,698 m² · 9%
  • Club house1,953 m² · 5%
  • Electricity sub-station1,600 m² · 4%
  • Parking1,246 m² · 3%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenVitrified tiles
  • Kitchen appliancesModular kitchen with hob & chimney
  • FloorsVitrified tiles/laminate wooden flooring
  • WallsAcrylic emulsion/ oil bound distemper
  • BathroomsPVC & CPVC pipe
  • WindowsWooden / powder coated aluminum / UPVC
  • Main doorLaminate finish flush doors/MOU LDED shutter with wooden frame

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR-63A, GURUGRAM

The builder

Its 13 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 3
  • Registered, no OC or CC yet: 8
  • Other register states: 2

Questions buyers ask

Is GODREJ VERANO registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/1081/813/2026/53. Valid to 2 Jun 2033.

The source ↗
What is the possession timeline for GODREJ VERANO?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Aug 2033. Its registration runs to 2 Jun 2033; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around GODREJ VERANO?From the records · HARERA, read 4 Nov 2026

GODREJ VERANO is in Gurugram; the site address declared to HARERA is Sector-63a, Gurugram. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building GODREJ VERANO?From the records · HARERA, read 4 Nov 2026

GODREJ VERANO is a Godrej Properties project, registered by its company GODREJ PROPERTIES LIMITED.

The source ↗Godrej Properties's projects and court record

The records

What the registers hold for GODREJ VERANO: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/1081/813/2026/53: Registered. Valid to 2 Jun 2033.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 129 OF 2025 is on the DTCP register, valid to 22 Jul 2030.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 2 Jul 2026, building plans 2 Jul 2026.Declared to HARERA, read 29 Oct 2026
The court record of Godrej Properties’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 99 HARERA files, with the dates we read them
Registration no.
GGM/1081/813/2026/53
Registration valid till
2 Jun 2033
Declared possession
31 Aug 2033

Declared by the promoter to HARERA

Land area
9.65325 (Acre) (39,065.32 sq m)
FAR
2.4 proposed of 2.62 permissible
licence
129 of 2025 Dated 23.07.2025
Estimated project cost
₹2935.78 crore
Cost of land
₹1035.63 crore
Layout plan, declared approved (field 5a)
2 Jul 2026
Building plans, declared approved
2 Jul 2026
Construction to start
1 Sept 2026
Completion declared for
31 Aug 2033
Declared inventory · 37 types

Declared inventory — 37 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 36 units · 109.9 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 39 units · 110 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 39 units · 110 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 36 units · 109.9 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 3 units · 95.6 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 3 units · 86.9 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 38 units · 134.6 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 35 units · 194.9 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 13

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (23 Jul 2025)
  • II. ASSURANCE FOR WATER SUPPLY — declared: already been obtained (16 Apr 2026)
  • III. ASSURANCE FOR STORM WATER — declared: already been obtained (15 Apr 2026)
  • IV. ASSURANCE OF SEWERAGE CONNECTION — declared: already been obtained (16 Apr 2026)
  • V. HUDA CONSTRUCTION WATER NOC — declared: already been obtained (16 Apr 2026)
  • VI. FOREST NOC — declared: already been obtained (14 May 2026)
  • VII. AAI — declared: already been obtained (7 Apr 2026)
  • VIII. BR-III — declared: already been obtained (2 Jul 2026)
  • IX. PHASING PLAN LETTER — declared: already been obtained (1 May 2026)
  • X. ENVIRONMENT CLEARANCE — declared: already been obtained (30 Jun 2026)
  • XI. APPROVAL OF ELECTRIFICATION PLAN — declared: applied for but yet to receive (17 Jul 2026)
  • XII. SERVICE PLAN AND ESTIMATE APPROVAL — declared: applied for but yet to receive (20 Jul 2026)
  • XIII. FIRE SCHEME APPROVAL — declared: applied for but yet to receive (25 Jul 2026)
On file with HARERA · 99 files

On file with HARERA (99)

Plans

Site plan

1 file
Approved Site Plan2 Jul 2026

Layout plan

2 files
Phasing Plan Letter2 Jul 2026Latest Layout Plan2 Jul 2026

Zoning plan

1 file
Zoning Plan30 Jun 2026

Demarcation plan

2 files
Supermiposed Demarcation Plan13 Aug 2026Demarcation Plan30 Jun 2026

Building plans

39 files
Section-2 Tower-023 Jul 2026Tower 4 Terrace Floor Plan, Machine Room Plan Mumty,machine Room Terrace & Mumty Area3 Jul 2026Tower 02 Stilt, Ground Floor Plan, FAR Area Calculation & Ground Coverage3 Jul 2026

Floor plans

17 files
Basement Plan-013 Jul 2026Tower 4 Stilt,ground Floor Plan & Area Calculation3 Jul 2026Tower 02 Refuge Floor Plan & Area Calculation3 Jul 2026

Services

Sewerage and drainage

2 files
Assurance of Sewerage Connection1 Jul 2026Assurance for Storm Water1 Jul 2026

Water supply

1 file
Assurance for Water Supply1 Jul 2026

Electricity

1 file
Applied Electrical Plan6 Aug 2026

Service plans

3 files
Service Plans on the Layout13 Aug 2026Acknowledgment for SPE Applied6 Aug 2026Commercial, Club Building-01 Ground Floor Plan, Service Floor, Terrace Floor Plan and Area Calculation3 Jul 2026

Approvals and clearances

DTCP licence

4 files
LOI9 Jul 2026LC-IV2 Jul 2026COD2 Jul 2026Licence Copy with Land Schedule2 Jul 2026

Environment clearance

1 file
EC2 Jul 2026

Fire safety

2 files
Applied Fire Scheme Approval13 Aug 2026Applied Fire Scheme6 Aug 2026

Other NOCs and clearances

3 files
HUDA Construction Water NOC13 Aug 2026AAI1 Jul 2026Forest NOC1 Jul 2026

Land records

Land records

6 files
Revenue Record Entry of Licence and Collaboration13 Aug 2026Title Search13 Aug 2026Mutation30 Jun 2026

Sales papers

Allotment and sale agreements

1 file
Conveyance Deed2 Jul 2026

Money

Accounts and finance

4 files
Project Report13 Aug 2026CA Certificate on the Application’s Figures9 Jul 2026Non-Default Certificate from a CA6 Jul 2026Cash Flow Statement6 Jul 2026

Timeline and progress

Construction schedule

1 file
PERT13 Aug 2026

The promoter’s papers

Declarations and affidavits

8 files
NCZ, Forest Land, Powerline Shifting, Tree Cutting Non-Applicability Affidavit13 Aug 2026Affidavit Regarding No Litigation13 Aug 2026Affidavit Fortunea13 Aug 2026

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

129 OF 2025 · Godrej Properties Ltd. · GURGAON-MANESAR

Licence valid to 22 Jul 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 9 Jul 2026 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

129 OF 2025

DTCP’s page showed no land schedule for licence 129 OF 2025 when Bhumiq read it on 18 Oct 2026. verify at source

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan2 Jul 2026

Layout plan

2 files
Phasing Plan Letter2 Jul 2026Latest Layout Plan2 Jul 2026

Building plans

39 files
Section-2 Tower-023 Jul 2026Tower 4 Terrace Floor Plan, Machine Room Plan Mumty,machine Room Terrace & Mumty Area3 Jul 2026Tower 02 Stilt, Ground Floor Plan, FAR Area Calculation & Ground Coverage3 Jul 2026Club Building-02 Ground Floor FAR Area Calculation & Ground Coverage3 Jul 2026Elevation-B Tower-023 Jul 2026Elevation -A Tower 013 Jul 2026

Floor plans

17 files
Basement Plan-013 Jul 2026Tower 4 Stilt,ground Floor Plan & Area Calculation3 Jul 2026Tower 02 Refuge Floor Plan & Area Calculation3 Jul 2026Tower 3 Stilt,ground Floor Plan & Area Calculation3 Jul 2026Basement-02 Area Diagram3 Jul 2026Tower 3 Typical Floor Plan, Refuge Floor Plan & Area Calculation3 Jul 2026

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (99 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/4204 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Godrej Properties

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.