H L RESIDENCY AFFORDABLE GROUP HOUSING
by Hl Residency · Jhajjar
Not on our price list yet
Possession 8 Dec 2022 · as the developer declared it to HARERA
About this project
Key facts
- 15 Oct 2019Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 8 Dec 2022Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- Under 1,000 sq ft642 sq ft467
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Other usesas the form names them: To be utilized in future17,444 m² · 45%
- Roads5,538 m² · 14%
- Parking4,881 m² · 13%
- Apartment buildings4,433 m² · 12%
- Parks and playgrounds2,944 m² · 8%
- Green belts2,944 m² · 8%
- Sewage and waste treatment160 m² · under 1%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- KitchenOne sink without drain board
- LiftsTOWE F 6 NOS tower C 3 NOS
- FloorsVitrified tiles
- WallsWall putty with OBD
- BathroomsOne WASH basin one english SEAT with CP fitting
- Windows4MM glass
- Main doorFlush door shutter
- Electrical fittingsISI MARK switch socket
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
Bhumiq holds no map point for this project yet.The site address declared to HARERA: HL CITY SECTOR 37
The builder
- OC or CC dispatched: 4
- Registered, no OC or CC yet: 9
- Other register states: 6
Questions buyers ask
Is H L RESIDENCY AFFORDABLE GROUP HOUSING registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as HRERA-PKL-JJR-175-2019. The register’s record shows an end date of 8 Dec 2022. The register shows it as: Registration lapsed.
The source ↗What is the possession timeline for H L RESIDENCY AFFORDABLE GROUP HOUSING?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 8 Dec 2022. Its registration runs to 8 Dec 2022; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around H L RESIDENCY AFFORDABLE GROUP HOUSING?From the records · HARERA, read 4 Nov 2026
H L RESIDENCY AFFORDABLE GROUP HOUSING is in Jhajjar; the site address declared to HARERA is Hl City Sector 37. Bhumiq has not measured its distance to the main roads and metro lines yet.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building H L RESIDENCY AFFORDABLE GROUP HOUSING?From the records · HARERA, read 4 Nov 2026
H L RESIDENCY AFFORDABLE GROUP HOUSING is a Hl Residency project.
The source ↗Hl Residency's projects and court recordThe records
What the registers hold for H L RESIDENCY AFFORDABLE GROUP HOUSING: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration HRERA-PKL-JJR-175-2019: Registration lapsed. The register’s record shows an end date of 8 Dec 2022.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 75 OF 2019 is on the DTCP register: Licence ends soon; the register prints its validity to 22 Nov 2026.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 15 Oct 2019, building plans 15 Oct 2019.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 16 HARERA files, with the dates we read them
- Registration no.
- HRERA-PKL-JJR-175-2019
- Registration valid till
- 8 Dec 2022
- Declared possession
- 8 Dec 2022
Declared by the promoter to HARERA
- Land area
- 38345.325 (Sqr/mtrs)
- FAR
- the application prints 42.55, which is not a ratio
- licence
- 75 OF 2019
- Estimated project cost
- ₹59.47 crore
- Cost of land
- ₹5.26 crore
- Layout plan, declared approved (field 5a)
- 15 Oct 2019
- Building plans, declared approved
- 15 Oct 2019
- Construction to start
- 8 Dec 2019
- Completion declared for
- 8 Dec 2022
Declared inventory · 1 type
Declared inventory
- Apartment/Shops/Other Buildings · 467 units · 59.614 sq m carpet · 2 towers · one flat
Statutory approvals, as declared · 4
Statutory approvals, as declared
- I. LICENSE GRANTED BY DTCP — declared: already been obtained (23 Jul 2019)
- II. ZONING PLAN — declared: already been obtained (23 Jul 2019)
- III. MAP APPROVED BY CTP — declared: already been obtained (15 Oct 2019)
- IV. ENVIORNMENT CLEARENCE — declared: already been obtained (4 Nov 2019)
On file with HARERA · 16 files
On file with HARERA (16)
Plans
Site plan
2 filesLayout plan
1 fileBuilding plans
2 filesApprovals and clearances
DTCP licence
1 fileEnvironment clearance
1 fileLand records
Land records
1 fileSales papers
Allotment and sale agreements
2 filesMoney
Accounts and finance
2 filesThe promoter’s papers
Declarations and affidavits
1 fileCompany papers
1 fileOther filings
Other filings
2 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
75 OF 2019 · HL RESIDENCY PROPRIETOR SHAILAJA · BAHADURGARH
Licence valid to 22 Nov 2026
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Panchkula bench · submitted 15 Nov 2019 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/1 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
75 OF 2019: 22 parcels, 9.475 acres in all, in Nuna majra (hadbast 46), tehsil Bahadurgarh.
The licence register prints the same licensed area, 9.475 acres.
- 68//14/22 kanal 13 marla
- 68//15/1/11 kanal
- 68//15/1/22 kanal 2 marla
- 68//15/24 kanal
Show the other 18 parcels
- 68//16/1/110 marla
- 68//16/1/21 kanal 6 marla
- 68//178 kanal
- 68//248 kanal
- 68//269 marla
- 68//279 marla
- 68//37 kanal 19 marla
- 68//48 kanal
- 68//6/1/22 kanal 1 marla
- 68//6/2/13 kanal 6 marla
- 68//6/2/21 kanal 12 marla
- 68//7/16 kanal 14 marla
- 68//7/212 marla
- 68//8/117 marla
- 69//10/14 marla
- 69//116 kanal 16 marla
- 73//47 kanal 11 marla
- 73//7/11 kanal 15 marla
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Jhajjar, then the tehsil and the village: Nuna majra (hadbast 46), tehsil Bahadurgarh. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 68//14/2.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
2 filesLayout plan
1 fileBuilding plans
2 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (16 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/921 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Hl Residency
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Panchkula records showed the facts above. Statuses change. Verify at the portal for transactions.