ILD Greens

by ILD Millennium · Gurugram

Not on our price list yet

Possession 31 Mar 2016 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Carpet area
about 2,131 sq ft
In m²about 198 m², the average flat, as declared
Registered
18 Aug 2017
Registered by
ILD MILLANNIUM PRIVATE LIMITEDthe company that filed it, for ILD Millennium
Timeline
  1. 5 Sep 2014Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 1 Jan 2015Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 31 Mar 2016Possession, as declareddeclared to HARERA, read 29 Oct 2026
  4. 18 Aug 2017Registered with HARERAHARERA, read 3 Nov 2026
  5. 16 Aug 2018Registration valid toHARERA, read 3 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • KitchenGranite counter / 2’ DADO ceramic tile
  • LiftsJohnson / / equivalent
  • FloorsVitrified / antiskid ceramic tiles
  • WallsAcrylic paint / ceramic tiles
  • BathroomsSomany / RYBO or similar brand
  • Windows5/6MM plain glass with aluminium frame
  • Main doorLaminated flush door
  • Electrical fittingsAnchor ROMA /equivalent switches / power points

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: 37C

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Other register states: 1

Questions buyers ask

Is ILD Greens registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as 60 OF 2017, registered on 18 Aug 2017. Ended 16 Aug 2018. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for ILD Greens?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Mar 2016. Its registration runs to 16 Aug 2018; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ILD Greens?From the records · HARERA, read 3 Nov 2026

ILD Greens is in Gurugram; the site address declared to HARERA is 37c. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ILD Greens?From the records · HARERA, read 3 Nov 2026

ILD Greens is a ILD Millennium project, registered by its company ILD MILLANNIUM PRIVATE LIMITED.

The source ↗ILD Millennium's projects and court record

The records

What the registers hold for ILD Greens: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 60 OF 2017: Registration expired. Ended 16 Aug 2018.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 13 OF 2008 is on the DTCP register, valid to 30 Jan 2030.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 5 Sep 2014, building plans 1 Jan 2015.Declared to HARERA, read 29 Oct 2026
The court record of ILD Millennium’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 16 Aug 2018. HARERA Gurugram, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 33 HARERA files, with the dates we read them
Registration no.
60 OF 2017
Registration date
18 Aug 2017
Registration valid till
16 Aug 2018
Declared possession
31 Mar 2016

Declared by the promoter to HARERA

Land area
9.1490 (Acre) (37,024.69 sq m)
FAR
1.75 proposed of 1.75 permissible
licence
NO.13 DT 31.1.2008
Estimated project cost
₹265.22 crore
Cost of land
₹17.31 crore
Layout plan, declared approved (field 5a)
5 Sept 2014
Building plans, declared approved
1 Jan 2015
Completion declared for
31 Mar 2016
Declared inventory · 3 types

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK · 254 units · 57,923 sq m carpet · total for 254 flats, about 228 m² each
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK · 72 units · 12,040 sq m carpet · total for 72 flats, about 167.2 m² each
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK · 76 units · 9,638 sq m carpet · total for 76 flats, about 126.8 m² each
Statutory approvals, as declared · 16

Statutory approvals, as declared

  • I. FIRE NOC RENEWED — declared: already been obtained (9 May 2019)
  • II. LICENCE RENEWED — declared: already been obtained (17 Aug 2016)
  • III. LICENCE 13 OF 2008 (DT 31.1.2008) — declared: already been obtained (8 Jan 2009)
  • IV. FIRE SCHEME APPROVAL — declared: already been obtained (10 Oct 2014)
  • V. SITE PLAN — declared: already been obtained (10 Dec 2012)
  • VI. AIRPORT AUTHORITY APPROVAL — declared: already been obtained (13 Oct 2015)
  • VII. SEWAGE CONNECTIVITY — declared: already been obtained (31 Aug 2016)
  • VIII. WATER SUPPLY — declared: already been obtained (6 Sept 2016)
  • IX. CONSENT TO ESTABLISH — declared: already been obtained (12 Aug 2014)
  • X. CONSENT TO OPERATE — declared: already been obtained (22 Mar 2016)
  • XI. ZONING PLAN — declared: already been obtained (11 Dec 2011)
  • XII. ELECTRICAL APPROVAL — declared: already been obtained (4 May 2017)
  • XIII. POLLUTION APPROVAL — declared: already been obtained (21 Jan 2010)
  • XIV. BUILDING PLAN — declared: already been obtained (5 Jun 2015)
  • XV. SERVICE ESTIMATE — declared: already been obtained (23 Aug 2016)
  • XVI. LICENCE RENEWAL REQUEST — declared: applied for but yet to receive (8 Jan 2018)
On file with HARERA · 33 files

On file with HARERA (33)

Plans

Site plan

2 files
Site Plan30 Dec 2019Approved Site Plan30 Dec 2019

Layout plan

1 file
Latest Layout Plan3 Jan 2020

Zoning plan

1 file
Zoning Plan30 Dec 2019

Demarcation plan

2 files
Demarcation Plan30 Dec 2019Demarcation Plan28 Dec 2019

Building plans

1 file
Approved Building Plans, Full Set28 Dec 2019

Floor plans

3 files
Floor Plan30 Dec 2019Floor Plan30 Dec 2019Floor Plan30 Dec 2019

Services

Sewerage and drainage

2 files
Storm Water30 Dec 2019Sewer Connection30 Dec 2019

Water supply

1 file
Water Supply30 Dec 2019

Service plans

1 file
Service Plans on the Layout28 Dec 2019

Approvals and clearances

Occupation certificate (OC)

4 files
OC uploaded26 May 2025OC uploaded26 May 2025Occupation Certificate11 Mar 2025Occupation Certificate20 Sept 2024

DTCP licence

1 file
Licence Copy with Land Schedule30 Dec 2019

Other NOCs and clearances

1 file
Consent to Establish30 Dec 2019

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration28 Dec 2019

Sales papers

Allotment and sale agreements

2 files
Allotment Letter30 Dec 2019Conveyance Deed30 Dec 2019

Money

Accounts and finance

5 files
Cash Flow Statement3 Jan 2020CA Certificate on the Application’s Figures30 Dec 2019Balance Sheet 201630 Dec 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit30 Dec 2019

Other filings

Other filings

4 files
Air Port Authority Approval30 Dec 2019Booking Application30 Dec 2019Balance Sjheet 201830 Dec 2019Agreement30 Dec 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

13 OF 2008 · ALM Infotech City Pvt. Ltd · GURGAON-MANESAR

Licence valid to 30 Jan 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 7 Jan 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

13 OF 2008: 9 parcels, 15.4828 acres in all, in Basai (hadbast 50), tehsil Kadipur.

The licence register prints the same licensed area, 15.4829 acres.

  • rectangle 742, kila 742/21 bigha 3 biswa 17 biswansi
  • rectangle 743, kila 7437 bigha 8 biswa
  • rectangle 745, kila 745/21 bigha 13 biswa 13 biswansi
  • rectangle 469, kila 469/2 min3 bigha 6 biswa 15 biswansi
Show the other 5 parcels
  • rectangle 468, kila 468/22 bigha 8 biswa
  • rectangle 746, kila 746 min2 bigha 7 biswa
  • rectangle 746, kila 746 min2 bigha 8 biswa
  • rectangle 742, kila 742/1/22 bigha 6 biswa 8 biswansi
  • rectangle 745, kila 745/11 bigha 13 biswa 16 biswansi

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Basai (hadbast 50), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as rectangle 742, kila 742/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan30 Dec 2019Approved Site Plan30 Dec 2019

Layout plan

1 file
Latest Layout Plan3 Jan 2020

Building plans

1 file
Approved Building Plans, Full Set28 Dec 2019

Floor plans

3 files
Floor Plan30 Dec 2019Floor Plan30 Dec 2019Floor Plan30 Dec 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (33 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1125 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on ILD Millennium

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.