INDEPENDENT FLOORS AT DLF CITY PHASE I & III
by DLF · Gurugram
Not on our price list yet
Possession 14 Feb 2025 · as the developer declared it to HARERA
About this project
Key facts
- Registered by
- DLF HOMES PANCHKULA PRIVATE LIMITEDthe company that filed it, for DLF
- 30 Jun 2018Layout plan approveddeclared to HARERA, read 29 Oct 2026
- 16 Dec 2021Building plans approveddeclared to HARERA, read 29 Oct 2026
- 14 Feb 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Apartment buildings0.896 acres · 100%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningVRV/VRF AIR conditioning system in living, dining & bedroomswith high wall units
- KitchenWhite WASH / OBD
- Kitchen appliancesModular kitchen with hob, chimney, oven, microwave,dishwasher,refrigerator, washing machine (in balcony)
- LiftsBranded make
- WardrobesModular wardrobes of standard make in bedrooms (except in S.room)
- FloorsIPS flooring / tiles / marble / granite / laminated wood
- WallsWhite WASH / OBD
- WindowsMS or AL or wooden or UPVC
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
Bhumiq holds no map point for this project yet.The site address declared to HARERA: DLF CITY PHASE I AND DLF CITY PHASE III, GURUGRAM, HARYANA
The builder
- OC or CC dispatched: 18
- Registered, no OC or CC yet: 12
Questions buyers ask
Is INDEPENDENT FLOORS AT DLF CITY PHASE I & III registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/528/260/2022/03. Ended 14 Feb 2025. The register shows it as: Registration expired.
The source ↗What is the possession timeline for INDEPENDENT FLOORS AT DLF CITY PHASE I & III?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 14 Feb 2025. Its registration runs to 14 Feb 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around INDEPENDENT FLOORS AT DLF CITY PHASE I & III?From the records · HARERA, read 4 Nov 2026
INDEPENDENT FLOORS AT DLF CITY PHASE I & III is in Gurugram; the site address declared to HARERA is Dlf City Phase I And Dlf City Phase Iii, Gurugram, Haryana. Bhumiq has not measured its distance to the main roads and metro lines yet.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building INDEPENDENT FLOORS AT DLF CITY PHASE I & III?From the records · HARERA, read 4 Nov 2026
INDEPENDENT FLOORS AT DLF CITY PHASE I & III is a DLF project, registered by its company DLF HOMES PANCHKULA PRIVATE LIMITED.
The source ↗DLF's projects and court recordThe records
What the registers hold for INDEPENDENT FLOORS AT DLF CITY PHASE I & III: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/528/260/2022/03: Registration expired. Ended 14 Feb 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Plans approved, as the developer declared: layout plan 30 Jun 2018, building plans 16 Dec 2021.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Red flag: Registration expired
Ended 14 Feb 2025. HARERA Gurugram, read 4 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 18 HARERA files, with the dates we read them
- Registration no.
- GGM/528/260/2022/03
- Registration valid till
- 14 Feb 2025
- Declared possession
- 14 Feb 2025
Declared by the promoter to HARERA
- Land area
- 0.8964 (Acre) (3,627.6 sq m)
- FAR
- 2.46 proposed of 2.46 permissible
- licence
- Since the development of the Independent Floors is being undertaken on Plot basis, in a licensed Colony, all the conditions of Policy of Independent Floors in State of Haryana as amended from time to time are applicable and are complied with. Services and allied external infrastructure have been laid out for the entire licensed area of residential plotted colony i.e. DLF City Phase I and DLF City Phase III, in which the plots fall.
- Estimated project cost
- ₹115.53 crore
- Cost of land
- ₹36.14 crore
- Layout plan, declared approved (field 5a)
- 30 Jun 2018
- Building plans, declared approved
- 16 Dec 2021
- Construction to start
- 15 Feb 2022
- Completion declared for
- 14 Feb 2025
Declared inventory · 11 types
Declared inventory — 11 types declared, first 8 shown
- Apartment/Shops/Other Buildings · 4 units · 188.01 sq m carpet · 1 tower
- Apartment/Shops/Other Buildings · 4 units · 220.85 sq m carpet · 1 tower
- Apartment/Shops/Other Buildings · 4 units · 220.85 sq m carpet · 1 tower
- Apartment/Shops/Other Buildings · 4 units · 219.15 sq m carpet · 1 tower
- Apartment/Shops/Other Buildings · 4 units · 228.63 sq m carpet · 1 tower
- Apartment/Shops/Other Buildings · 4 units · 187.28 sq m carpet · 1 tower
- Apartment/Shops/Other Buildings · 4 units · 125.18 sq m carpet · 1 tower
- Apartment/Shops/Other Buildings · 4 units · 125.97 sq m carpet · 1 tower
Statutory approvals, as declared · 3
Statutory approvals, as declared
- I. ZONING — declared: already been obtained (26 Oct 2016)
- II. LAYOUT PLAN — declared: already been obtained (30 Jun 2018)
- III. BRS-III — declared: already been obtained (16 Dec 2021)
On file with HARERA · 18 files
On file with HARERA (18)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
3 filesServices
Service plans
1 fileApprovals and clearances
Occupation certificate (OC)
1 fileDTCP licence
1 fileLand records
Land records
1 fileMoney
Accounts and finance
3 filesThe promoter’s papers
Declarations and affidavits
1 fileOther filings
Other filings
3 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
The promoter declared Since the development of the Independent Floors is being undertaken on Plot basis, in a licensed Colony, all the conditions of Policy of Independent Floors in State of Haryana as amended from time to time are applicable and are complied with. Services and allied external infrastructure have been laid out for the entire licensed area of residential plotted colony i.e. DLF City Phase I and DLF City Phase III, in which the plots fall.. We could not read a licence number from that, so nothing is claimed about it here.
declared in the registration application (Form REP-I), Gurugram bench · submitted 8 Dec 2021 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
3 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (18 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1804 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on DLF
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.