Skip to content

INDEPENDENT FLOORS AT DLF CITY PHASE IV

by DLF Home Developers · Gurugram

Not on our price list yet

Possession 14 Nov 2024 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Registered by
DLF HOME DEVELOPERS LIMITEDthe company that filed it, for DLF Home Developers
Timeline
  1. 30 Apr 2008Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 10 Sep 2021Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 14 Nov 2024Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside0.831 acres in all, by use
  • Apartment buildings0.831 acres · 100%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningVRV system in living, dining & bedrooms with high wall units
  • KitchenWhite WASH / OBD
  • Kitchen appliancesModular kitchen with hob, chimmney, oven, microwave, dishwasher, refrigerator, washing machine at balcony
  • LiftsBranded make
  • WardrobesModular wardrobes of standard make in bedrooms (except in S. room)
  • FloorsIPS flooring / tiles / marble / granite
  • WallsWhite WASH / OBD
  • WindowsMS or AL

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: DLF CITY PHASE IV, GURUGRAM, HARYANA

The builder

Its 11 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 7
  • Registered, no OC or CC yet: 4

Questions buyers ask

Is INDEPENDENT FLOORS AT DLF CITY PHASE IV registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/483/215/2021/51. Ended 14 Nov 2024. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for INDEPENDENT FLOORS AT DLF CITY PHASE IV?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 14 Nov 2024. Its registration runs to 14 Nov 2024; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around INDEPENDENT FLOORS AT DLF CITY PHASE IV?From the records · HARERA, read 4 Nov 2026

INDEPENDENT FLOORS AT DLF CITY PHASE IV is in Gurugram; the site address declared to HARERA is Dlf City Phase Iv, Gurugram, Haryana. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building INDEPENDENT FLOORS AT DLF CITY PHASE IV?From the records · HARERA, read 4 Nov 2026

INDEPENDENT FLOORS AT DLF CITY PHASE IV is a DLF Home Developers project, registered by its company DLF HOME DEVELOPERS LIMITED.

The source ↗DLF Home Developers's projects and court record

The records

What the registers hold for INDEPENDENT FLOORS AT DLF CITY PHASE IV: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/483/215/2021/51: Registration expired. Ended 14 Nov 2024.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Plans approved, as the developer declared: layout plan 30 Apr 2008, building plans 10 Sep 2021.Declared to HARERA, read 29 Oct 2026
The court record of DLF Home Developers’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 14 Nov 2024. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 15 HARERA files, with the dates we read them
Registration no.
GGM/483/215/2021/51
Registration valid till
14 Nov 2024
Declared possession
14 Nov 2024

Declared by the promoter to HARERA

Land area
0.8314 (Acre) (3,364.56 sq m)
FAR
2.42 proposed
licence
Since the development of the Independent Floors is being undertaken on Plot basis, in a licensed Colony, all the conditions of Policy of Independent Floors in State of Haryana as amended from time to time are applicable and are complied with. Services and allied external infrastructure have been laid out for the entire licensed area of residential plotted colony i.e. DLF City Phase IV, in which the plots fall.
Estimated project cost
₹101.64 crore
Cost of land
₹17.83 crore
Layout plan, declared approved (field 5a)
30 Apr 2008
Building plans, declared approved
10 Sept 2021
Construction to start
15 Nov 2021
Completion declared for
14 Nov 2024
Declared inventory · 11 types

Declared inventory — 11 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 4 units · 125.77 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 156.6 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 187.54 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 156.85 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 143.77 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 143.77 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 143.77 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 152.91 sq m carpet · 1 tower
Statutory approvals, as declared · 2

Statutory approvals, as declared

  • I. ZONING — declared: already been obtained (26 Oct 2016)
  • II. LAYOUT PLAN / DEMARCATION PLAN (APRIL 2008) — declared: already been obtained
On file with HARERA · 15 files

On file with HARERA (15)

Plans

Site plan

1 file
Approved Site Plan11 Aug 2021

Layout plan

1 file
Latest Layout Plan11 Aug 2021

Zoning plan

1 file
Zoning Plan11 Aug 2021

Demarcation plan

1 file
Demarcation Plan11 Aug 2021

Building plans

3 files
Approved Building Plans, Full Set15 Sept 2021Building Plans-110 Sept 2021Building Plans-210 Sept 2021

Services

Service plans

1 file
Service Plans on the Layout17 Aug 2021

Approvals and clearances

Occupation certificate (OC)

1 file
OC uploaded2 Jun 2025

DTCP licence

1 file
Licence Copy with Land Schedule8 Sept 2021

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration17 Aug 2021

Money

Accounts and finance

3 files
CA Certificate on the Application’s Figures15 Sept 2021Cash Flow Statement15 Sept 2021Non-Default Certificate from a CA15 Sept 2021

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit16 Aug 2021

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared Since the development of the Independent Floors is being undertaken on Plot basis, in a licensed Colony, all the conditions of Policy of Independent Floors in State of Haryana as amended from time to time are applicable and are complied with. Services and allied external infrastructure have been laid out for the entire licensed area of residential plotted colony i.e. DLF City Phase IV, in which the plots fall.. We could not read a licence number from that, so nothing is claimed about it here.

declared in the registration application (Form REP-I), Gurugram bench · submitted 20 Aug 2021 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan11 Aug 2021

Layout plan

1 file
Latest Layout Plan11 Aug 2021

Building plans

3 files
Approved Building Plans, Full Set15 Sept 2021Building Plans-110 Sept 2021Building Plans-210 Sept 2021

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (15 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1674 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on DLF Home Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.