INFINITY
by Pyramid Dream Homes · Sector 70, Gurugram-Manesar
Not on our price list yet
Possession 24 Sep 2025 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 70, Gurugram-Manesar2.9 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
- Registered by
- PYRAMID DREAM HOMES LLPthe company that filed it, for Pyramid Dream Homes
- 7 Jan 2021Building plans approveddeclared to HARERA, read 5 Nov 2026
- 24 Sep 2025Possession, as declareddeclared to HARERA, read 5 Nov 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- Under 1,000 sq ft315–645 sq ft684
Carpet area per home, as declared to HARERA (read 5 Nov 2026), in sq ft.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Parking8,236 m² · 47%
- Parks and playgrounds4,113 m² · 23%
- Apartment buildings2,409 m² · 14%
- Roads1,447 m² · 8%
- Other usesas the form names them: Area, Rain700 m² · 4%
- Electricity sub-station425 m² · 2%
- Club house197 m² · 1%
- Sewage and waste treatment26 m² · under 1%
The land-use table of the HARERA application, declared to HARERA, read 5 Nov 2026. The share is of the land the table itemises.
- KitchenStone counter with tile
- FloorsI PS flooring
- WallsOBD paint
- BathroomsPVC
- WindowsGlass panels
- Main doorSKIN door
- Water storageOver HEAD tank
The developer’s specifications in the HARERA application, declared to HARERA, read 5 Nov 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Sohna Elevated Corridor (NH-248A)2.9 km
- Dwarka ExpresswayOpen, 17 Aug 20253.3 km
- Delhi–Gurugram–SNB RRTS3.3 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 1
- Other register states: 2
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
No photo of the project on file yet | Pyramid Dream Homes | 0.3 km | — | — | 24 May 2020 |
NATURE VALLEYNo photo on file yet | Bnb Colonizer | 0.4 km | — | — | 12 May 2027 |
SEGGOVIASNo photo on file yet | Subh Housing (Gurgaon) | 0.5 km | — | — | 30 Jun 2032 |
No photo of the project on file yet | Pyramid Infratech | 0.5 km | — | — | 16 May 2023 |
THE RESIDENCES THREE SIXTYNo photo on file yet | Capital Heights | 0.6 kmto its sector’s point | — | — | 31 Dec 2025 |
No photo of the project on file yet | Countrywide Promoters | 0.6 kmto its sector’s point | — | — | 27 Aug 2026 |
| Countrywide Promoters | 0.6 kmto its sector’s point | — | — | 30 Jun 2022 | |
| BPTP | 0.6 kmto its sector’s point | — | — | 31 Dec 2032 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is INFINITY registered with HARERA?From the records · HARERA, read 5 Nov 2026
HARERA lists it as GGM/436/168/2021/04. The register’s record shows an end date of 24 Sep 2025. The register shows it as: Registration lapsed.
The source ↗What is the possession timeline for INFINITY?From the records · HARERA, read 5 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 24 Sep 2025. Its registration runs to 24 Sep 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around INFINITY?From the records · Map pin and road lines, read 6 Sep 2026
INFINITY is in Sector 70, Gurugram-Manesar; the site address declared to HARERA is Village Badshahpur, Sector-70. In a straight line it is about 2.9 km from Sohna Elevated Corridor (NH-248A), 3.3 km from Dwarka Expressway and 3.3 km from Delhi–Gurugram–SNB RRTS.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building INFINITY?From the records · HARERA, read 5 Nov 2026
INFINITY is a Pyramid Dream Homes project, registered by its company PYRAMID DREAM HOMES LLP.
The source ↗Pyramid Dream Homes's projects and court recordThe records
What the registers hold for INFINITY: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/436/168/2021/04: Registration lapsed. The register’s record shows an end date of 24 Sep 2025.HARERA, read 5 Nov 2026 · See it on HARERA ↗
- Land licence 26 OF 2020 is on the DTCP register: Licence lapsed; the register prints its validity to 24 Sep 2026.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: building plans 7 Jan 2021.Declared to HARERA, read 5 Nov 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 51 HARERA files, with the dates we read them
- Registration no.
- GGM/436/168/2021/04
- Registration valid till
- 24 Sept 2025
- Declared possession
- 24 Sept 2025
Declared by the promoter to HARERA
- Land area
- 4.3375 (Acre) (17,553.24 sq m)
- FAR
- the application prints 237, which is not a ratio
- licence
- 26 of 2020 dated 25.09.2020
- Estimated project cost
- ₹139.38 crore
- Cost of land
- ₹13.64 crore
- Building plans, declared approved
- 7 Jan 2021
- Construction to start
- 15 Apr 2021
- Completion declared for
- 24 Sept 2025
Declared inventory · 5 types
Declared inventory
- Apartment/Shops/Other Buildings · 232 units · 59.797 sq m carpet · 4 towers · one flat
- Apartment/Shops/Other Buildings · 240 units · 59.946 sq m carpet · 4 towers · one flat
- Apartment/Shops/Other Buildings · 104 units · 29.222 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 54 units · 31.319 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 54 units · 31.812 sq m carpet · 2 towers · one flat
Statutory approvals, as declared · 5
Statutory approvals, as declared
- I. LICENSE — declared: already been obtained (25 Sept 2020)
- II. ZONING PLAN — declared: already been obtained (25 Sept 2020)
- III. BUILDING PLAN — declared: already been obtained (7 Jan 2021)
- IV. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (30 Jun 2020)
- V. FOREST NOC — declared: already been obtained (17 Jun 2020)
On file with HARERA · 51 files
On file with HARERA (51)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
3 filesServices
Service plans
1 fileApprovals and clearances
DTCP licence
1 fileEnvironment clearance
1 fileFire safety
1 fileOther NOCs and clearances
5 filesLand records
Land records
6 filesSales papers
Payment plan
1 fileAllotment and sale agreements
6 filesMoney
Accounts and finance
10 filesTimeline and progress
Construction schedule
1 fileThe promoter’s papers
Declarations and affidavits
5 filesCompany papers
5 filesOther filings
Other filings
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
26 OF 2020 · Pyramid Dream Homes LLP · GURGAON-MANESAR
Licence valid to 24 Sept 2026
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 11 Jan 2021 · read 5 Nov 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 5 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
26 OF 2020: 11 parcels, 4.3375 acres in all, in Palda (hadbast 164), tehsil Badshahpur.
The licence register prints the same licensed area, 4.3375 acres.
- 6//138 kanal
- 6//14/2min4 kanal 19 marla
- 6//15/1/21 kanal 3 marla
- 6//15/2/116 marla
Show the other 7 parcels
- 6//16/1/1/31 kanal 14 marla
- 6//16/1/21 kanal
- 6//16/2/112 marla
- 6//17/13 kanal 11 marla
- 6//17/24 kanal 9 marla
- 6//25/1/110 marla
- 6//88 kanal
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Palda (hadbast 164), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 6//13.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
Collector rate
No one collector rate can be matched to this project's type. See the collector rates for Sector 70.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
3 filesPayment plan
1 fileAmong the uploads Bhumiq read from HARERA's page on 5 Nov 2026 (51 in all), none is a floor plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1526 · read 5 Nov 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Pyramid Dream Homes
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.