INFINITY

by Pyramid Dream Homes · Sector 70, Gurugram-Manesar

Not on our price list yet

Possession 24 Sep 2025 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 70, Gurugram-Manesar2.9 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
Carpet area
315–645 sq ft
In m²about 29–60 m², as declared
Registered by
PYRAMID DREAM HOMES LLPthe company that filed it, for Pyramid Dream Homes
Timeline
  1. 7 Jan 2021Building plans approveddeclared to HARERA, read 5 Nov 2026
  2. 24 Sep 2025Possession, as declareddeclared to HARERA, read 5 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

684homes, 315 to 645 sq ft of carpet area
  • Under 1,000 sq ft315–645 sq ft684

Carpet area per home, as declared to HARERA (read 5 Nov 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside17,553 m² in all, by use
  • Parking8,236 m² · 47%
  • Parks and playgrounds4,113 m² · 23%
  • Apartment buildings2,409 m² · 14%
  • Roads1,447 m² · 8%
  • Other usesas the form names them: Area, Rain700 m² · 4%
  • Electricity sub-station425 m² · 2%
  • Club house197 m² · 1%
  • Sewage and waste treatment26 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 5 Nov 2026. The share is of the land the table itemises.

In each home
  • KitchenStone counter with tile
  • FloorsI PS flooring
  • WallsOBD paint
  • BathroomsPVC
  • WindowsGlass panels
  • Main doorSKIN door
  • Water storageOver HEAD tank

The developer’s specifications in the HARERA application, declared to HARERA, read 5 Nov 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 70, Gurugram-ManesarThe licensed land, as mapped by DTCP (read 5 Nov 2026) · tcpharyana.gov.inOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)2.9 km
  • Dwarka ExpresswayOpen, 17 Aug 20253.3 km
  • Delhi–Gurugram–SNB RRTS3.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Other register states: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is INFINITY registered with HARERA?From the records · HARERA, read 5 Nov 2026

HARERA lists it as GGM/436/168/2021/04. The register’s record shows an end date of 24 Sep 2025. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for INFINITY?From the records · HARERA, read 5 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 24 Sep 2025. Its registration runs to 24 Sep 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around INFINITY?From the records · Map pin and road lines, read 6 Sep 2026

INFINITY is in Sector 70, Gurugram-Manesar; the site address declared to HARERA is Village Badshahpur, Sector-70. In a straight line it is about 2.9 km from Sohna Elevated Corridor (NH-248A), 3.3 km from Dwarka Expressway and 3.3 km from Delhi–Gurugram–SNB RRTS.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building INFINITY?From the records · HARERA, read 5 Nov 2026

INFINITY is a Pyramid Dream Homes project, registered by its company PYRAMID DREAM HOMES LLP.

The source ↗Pyramid Dream Homes's projects and court record

The records

What the registers hold for INFINITY: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/436/168/2021/04: Registration lapsed. The register’s record shows an end date of 24 Sep 2025.HARERA, read 5 Nov 2026 · See it on HARERA ↗
  • Land licence 26 OF 2020 is on the DTCP register: Licence lapsed; the register prints its validity to 24 Sep 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 7 Jan 2021.Declared to HARERA, read 5 Nov 2026
The court record of Pyramid Dream Homes’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 26 OF 2020 lapsed

    Named in this project’s application. Valid to 24 Sep 2026; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 24 Sep 2025. HARERA Gurugram, read 5 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 51 HARERA files, with the dates we read them
Registration no.
GGM/436/168/2021/04
Registration valid till
24 Sept 2025
Declared possession
24 Sept 2025

Declared by the promoter to HARERA

Land area
4.3375 (Acre) (17,553.24 sq m)
FAR
the application prints 237, which is not a ratio
licence
26 of 2020 dated 25.09.2020
Estimated project cost
₹139.38 crore
Cost of land
₹13.64 crore
Building plans, declared approved
7 Jan 2021
Construction to start
15 Apr 2021
Completion declared for
24 Sept 2025
Declared inventory · 5 types

Declared inventory

  • Apartment/Shops/Other Buildings · 232 units · 59.797 sq m carpet · 4 towers · one flat
  • Apartment/Shops/Other Buildings · 240 units · 59.946 sq m carpet · 4 towers · one flat
  • Apartment/Shops/Other Buildings · 104 units · 29.222 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 54 units · 31.319 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 54 units · 31.812 sq m carpet · 2 towers · one flat
Statutory approvals, as declared · 5

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (25 Sept 2020)
  • II. ZONING PLAN — declared: already been obtained (25 Sept 2020)
  • III. BUILDING PLAN — declared: already been obtained (7 Jan 2021)
  • IV. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (30 Jun 2020)
  • V. FOREST NOC — declared: already been obtained (17 Jun 2020)
On file with HARERA · 51 files

On file with HARERA (51)

Plans

Site plan

1 file
Approved Site Plan11 Jan 2021

Layout plan

1 file
Latest Layout Plan11 Jan 2021

Zoning plan

1 file
Zoning Plan11 Jan 2021

Demarcation plan

1 file
Demarcation Plan11 Jan 2021

Building plans

3 files
BR III11 Jan 2021Approved Building Plans, Full Set11 Jan 2021Address Proof of Firm11 Jan 2021

Services

Service plans

1 file
Service Plans on the Layout11 Jan 2021

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule11 Jan 2021

Environment clearance

1 file
EC Acknowledgement Slip11 Jan 2021

Fire safety

1 file
Fire Acknowledgement Slip11 Jan 2021

Other NOCs and clearances

5 files
NOC DHBVN11 Jan 2021Forest NOC11 Jan 2021HUDA Constrution Water NOC11 Jan 2021

Land records

Land records

6 files
Sale Deed11 Jan 2021Revenue Record Entry of Licence and Collaboration11 Jan 2021Mutation11 Jan 2021

Sales papers

Payment plan

1 file
Payment Plan11 Jan 2021

Allotment and sale agreements

6 files
Allotment Letter Residential11 Jan 2021Allotment Letter Commercial11 Jan 2021BBA Residential11 Jan 2021

Money

Accounts and finance

10 files
Cash Flow Statement11 Jan 2021ITR11 Jan 2021Project Report11 Jan 2021

Timeline and progress

Construction schedule

1 file
PERT Chart11 Jan 2021

The promoter’s papers

Declarations and affidavits

5 files
Affidavit of Promoters11 Jan 2021Tree Cutting Affidavit11 Jan 2021Application Form Residential11 Jan 2021

Company papers

5 files
ROC Form11 Jan 2021Copy of GST11 Jan 2021ROC Challan11 Jan 2021

Other filings

Other filings

1 file
Repayment Schedule11 Jan 2021

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

26 OF 2020 · Pyramid Dream Homes LLP · GURGAON-MANESAR

Licence valid to 24 Sept 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 11 Jan 2021 · read 5 Nov 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 5 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

26 OF 2020: 11 parcels, 4.3375 acres in all, in Palda (hadbast 164), tehsil Badshahpur.

The licence register prints the same licensed area, 4.3375 acres.

  • 6//138 kanal
  • 6//14/2min4 kanal 19 marla
  • 6//15/1/21 kanal 3 marla
  • 6//15/2/116 marla
Show the other 7 parcels
  • 6//16/1/1/31 kanal 14 marla
  • 6//16/1/21 kanal
  • 6//16/2/112 marla
  • 6//17/13 kanal 11 marla
  • 6//17/24 kanal 9 marla
  • 6//25/1/110 marla
  • 6//88 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Palda (hadbast 164), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 6//13.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type. See the collector rates for Sector 70.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan11 Jan 2021

Layout plan

1 file
Latest Layout Plan11 Jan 2021

Building plans

3 files
BR III11 Jan 2021Approved Building Plans, Full Set11 Jan 2021Address Proof of Firm11 Jan 2021

Payment plan

1 file
Payment Plan11 Jan 2021

Among the uploads Bhumiq read from HARERA's page on 5 Nov 2026 (51 in all), none is a floor plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1526 · read 5 Nov 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Pyramid Dream Homes

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.