JBB GRAND (TOWER T4)

by Jbb Infrastructures · Karnal

Not on our price list yet

About this project

Key facts

Carpet area
1,441 sq ft
In m²about 134–134 m², as declared
Registered by
M/S JBB INFRASTRUCTURES PVT LTDthe company that filed it, for Jbb Infrastructures
Timeline
  1. 6 Sep 2024Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Sep 2029Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

33homes, 1,441 to 1,441 sq ft of carpet area
  • 1,000–1,500 sq ft1,441 sq ft33

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside695 m² in all, by use
  • Apartment buildings695 m² · 100%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningOn demand
  • KitchenModular kitchen
  • Kitchen appliancesModular kitchen
  • LiftsBranded
  • WardrobesYes
  • FloorsTile
  • WallsEmulsion paint
  • BathroomsJaguar

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR 35 KARNAL

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 1

Questions buyers ask

Is JBB GRAND (TOWER T4) registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as HRERA-PKL-KRL-650-2025. Valid to 30 Sep 2029.

The source ↗
How is the connectivity around JBB GRAND (TOWER T4)?From the records · HARERA, read 4 Nov 2026

JBB GRAND (TOWER T4) is in Karnal; the site address declared to HARERA is Sector 35 Karnal. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building JBB GRAND (TOWER T4)?From the records · HARERA, read 4 Nov 2026

JBB GRAND (TOWER T4) is a Jbb Infrastructures project, registered by its company M/S JBB INFRASTRUCTURES PVT LTD.

The source ↗Jbb Infrastructures's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for JBB GRAND (TOWER T4): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration HRERA-PKL-KRL-650-2025: Registered. Valid to 30 Sep 2029.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 95 OF 2008 is on the DTCP register: Licence lapsed; the register prints its validity to 11 May 2023.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 6 Sep 2024, building plans 6 Sep 2024.Declared to HARERA, read 29 Oct 2026
The court record of Jbb Infrastructures’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 95 OF 2008 lapsed

    Named in this project’s application. Valid to 11 May 2023; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 5 HARERA files, with the dates we read them
Registration no.
HRERA-PKL-KRL-650-2025
Registration valid till
30 Sept 2029

Declared by the promoter to HARERA

Land area
695.487 (Sqr/mtrs)
FAR
1.74 proposed of 1.75 permissible
licence
LICENSE NO. 95 OF 2008 DATED 12.05.2008 VALID UPTO 11.05.2028 ISSUED BY TOWN AND COUNTRY PLANNING DEPARTMENT HARYANA
Estimated project cost
₹21.98 crore
Cost of land
₹3.80 crore
Layout plan, declared approved (field 5a)
6 Sept 2024
Building plans, declared approved
6 Sept 2024
Declared inventory · 1 type

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type 4 BHK APARTMENTS · 33 units · 133.88 sq m carpet · one flat
Statutory approvals, as declared · 1

Statutory approvals, as declared

  • I. LICENSE NO 95 OF 2008 — declared: already been obtained (12 May 2008)
On file with HARERA · 5 files

On file with HARERA (5)

Plans

Site plan

1 file
Approved Site Plan13 Dec 2024

Layout plan

1 file
Latest Layout Plan13 Dec 2024

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule13 Dec 2024

Money

Accounts and finance

1 file
Non-Default Certificate from a CA13 Dec 2024

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit13 Dec 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

95 OF 2008 · JBB Infrastructure · Karnal

Licence valid to 11 May 2023

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Panchkula bench · submitted 15 Dec 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/1 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

95 OF 2008: 4 parcels, 5 acres in all, in Karnal (hadbast 1), tehsil Karnal.

The licence register prints the same licensed area, 5 acres.

  • rectangle 8420, kila 84204 bigha 17 biswa
  • rectangle 8421, kila 84215 bigha 3 biswa
  • rectangle 8423, kila 84234 bigha 13 biswa
  • rectangle 8424, kila 84249 bigha 7 biswa

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Karnal, then the tehsil and the village: Karnal (hadbast 1), tehsil Karnal. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as rectangle 8420, kila 8420.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan13 Dec 2024

Layout plan

1 file
Latest Layout Plan13 Dec 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (5 in all), none is a building plan, a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3243 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Jbb Infrastructures

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Panchkula records showed the facts above. Statuses change. Verify at the portal for transactions.