LA VIDA PHASE 2

by Sector 113 Gatevida Developers · Gurugram

Not on our price list yet

Possession 31 Aug 2027 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Carpet area
796–1,493 sq ft
In m²about 74–139 m², as declared
Registered by
SECTOR 113 GATEVIDA DEVELOPERS PRIVATE LTDthe company that filed it, for Sector 113 Gatevida Developers
Timeline
  1. 24 Feb 2016Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 3 Jun 2016Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 11 Aug 2027Registration valid toHARERA, read 4 Nov 2026
  4. 31 Aug 2027Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

277homes, 796 to 1,493 sq ft of carpet area
  • Under 1,000 sq ft796–951 sq ft79
  • 1,000–1,500 sq ft1,216–1,493 sq ft198

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 6 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside25,010 m² in all, by use
  • Other usesas the form names them: Rain water harvesting, Circulation road, Shopping area, Electrical supply system, Area under commercial units18,649 m² · 75%
  • Roads2,513 m² · 10%
  • Parking1,850 m² · 7%
  • Apartment buildings1,414 m² · 6%
  • Electricity sub-station418 m² · 2%
  • Parks and playgrounds166 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningTower a1 and a2: split AC in living /dining only B6 tower : electrical point only
  • KitchenTower a1 and a2: vitrified tile flooring and ceramic tile cladding 600MM above counter, counter with granite counter, with stainless steel sink with single bowl drain board B6 tower : vitrified tile flooring and ceramic tile cladding 600MM above counter, counter with granite counter, with stainless steel sink with single bowl drain board
  • Kitchen appliancesTower a1 and a2: NIL B6 tower : NIL
  • LiftsTower a1 and a2: 2 passenger and 1 service lift B6 tower : 1 passenger and 1 service lift
  • WardrobesTower a1 and a2: NIL B6 tower : NIL
  • FloorsTower a1 and a2: stone flooring in living/dining, engineered wooden in master bedroom, vitrified tile in other bedrooms & kitchen. vitrified tiles in toilets and balconies B6 tower : vitrified tile flooring in all areas , antiskid ceramic tiles in toilets and balconies, ceramic tiles in toilet areas (IF applicable)
  • WallsTower a1 and a2: paint B6 tower : paint
  • BathroomsTower a1 and a2: branded CP fittings and sanitary WARE B6 tower : branded CP fittings and sanitary WARE

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR 112/113 , VILLAGE BAJGHERA, GURUGRAM

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 1

Questions buyers ask

Is LA VIDA PHASE 2 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/639/371/2022/114. Valid to 11 Aug 2027.

The source ↗
What is the possession timeline for LA VIDA PHASE 2?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Aug 2027. Its registration runs to 11 Aug 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around LA VIDA PHASE 2?From the records · HARERA, read 4 Nov 2026

LA VIDA PHASE 2 is in Gurugram; the site address declared to HARERA is Sector 112/113 , Village Bajghera, Gurugram. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building LA VIDA PHASE 2?From the records · HARERA, read 4 Nov 2026

LA VIDA PHASE 2 is a Sector 113 Gatevida Developers project, registered by its company SECTOR 113 GATEVIDA DEVELOPERS PRIVATE LTD.

The source ↗Sector 113 Gatevida Developers's projects and court record

The records

What the registers hold for LA VIDA PHASE 2: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/639/371/2022/114: Registered. Valid to 11 Aug 2027.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 85 OF 2012 is on the DTCP register: Licence lapsed; the register prints its validity to 28 Aug 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 24 Feb 2016, building plans 3 Jun 2016.Declared to HARERA, read 29 Oct 2026
The court record of Sector 113 Gatevida Developers’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 85 OF 2012 lapsed

    Named in this project’s application. Valid to 28 Aug 2026; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Red flag: Licence 86 OF 2012 lapsed

    Named in this project’s application. Valid to 28 Aug 2026; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Licence 105 OF 2011 ends soon

    Named in this project’s application. Valid to 10 Dec 2026. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 43 HARERA files, with the dates we read them
Registration no.
GGM/639/371/2022/114
Registration valid till
11 Aug 2027
Declared possession
31 Aug 2027

Declared by the promoter to HARERA

Land area
6.18 (Acre) (25,009.57 sq m)
FAR
1.73 proposed of 1.75 permissible
licence
105 of 2011(10-12-2024), 85 of 2012(28-08-2025), 86 of 2012(28-08-2025)
Estimated project cost
₹631.01 crore
Cost of land
₹88.44 crore
Layout plan, declared approved (field 5a)
24 Feb 2016
Building plans, declared approved
3 Jun 2016
Construction to start
13 Dec 2018
Completion declared for
31 Aug 2027
Declared inventory · 9 types

Declared inventory — 9 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 27 units · 73.907 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 28 units · 75.255 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 12 units · 83.985 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 12 units · 88.39 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 150 units · 112.947 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 48 units · 138.738 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 2 units · 18.1 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 2 units · 17.48 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 5

Statutory approvals, as declared

  • I. APPROVAL FROM AAI — declared: already been obtained (27 Jun 2019)
  • II. APPROVAL OF DEMARCATION PLAN — declared: already been obtained (20 Jun 2012)
  • III. PERMISSION FOR JOINT DEVELOPMENT — declared: already been obtained (30 Jul 2012)
  • IV. CTE — declared: already been obtained (13 Oct 2020)
  • V. ENVIRONMENT CLEARANCE - MOEF — declared: already been obtained (15 Sept 2016)
On file with HARERA · 43 files

On file with HARERA (43)

Plans

Site plan

1 file
Approved Site Plan28 Dec 2022

Layout plan

1 file
Latest Layout Plan28 Dec 2022

Zoning plan

1 file
Zoning Plan28 Dec 2022

Demarcation plan

1 file
Demarcation Plan28 Dec 2022

Building plans

17 files
Elevation 1 Tower A228 Dec 2022Floor Plan Typical 20th to Terrace -A1 & A228 Dec 2022Elevation 2 Tower A228 Dec 2022

Floor plans

7 files
Floor Plan Typical 1st to 19th - A1 & A228 Dec 2022Parking Plan- Lower Basement28 Dec 2022Parking Plan - Upper Basement28 Dec 2022

Services

Sewerage and drainage

2 files
Sewerage Plan28 Dec 2022Storm Water Drainage Plan28 Dec 2022

Water supply

1 file
Water Supply Plan28 Dec 2022

Electricity

2 files
Electricity Supply Plan28 Dec 2022Street Light Plan28 Dec 2022

Roads

1 file
Roads & Pavement Plan28 Dec 2022

Service plans

1 file
Service Plans on the Layout28 Dec 2022

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule28 Dec 2022

Environment clearance

1 file
Environment Clearance Approval28 Dec 2022

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration28 Dec 2022

Money

Accounts and finance

3 files
Cash Flow Statement24 Aug 2022CA Certificate on the Application’s Figures18 Aug 2022Non-Default Certificate from a CA18 Aug 2022

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit28 Dec 2022

Other filings

Other filings

1 file
Land Scaping Plan28 Dec 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 3 DTCP licences named on the application

105 OF 2011 · CSN Estates · GURGAON-MANESAR

Licence valid to 10 Dec 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

85 OF 2012 · CSN Estates (P) Ltd. · GURGAON-MANESAR

Licence valid to 28 Aug 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

86 OF 2012 · CSN Estates (P) Ltd. · GURGAON-MANESAR

Licence valid to 28 Aug 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 24 Aug 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 3 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

105 OF 2011: 25 parcels, 10.175 acres in all, in Bajghera (hadbast 61), tehsil Gurgaon.

The licence register prints the same licensed area, 10.18 acres.

  • 15//24/25 kanal 5 marla
  • 16//19/31 kanal 17 marla
  • 16//217 kanal 7 marla
  • 16//22/11 kanal 13 marla
Show the other 21 parcels
  • 16//22/22 kanal
  • 19//1/15 kanal 7 marla
  • 19//1/22 kanal 13 marla
  • 19//10/214 marla
  • 19//10/35 kanal 10 marla
  • 19//11/29 marla
  • 19//2/19 marla
  • 19//2/24 kanal 7 marla
  • 19//2/32 kanal 1 marla
  • 19//9/14 kanal 18 marla
  • 20//2911 marla
  • 20//4/21 kanal 19 marla
  • 20//5/22 kanal 13 marla
  • 20//67 kanal 7 marla
  • 20//74 kanal 4 marla
  • 20//285 marla
  • 20//4/14 kanal 10 marla
  • 20//5/15 kanal 7 marla
  • 15//257 kanal 7 marla
  • 16//22/3/11 kanal 10 marla
  • 16//22/3/21 kanal 5 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

85 OF 2012: 27 parcels, 8.875 acres in all, in Bajghera (hadbast 61), tehsil Gurgaon.

The licence register prints the same licensed area, 8.88 acres.

  • 20//11/2/21 marla
  • 20//12/25 kanal 19 marla
  • 20//13/17 kanal 7 marla
  • 20//13/213 marla
Show the other 23 parcels
  • 20//14/11 kanal 18 marla
  • 20//14/26 marla
  • 20//173 kanal 18 marla
  • 20//18/17 kanal 3 marla
  • 20//18/22 marla
  • 20//197 kanal 15 marla
  • 20//20/27 marla
  • 20//21/1/24 kanal 7 marla
  • 20//22/14 kanal 4 marla
  • 20//22/23 kanal 16 marla
  • 20//23/1/115 marla
  • 20//23/1/25 marla
  • 20//23/36 kanal 12 marla
  • 20//244 kanal 4 marla
  • 20//309 marla
  • 20//315 marla
  • 20//328 marla
  • 20//8/4/21 kanal 14 marla
  • 20//9/118 marla
  • 20//225/2262 kanal 15 marla
  • 20//247/11 kanal 9 marla
  • 21//25/3/23 marla
  • 31//2/13 kanal 7 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

86 OF 2012: 4 parcels, 1.9937 acres in all, in Bajghera (hadbast 61), tehsil Gurgaon.

The licence register prints the same licensed area, 1.99 acres.

  • 19//11/18 marla
  • 19//20/26 marla
  • 20//159 kanal 3 marla
  • 20//16/16 kanal 2 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Bajghera (hadbast 61), tehsil Gurgaon. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 15//24/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan28 Dec 2022

Layout plan

1 file
Latest Layout Plan28 Dec 2022

Building plans

17 files
Elevation 1 Tower A228 Dec 2022Floor Plan Typical 20th to Terrace -A1 & A228 Dec 2022Elevation 2 Tower A228 Dec 2022Elevation 2 Tower A128 Dec 2022Approved Building Plans, Full Set28 Dec 2022Elevation 1 Tower A128 Dec 2022

Floor plans

7 files
Floor Plan Typical 1st to 19th - A1 & A228 Dec 2022Parking Plan- Lower Basement28 Dec 2022Parking Plan - Upper Basement28 Dec 2022Parking Plan - Ground28 Dec 2022Floor Plan Typical 12 & 13 - T B628 Dec 2022Floor Plan Typical Gf - T B628 Dec 2022Floor Plan Typical Ground - T A1 & A228 Dec 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (43 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2043 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Sector 113 Gatevida Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.