M3M ANTALYA HILLS PHASE 1

by Loon Land Development · Gurugram

Not on our price list yet

Possession 31 Dec 2025 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Carpet area
about 847 sq ft
In m²about 78.7 m², the average flat, as declared
Registered by
LOON LAND DEVELOPMENT LIMITEDthe company that filed it, for Loon Land Development
Timeline
  1. 29 Nov 2022Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 20 Dec 2022Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 31 Dec 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026
  4. 30 Dec 2026Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside8.711 acres in all, by use
  • Apartment buildings5.215 acres · 60%
  • Roads2.397 acres · 28%
  • Parks and playgrounds0.653 acres · 7%
  • Other uses0.348 acres · 4%
  • Sewage and waste treatment0.098 acres · 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningProvision only
  • KitchenVitrified tiles, plaster and OBD
  • Kitchen appliancesAs per approved make
  • Lifts4 to 6 passenger lifts as per norms
  • WardrobesWooden with laminate/veneer
  • FloorsVitrified tiles/laminate wooden for bedroom ; antiskid ceramic tiles for toilet
  • WallsPlaster and OBD
  • BathroomsAs per approved make

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR 79, GURUGRAM

The builder

Its 9 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 5
  • Other register states: 4

Questions buyers ask

Is M3M ANTALYA HILLS PHASE 1 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/650/382/2022/125. Valid to 30 Dec 2026.

The source ↗
What is the possession timeline for M3M ANTALYA HILLS PHASE 1?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2025. Its registration runs to 30 Dec 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around M3M ANTALYA HILLS PHASE 1?From the records · HARERA, read 4 Nov 2026

M3M ANTALYA HILLS PHASE 1 is in Gurugram; the site address declared to HARERA is Sector 79, Gurugram. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building M3M ANTALYA HILLS PHASE 1?From the records · HARERA, read 4 Nov 2026

M3M ANTALYA HILLS PHASE 1 is a Loon Land Development project, registered by its company LOON LAND DEVELOPMENT LIMITED.

The source ↗Loon Land Development's projects and court record

The records

What the registers hold for M3M ANTALYA HILLS PHASE 1: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/650/382/2022/125: Registered. Valid to 30 Dec 2026.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 194 OF 2022 is on the DTCP register, valid to 28 Nov 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 29 Nov 2022, building plans 20 Dec 2022.Declared to HARERA, read 29 Oct 2026
The court record of Loon Land Development’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration ends soon

    Valid to 30 Dec 2026. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 68 HARERA files, with the dates we read them
Registration no.
GGM/650/382/2022/125
Registration valid till
30 Dec 2026
Declared possession
31 Dec 2025

Declared by the promoter to HARERA

Land area
8.7111 (Acre) (35,252.57 sq m)
FAR
2.61 proposed of 2.64 permissible
licence
194 of 2022 dated 29.11.2022
Estimated project cost
₹388.23 crore
Cost of land
₹88.77 crore
Layout plan, declared approved (field 5a)
29 Nov 2022
Building plans, declared approved
20 Dec 2022
Construction to start
1 Jan 2023
Completion declared for
31 Dec 2025
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 636 units · 50,047.94 sq m carpet · total for 636 flats, about 78.7 m² each
Statutory approvals, as declared · 6

Statutory approvals, as declared

  • I. ENVIRONMENT CLEARANCE — declared: already been obtained (7 Dec 2022)
  • II. FOREST NOC — declared: already been obtained (15 Mar 2022)
  • III. ASSURANCE WATER SUPPLY — declared: already been obtained (11 Nov 2022)
  • IV. ASSURANCE SEWAGE DISPOSAL — declared: already been obtained (27 Oct 2022)
  • V. ASSURANCE STORM WATER DRAINAGE — declared: already been obtained (24 Nov 2022)
  • VI. BUILDING PLAN APPROVAL — declared: already been obtained (20 Dec 2022)
On file with HARERA · 68 files

On file with HARERA (68)

Plans

Site plan

1 file
Approved Site Plan16 Dec 2022

Layout plan

2 files
Superimposed Demarcation on Approved Layout Plan22 Dec 2022Latest Layout Plan20 Dec 2022

Zoning plan

1 file
Zoning Plan16 Dec 2022

Demarcation plan

1 file
Demarcation Plan16 Dec 2022

Building plans

37 files
Briii- All Types23 Dec 2022Approved Building Plan Type-P1020 Dec 2022Approved Building Plan Type-P1120 Dec 2022

Services

Sewerage and drainage

4 files
Storm Water Drainage Layout Plan20 Dec 2022Assurance Storm Water19 Dec 2022Assurance Sewage Connection16 Dec 2022Sewage Layout Plan16 Dec 2022

Water supply

3 files
Assurance Drinking Water16 Dec 2022Assurance Construction Water16 Dec 2022Water Supply Plan16 Dec 2022

Electricity

2 files
Electricity Layout Plan20 Dec 2022Electric Load Assurance16 Dec 2022

Roads

1 file
Road Layout Plan16 Dec 2022

Landscape and green areas

1 file
Landscape Plan16 Dec 2022

Service plans

1 file
Service Plans on the Layout19 Dec 2022

Approvals and clearances

DTCP licence

2 files
Licence Copy with Land Schedule16 Dec 2022LOI16 Dec 2022

Environment clearance

1 file
Environment Clearance16 Dec 2022

Other NOCs and clearances

2 files
Forest NOC16 Dec 2022Aravali NOC16 Dec 2022

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration19 Dec 2022

Money

Accounts and finance

3 files
Cash Flow Statement22 Dec 2022CA Certificate on the Application’s Figures20 Dec 2022Non-Default Certificate from a CA16 Dec 2022

Timeline and progress

Construction schedule

1 file
PERT Chart22 Dec 2022

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit20 Dec 2022

HARERA’s orders

HARERA’s orders

1 file
Extension No. 08 of 2026 dated 07.04.20269 Apr 2026

Other filings

Other filings

2 files
Dtp Mails- All Plot Types23 Dec 2022Dtp Mail23 Dec 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

194 OF 2022 · Loon Land Development Ltd. · GURGAON-MANESAR

Licence valid to 28 Nov 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 20 Dec 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

194 OF 2022: 24 parcels, 8.7111 acres in all, in Nurangpur (hadbast 157), tehsil Manesar.

The licence register prints the same licensed area, 8.7111 acres.

  • 48//25/1/22 kanal 11 marla
  • 48//25/2/21 kanal 14 marla
  • 48//25/31 kanal 7 marla
  • 49//21/32 kanal 3 marla
Show the other 20 parcels
  • 49//21/415 marla
  • 49//21/53 kanal 8 marla
  • 49//24/12 kanal 11 marla
  • 57//1/24 kanal 17 marla
  • 57//10/14 kanal
  • 57//10/12 marla
  • 57//13/1/11 kanal 19 marla 1 sarsai
  • 57//2/22 kanal 12 marla
  • 57//3/12 kanal 19 marla
  • 57//8/34 kanal 3 marla 6 sarsai
  • 58//14/1/27 kanal 9 marla
  • 58//14/21 kanal 1 marla
  • 58//15/12 kanal 10 marla
  • 58//4/2/12 kanal 16 marla
  • 58//5/1/23 kanal 1 marla
  • 58//5/21 kanal 16 marla
  • 58//6/13 kanal 2 marla
  • 58//6/22 kanal 4 marla
  • 58//6/32 kanal 13 marla
  • 58//78 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Nurangpur (hadbast 157), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 48//25/1/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan16 Dec 2022

Layout plan

2 files
Superimposed Demarcation on Approved Layout Plan22 Dec 2022Latest Layout Plan20 Dec 2022

Building plans

37 files
Briii- All Types23 Dec 2022Approved Building Plan Type-P1020 Dec 2022Approved Building Plan Type-P1120 Dec 2022Approved Building Plans, Full Set20 Dec 2022Approved Building Plan Type-P1220 Dec 2022Approved Building Plan Type-A2 (Lcp)19 Dec 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (68 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2254 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Loon Land Development

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.