Skip to content

MAPSKO Mount Ville

by Mapsko Group · Gurugram

Not on our price list yet

About this project

Key facts

Location
Gurugram
Carpet area
862–1,688 sq ft
In m²about 80–157 m², as declared
Registered
23 Oct 2017
Registered by
MAPSKO BUILDERS PVT LTDthe company that filed it, for Mapsko Group
Timeline
  1. 23 Oct 2017Registered with HARERAHARERA, read 4 Nov 2026
  2. 30 Aug 2020Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

756homes, 862 to 1,688 sq ft of carpet area
  • Under 1,000 sq ft862–867 sq ft604
  • 1,000–1,500 sq ft1,071–1,074 sq ft110
  • 1,500–2,000 sq ft1,688 sq ft42

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside62,838 m² in all, by use
  • Other uses24,975 m² · 40%
  • Parks and playgrounds21,462 m² · 34%
  • Roads8,864 m² · 14%
  • Apartment buildings5,649 m² · 9%
  • Electricity sub-station968 m² · 2%
  • Land for community services, handed to the government500 m² · under 1%
  • Club house419 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningAC provide in all bedrooms and living/dining with provision of piping and drain
  • KitchenAntiskid ceramic tiles flooring, ceramic tiles up to 2 FEET above counter & plastic paint in balance area, granite counter, modular kitchen with chimney and HOBB, gas pipeline, CP fittings of grohe / kohler or equivalent, SS single bowl sink with drain board
  • Kitchen appliancesModular kitchen with chimney and HOBB, gas pipeline
  • Lifts2 passenger and 1 service lift in each tower
  • WardrobesWardrobes
  • FloorsItalian/imported marble in living/dining, premium quality laminated wooden flooring in all bedrooms, antiskid ceramic tile in kitchen, terrazzo / ceramic tiles in balconies, terrazzo / ceramic tiles in servant room,
  • WallsPlastic paint with pleasing shades and POP in living/dining, kitchen and all bedrooms, permanent paint finish in balconies, acrylic emulsion paint in servant room
  • BathroomsAntiskid ceramic tiles flooring, granite counter, ceramic tiles TILL 7’0” height, mirror, CP fittings of grohe / kohler or equivalent, premium brand of WC & WASH basin

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR 78-79

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1

Questions buyers ask

Is MAPSKO Mount Ville registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 328 OF 2017, registered on 23 Oct 2017. Ended 30 Aug 2020. The register shows it as: Registration expired.

The source ↗
How is the connectivity around MAPSKO Mount Ville?From the records · HARERA, read 4 Nov 2026

MAPSKO Mount Ville is in Gurugram; the site address declared to HARERA is Sector 78-79. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building MAPSKO Mount Ville?From the records · HARERA, read 4 Nov 2026

MAPSKO Mount Ville is a Mapsko Group project, registered by its company MAPSKO BUILDERS PVT LTD.

The source ↗Mapsko Group's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for MAPSKO Mount Ville: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 328 OF 2017: Registration expired. Ended 30 Aug 2020.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 38 OF 2012 is on the DTCP register: Licence ends soon; the register prints its validity to 21 Apr 2027.DTCP, read 3 Nov 2026
The court record of Mapsko Group’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 30 Aug 2020. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 38 OF 2012 ends soon

    Named in this project’s application. Valid to 21 Apr 2027. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 27 HARERA files, with the dates we read them
Registration no.
328 OF 2017
Registration date
23 Oct 2017
Registration valid till
30 Aug 2020

Declared by the promoter to HARERA

Land area
15.527 (Acre) (62,835.54 sq m)
FAR
1.73 proposed of 1.75 permissible
licence
38 OF 2012
Estimated project cost
₹525.00 crore
Cost of land
₹49.88 crore
Declared inventory · 24 types

Declared inventory — 24 types declared, first 8 shown

  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-D-3BHK+3T · 40 units · 80.258 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-D-3BHK+3T+TERRACE · 8 units · 80.258 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-D-3BHK+3T · 40 units · 80.258 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-D-3BHK+3T+TERRACE · 8 units · 80.258 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-E-3BHK+3T · 34 units · 80.407 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-E-3BHK+3T+TERRACE · 8 units · 80.407 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-E-3BHK+3T · 34 units · 80.407 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-E-3BHK+3T+TERRACE · 8 units · 80.407 sq m carpet · one flat
Statutory approvals, as declared · 12

Statutory approvals, as declared

  • I. CLU/LICENCES — declared: already been obtained (25 Apr 2012)
  • II. LAYOUT PLAN — declared: already been obtained (20 Sept 2012)
  • III. ZONING PLAN — declared: already been obtained (24 Apr 2012)
  • IV. BUILDING PLAN — declared: already been obtained (20 Sept 2012)
  • V. SERVICES PLANS — declared: already been obtained (15 Jul 2014)
  • VI. WATER CONNECTION — declared: already been obtained (27 Dec 2013)
  • VII. APPROVAL OF FIRE-FIGHTING — declared: already been obtained (2 Mar 2013)
  • VIII. ENVIRONMENTAL CLEARANCES — declared: already been obtained (6 Sept 2013)
  • IX. POLLUTION CLEARANCE — declared: already been obtained (1 Mar 2014)
  • X. HEIGHT CLEARANCE BY AAI — declared: already been obtained (19 Apr 2012)
  • XI. RAIN WATER HARVESTING — declared: already been obtained (6 Sept 2016)
  • XII. FORESTS NOC — declared: already been obtained (30 Jan 2013)
On file with HARERA · 27 files

On file with HARERA (27)

Plans

Site plan

1 file
Approved Site Plan25 Nov 2019

Layout plan

1 file
Latest Layout Plan25 Nov 2019

Zoning plan

1 file
Zoning Plan25 Nov 2019

Demarcation plan

1 file
Demarcation Plan25 Nov 2019

Building plans

2 files
BR-III10 Feb 2020Approved Building Plans, Full Set25 Nov 2019

Services

Service plans

3 files
Service Estimate Plans10 Feb 2020Service Plan Approval Letter10 Feb 2020Service Plans on the Layout25 Nov 2019

Approvals and clearances

Occupation certificate (OC)

1 file
OC uploaded27 Sept 2023

DTCP licence

3 files
LOI10 Feb 2020LC IV10 Feb 2020Licence Copy with Land Schedule25 Nov 2019

Environment clearance

1 file
Enviornment Clearance10 Feb 2020

Fire safety

1 file
Fire Scheme Approval10 Feb 2020

Other NOCs and clearances

2 files
Airport Height Clearance10 Feb 2020Forest NOC10 Feb 2020

Land records

Land records

2 files
Encumbrance Certificate10 Feb 2020Revenue Record Entry of Licence and Collaboration25 Nov 2019

Money

Accounts and finance

5 files
Demand Draft Details10 Feb 2020Bank Account Authorized Signatory10 Feb 2020Cash Flow Statement25 Nov 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit10 Feb 2020

HARERA’s orders

HARERA’s orders

1 file
Extension No. 08 OF 2019 DATED-23.12.201928 May 2020

Other filings

Other filings

1 file
Entry Document10 Feb 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

38 OF 2012 · Mapsko Builders Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 21 Apr 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 26 Nov 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

38 OF 2012: 30 parcels, 16.3687 acres in all, in Nurangpur (hadbast 157), tehsil Manesar.

The licence register prints the same licensed area, 16.37 acres.

  • 37//11 min1 kanal 7 marla
  • 37//12 min4 kanal 1 marla
  • 37//13/16 kanal 16 marla
  • 37//13/216 marla
Show the other 26 parcels
  • 37//14/15 kanal 8 marla
  • 37//187 kanal 4 marla
  • 37//197 kanal 11 marla
  • 37//20/12 kanal 5 marla
  • 37//21/24 kanal
  • 37//228 kanal
  • 37//23/16 kanal 7 marla
  • 37//23/21 kanal 5 marla
  • 37//279 marla
  • 37//7 min7 kanal 6 marla
  • 37//8/1/116 marla
  • 37//8/25 kanal 2 marla
  • 48//1/16 kanal 3 marla
  • 48//1/21 kanal 5 marla
  • 48//1/312 marla
  • 48//10/15 kanal 12 marla
  • 48//10/22 kanal 8 marla
  • 48//117 kanal 11 marla
  • 48//137 kanal 12 marla
  • 48//26 kanal 1 marla
  • 48//3/117 marla
  • 48//3/26 kanal 15 marla
  • 48//87 kanal 12 marla
  • 48//97 kanal 12 marla
  • 37//20/11 kanal 11 marla
  • 48//215 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Nurangpur (hadbast 157), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 37//11 min.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Lenders that list this project

  • PNB Housing Finance’s approved-projects list carries “Mapsko Mount Ville”, by Mapsko Builders Private Limited, code NCR-2012-178, approved 2012.

    PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗

A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan25 Nov 2019

Layout plan

1 file
Latest Layout Plan25 Nov 2019

Building plans

2 files
BR-III10 Feb 2020Approved Building Plans, Full Set25 Nov 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (27 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/962 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Mapsko Group

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.