Skip to content

MDS JAI SHRI

by Metadesign Solutions · Gurugram

Not on our price list yet

Possession 4 Jul 2029 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Carpet area
279–1,586 sq ft
In m²about 26–147 m², as declared
Registered by
METADESIGN SOLUTIONS PRIVATE LIMITEDthe company that filed it, for Metadesign Solutions
Timeline
  1. 5 Jul 2024Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 4 Jul 2029Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

71homes, 279 to 1,586 sq ft of carpet area
  • Under 1,000 sq ft279–457 sq ft14
  • 1,000–1,500 sq ft1,251–1,308 sq ft52
  • 1,500–2,000 sq ft1,586 sq ft5

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 11 rows of a single unit and 14 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside3,076 m² in all, by use
  • Apartment buildings1,228 m² · 40%
  • Roads1,159 m² · 38%
  • Parks and playgrounds537 m² · 17%
  • Electricity sub-station151 m² · 5%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenCeramic tiles up to 600MM counter top
  • FloorsLiving/drawing room virtified tiles master bedroom laminate flooring master toilet anti skid tile flooring other bedroom virtified tiles other toilet anti skid tile flooring dinning room virtified tiles kitchen virtified tiles room/utility room NA servant room NA internal lobby area virtified tiles balconies/verandah anti skid tile flooring OPEN terrace anti skid tile flooring stair CASE granite/ tile
  • WallsToilet- ceramic tiles on wall, anti skid tiles on floor in toilets
  • BathroomsSink stainless stell ISI marked WASH basin ceramic washing machine NA taps brass make ISI marked fitting CP fitting
  • WindowsWindow/glazing UPVC
  • Main doorFlush door
  • Electrical fittingsConduit PVC conduit pipe switches modular switches socket modular socket wire 1MM,1.5MM,2.5MM,4MM switch board modular switch board ISI marked switch board boxes GI sheet modular box ISI marked MCB modular MCB box ISI marked fan NA lights TUBE light exhaust fan NA electrica L works specifica tions electrical points WILL be provided as per DWG.

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: GH 1, SECTOR 23-23A, URBAN ESTATE, GURGAON

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Questions buyers ask

Is MDS JAI SHRI registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/924/656/2025/27. Valid to 4 Jul 2029.

The source ↗
What is the possession timeline for MDS JAI SHRI?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 4 Jul 2029. Its registration runs to 4 Jul 2029; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around MDS JAI SHRI?From the records · HARERA, read 4 Nov 2026

MDS JAI SHRI is in Gurugram; the site address declared to HARERA is Gh 1, Sector 23-23a, Urban Estate, Gurgaon. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building MDS JAI SHRI?From the records · HARERA, read 4 Nov 2026

MDS JAI SHRI is a Metadesign Solutions project, registered by its company METADESIGN SOLUTIONS PRIVATE LIMITED.

The source ↗Metadesign Solutions's projects and court record

The records

What the registers hold for MDS JAI SHRI: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/924/656/2025/27: Registered. Valid to 4 Jul 2029.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Plans approved, as the developer declared: layout plan 5 Jul 2024, building plans 5 Jul 2024.Declared to HARERA, read 29 Oct 2026
The court record of Metadesign Solutions’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 44 HARERA files, with the dates we read them
Registration no.
GGM/924/656/2025/27
Registration valid till
4 Jul 2029
Declared possession
4 Jul 2029

Declared by the promoter to HARERA

Land area
3075.72 (Sqr/mtrs)
FAR
the application prints 348.63, which is not a ratio
licence
Land Allotted by HSVP vide CD registered vide no. 13162 dated 05/02/2025
Estimated project cost
₹117.68 crore
Cost of land
₹46.07 crore
Layout plan, declared approved (field 5a)
5 Jul 2024
Building plans, declared approved
5 Jul 2024
Construction to start
1 Aug 2024
Completion declared for
4 Jul 2029
Declared inventory · 47 types

Declared inventory — 47 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 8 units · 116.22 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 8 units · 117.42 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 8 units · 118.31 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 5 units · 118.78 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 8 units · 119.02 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 5 units · 119.97 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 2 units · 120.24 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 8 units · 121.53 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 5

Statutory approvals, as declared

  • I. ALLOTTMENT LETTER — declared: already been obtained (28 Nov 2023)
  • II. CONVEYANCE DEED — declared: already been obtained (5 Feb 2025)
  • III. ZONING PLAN — declared: already been obtained (9 Jun 2023)
  • IV. BUILDING PLAN — declared: already been obtained (5 Jul 2024)
  • V. FIRE SCHEME — declared: already been obtained (27 Sept 2024)
On file with HARERA · 44 files

On file with HARERA (44)

Plans

Site plan

1 file
Approved Site Plan2 Dec 2024

Layout plan

1 file
Latest Layout Plan21 Oct 2024

Zoning plan

1 file
Zoning Plan3 Dec 2024

Demarcation plan

1 file
Demarcation Plan3 Dec 2024

Building plans

6 files
Approved Building Plans, Full Set26 Mar 2025Nw - Sw Side Elevation Plan26 Mar 2025Section at - Bb26 Mar 2025

Floor plans

8 files
Upper Basement Plan26 Mar 2025Middle Basement Plan26 Mar 20254 to 9th Floor Plan26 Mar 2025

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule2 Dec 2024

Fire safety

11 files
Schematic 10 Fire Plan26 Mar 2025Gf,ff, Sf Plan - 6 - Comp Fire Plan26 Mar 2025Middle Basement & Upper Basement Site Plan 3 Fire Plan26 Mar 2025

Other NOCs and clearances

2 files
NOC Creation of Third Party Right26 Mar 2025Airport NOC26 Mar 2025

Land records

Land records

3 files
No Encumbrance Certificate26 Mar 2025Title Search Report26 Mar 2025Revenue Record Entry of Licence and Collaboration2 Dec 2024

Sales papers

Allotment and sale agreements

2 files
Conveyance Deed Sector-23-23A Plot No-GH-126 Mar 2025Possession Certificate26 Mar 2025

Money

Accounts and finance

4 files
No Due Certificate26 Mar 2025Non-Default Certificate from a CA26 Mar 2025Cash Flow Statement26 Mar 2025CA Certificate on the Application’s Figures2 Dec 2024

The promoter’s papers

Declarations and affidavits

2 files
Bank Undertaking26 Mar 2025The Promoter’s Declaration on Affidavit3 Dec 2024

HARERA’s orders

HARERA’s orders

1 file
Addendum to the Registration Certificate -Revision in Building Plans10 Feb 2026

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared Land Allotted by HSVP vide CD registered vide no. 13162 dated 05/02/2025. We could not read a licence number from that, so nothing is claimed about it here.

declared in the registration application (Form REP-I), Gurugram bench · submitted 3 Dec 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan2 Dec 2024

Layout plan

1 file
Latest Layout Plan21 Oct 2024

Building plans

6 files
Approved Building Plans, Full Set26 Mar 2025Nw - Sw Side Elevation Plan26 Mar 2025Section at - Bb26 Mar 2025Se - Ne Side Elevation26 Mar 2025Section at - Aa26 Mar 2025Terrace Floor Plan26 Mar 2025

Floor plans

8 files
Upper Basement Plan26 Mar 2025Middle Basement Plan26 Mar 20254 to 9th Floor Plan26 Mar 202510th to 14th Floor Plan26 Mar 2025First Floor Plan26 Mar 2025Ground Floor Plan26 Mar 2025

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (44 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3159 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Metadesign Solutions

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.