MDS JAI SHRI
by Metadesign Solutions · Gurugram
Not on our price list yet
Possession 4 Jul 2029 · as the developer declared it to HARERA
About this project
Key facts
- Registered by
- METADESIGN SOLUTIONS PRIVATE LIMITEDthe company that filed it, for Metadesign Solutions
- 5 Jul 2024Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 4 Jul 2029Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- Under 1,000 sq ft279–457 sq ft14
- 1,000–1,500 sq ft1,251–1,308 sq ft52
- 1,500–2,000 sq ft1,586 sq ft5
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 11 rows of a single unit and 14 units under 25 m², because the form lists homes, shops and other buildings in one table.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Apartment buildings1,228 m² · 40%
- Roads1,159 m² · 38%
- Parks and playgrounds537 m² · 17%
- Electricity sub-station151 m² · 5%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- KitchenCeramic tiles up to 600MM counter top
- FloorsLiving/drawing room virtified tiles master bedroom laminate flooring master toilet anti skid tile flooring other bedroom virtified tiles other toilet anti skid tile flooring dinning room virtified tiles kitchen virtified tiles room/utility room NA servant room NA internal lobby area virtified tiles balconies/verandah anti skid tile flooring OPEN terrace anti skid tile flooring stair CASE granite/ tile
- WallsToilet- ceramic tiles on wall, anti skid tiles on floor in toilets
- BathroomsSink stainless stell ISI marked WASH basin ceramic washing machine NA taps brass make ISI marked fitting CP fitting
- WindowsWindow/glazing UPVC
- Main doorFlush door
- Electrical fittingsConduit PVC conduit pipe switches modular switches socket modular socket wire 1MM,1.5MM,2.5MM,4MM switch board modular switch board ISI marked switch board boxes GI sheet modular box ISI marked MCB modular MCB box ISI marked fan NA lights TUBE light exhaust fan NA electrica L works specifica tions electrical points WILL be provided as per DWG.
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
Bhumiq holds no map point for this project yet.The site address declared to HARERA: GH 1, SECTOR 23-23A, URBAN ESTATE, GURGAON
The builder
- Registered, no OC or CC yet: 1
Questions buyers ask
Is MDS JAI SHRI registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/924/656/2025/27. Valid to 4 Jul 2029.
The source ↗What is the possession timeline for MDS JAI SHRI?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 4 Jul 2029. Its registration runs to 4 Jul 2029; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around MDS JAI SHRI?From the records · HARERA, read 4 Nov 2026
MDS JAI SHRI is in Gurugram; the site address declared to HARERA is Gh 1, Sector 23-23a, Urban Estate, Gurgaon. Bhumiq has not measured its distance to the main roads and metro lines yet.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building MDS JAI SHRI?From the records · HARERA, read 4 Nov 2026
MDS JAI SHRI is a Metadesign Solutions project, registered by its company METADESIGN SOLUTIONS PRIVATE LIMITED.
The source ↗Metadesign Solutions's projects and court recordThe records
What the registers hold for MDS JAI SHRI: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/924/656/2025/27: Registered. Valid to 4 Jul 2029.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Plans approved, as the developer declared: layout plan 5 Jul 2024, building plans 5 Jul 2024.Declared to HARERA, read 29 Oct 2026
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 44 HARERA files, with the dates we read them
- Registration no.
- GGM/924/656/2025/27
- Registration valid till
- 4 Jul 2029
- Declared possession
- 4 Jul 2029
Declared by the promoter to HARERA
- Land area
- 3075.72 (Sqr/mtrs)
- FAR
- the application prints 348.63, which is not a ratio
- licence
- Land Allotted by HSVP vide CD registered vide no. 13162 dated 05/02/2025
- Estimated project cost
- ₹117.68 crore
- Cost of land
- ₹46.07 crore
- Layout plan, declared approved (field 5a)
- 5 Jul 2024
- Building plans, declared approved
- 5 Jul 2024
- Construction to start
- 1 Aug 2024
- Completion declared for
- 4 Jul 2029
Declared inventory · 47 types
Declared inventory — 47 types declared, first 8 shown
- Apartment/Shops/Other Buildings · 8 units · 116.22 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 8 units · 117.42 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 8 units · 118.31 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 5 units · 118.78 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 8 units · 119.02 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 5 units · 119.97 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 2 units · 120.24 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 8 units · 121.53 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 5
Statutory approvals, as declared
- I. ALLOTTMENT LETTER — declared: already been obtained (28 Nov 2023)
- II. CONVEYANCE DEED — declared: already been obtained (5 Feb 2025)
- III. ZONING PLAN — declared: already been obtained (9 Jun 2023)
- IV. BUILDING PLAN — declared: already been obtained (5 Jul 2024)
- V. FIRE SCHEME — declared: already been obtained (27 Sept 2024)
On file with HARERA · 44 files
On file with HARERA (44)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
6 filesFloor plans
8 filesApprovals and clearances
DTCP licence
1 fileFire safety
11 filesOther NOCs and clearances
2 filesLand records
Land records
3 filesSales papers
Allotment and sale agreements
2 filesMoney
Accounts and finance
4 filesThe promoter’s papers
Declarations and affidavits
2 filesHARERA’s orders
HARERA’s orders
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
The promoter declared Land Allotted by HSVP vide CD registered vide no. 13162 dated 05/02/2025. We could not read a licence number from that, so nothing is claimed about it here.
declared in the registration application (Form REP-I), Gurugram bench · submitted 3 Dec 2024 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
6 filesFloor plans
8 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (44 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/3159 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Metadesign Solutions
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.