Skip to content

MKS County-Phase I

by Metro Technobuild · Gurugram

Not on our price list yet

Possession 30 Sep 2024 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Carpet area
581–1,270 sq ft
In m²about 54–118 m², as declared
Registered
21 Feb 2019
Registered by
METRO TECHNO BUILD PVT. LTD.the company that filed it, for Metro Technobuild
Timeline
  1. 26 Oct 2015Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 21 Feb 2019Registered with HARERAHARERA, read 4 Nov 2026
  3. 19 May 2024Registration valid toHARERA, read 4 Nov 2026
  4. 30 Sep 2024Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

353homes, 581 to 1,270 sq ft of carpet area
  • Under 1,000 sq ft581–953 sq ft247
  • 1,000–1,500 sq ft1,002–1,270 sq ft106

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 141 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside18,841 m² in all, by use
  • Parks and playgrounds6,026 m² · 32%
  • Roads4,515 m² · 24%
  • Apartment buildings4,106 m² · 22%
  • Parking1,986 m² · 11%
  • Other usesas the form names them: Maintenance, Playground1,109 m² · 6%
  • Pavements843 m² · 4%
  • Sewage and waste treatment256 m² · 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningSplit AIR conditioner in all bedroom
  • KitchenGranite counter with SS sink & modular cabinets
  • Kitchen appliancesModular cabinets
  • LiftsOTIS / KONE/thyssenkrupp & equivalent elevator
  • WardrobesNot provided
  • FloorsVitrified tiles in drawing, dinning and kitchen, laminated wooden flooring in bedroom, granite stone in bathroom, anti skid tiles in balcony.
  • WallsOBD paint
  • BathroomsWall mounted W/C of reputed brand with corrosion FREE UPVC/PPR/CPVC pipes & fittings.

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR-2, SOHNA, GURUGRAM

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • Other register states: 2

Questions buyers ask

Is MKS County-Phase I registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/315/47/2019/09, registered on 21 Feb 2019. The register’s record shows an end date of 19 May 2024. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for MKS County-Phase I?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Sep 2024. Its registration runs to 19 May 2024; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around MKS County-Phase I?From the records · HARERA, read 4 Nov 2026

MKS County-Phase I is in Gurugram; the site address declared to HARERA is Sector-2, Sohna, Gurugram. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building MKS County-Phase I?From the records · HARERA, read 4 Nov 2026

MKS County-Phase I is a Metro Technobuild project, registered by its company METRO TECHNO BUILD PVT. LTD..

The source ↗Metro Technobuild's projects and court record

The records

What the registers hold for MKS County-Phase I: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/315/47/2019/09: Registration lapsed. The register’s record shows an end date of 19 May 2024.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Licence 162 OF 2014, as the developer typed it: no match in the registers searched.Declared to HARERA, read 29 Oct 2026
  • Plans approved, as the developer declared: layout plan 26 Oct 2015, building plans 26 Oct 2015.Declared to HARERA, read 29 Oct 2026
The court record of Metro Technobuild’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 19 May 2024. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 12 HARERA files, with the dates we read them
Registration no.
GGM/315/47/2019/09
Registration date
21 Feb 2019
Registration valid till
19 May 2024
Declared possession
30 Sept 2024

Declared by the promoter to HARERA

Land area
4.66 (Acre) (18,858.35 sq m)
FAR
1.75 proposed of 1.75 permissible
licence
162 of 2014(12.09.2014)
Estimated project cost
₹218.03 crore
Cost of land
₹35.00 crore
Layout plan, declared approved (field 5a)
26 Oct 2015
Building plans, declared approved
26 Oct 2015
Construction to start
20 Jun 2018
Completion declared for
30 Sept 2024
Declared inventory · 22 types

Declared inventory — 22 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 68 units · 57.132 sq m carpet · 4 towers · one flat
  • Apartment/Shops/Other Buildings · 2 units · 53.966 sq m carpet · 4 towers · one flat
  • Apartment/Shops/Other Buildings · 2 units · 65.05 sq m carpet · 4 towers · one flat
  • Apartment/Shops/Other Buildings · 2 units · 7.29 sq m carpet · 6 towers · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 2 units · 15.95 sq m carpet · 6 towers · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 7 units · 20.9 sq m carpet · 6 towers · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 34 units · 111.105 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 2 units · 118.028 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 7

Statutory approvals, as declared

  • I. LICENCE — declared: already been obtained (12 Sept 2014)
  • II. APPROVED BUILDING PLAN — declared: already been obtained (26 Oct 2015)
  • III. FOREST — declared: already been obtained (17 Dec 2015)
  • IV. AIRPORT AUTHORITY — declared: already been obtained (18 Dec 2015)
  • V. ENVIRONMENT CLEARANCE — declared: already been obtained (20 May 2016)
  • VI. ELECTRICITY SUPPLY PLAN — declared: applied for but yet to receive (2 Jan 2019)
  • VII. WATER SUPPLY PLAN — declared: applied for but yet to receive (2 Jan 2019)
On file with HARERA · 12 files

On file with HARERA (12)

Plans

Site plan

1 file
Approved Site Plan6 Nov 2018

Layout plan

1 file
Latest Layout Plan6 Nov 2018

Zoning plan

1 file
Zoning Plan6 Nov 2018

Demarcation plan

1 file
Demarcation Plan6 Nov 2018

Building plans

1 file
Approved Building Plans, Full Set6 Nov 2018

Services

Service plans

1 file
Service Plans on the Layout15 Feb 2019

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule6 Nov 2018

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration15 Feb 2019

Money

Accounts and finance

3 files
Cash Flow Statement15 Feb 2019Non-Default Certificate from a CA12 Nov 2018CA Certificate on the Application’s Figures6 Nov 2018

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit15 Feb 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared 162 OF 2014. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 14 Nov 2018 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan6 Nov 2018

Layout plan

1 file
Latest Layout Plan6 Nov 2018

Building plans

1 file
Approved Building Plans, Full Set6 Nov 2018

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (12 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/275 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Metro Technobuild

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.