MRG CROWN

by Mrg Group India · Gurugram

Not on our price list yet

Possession 30 Apr 2027 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Carpet area
781–965 sq ft
In m²about 73–90 m², as declared
Registered by
MRG GROUP INDIA PVT. LTD.the company that filed it, for Mrg Group India
Timeline
  1. 24 Nov 2022Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 22 Feb 2023Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 30 Apr 2027Possession, as declareddeclared to HARERA, read 29 Oct 2026
  4. 15 Nov 2027Registration valid toHARERA, read 3 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

436homes, 781 to 965 sq ft of carpet area
  • Under 1,000 sq ft781–965 sq ft436

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside15,388 m² in all, by use
  • Apartment buildings15,388 m² · 100%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningVRV with high wall units in living, dining, bedrooms
  • KitchenModular kitchen without appliances, and SS sink
  • LiftsStandard make
  • WardrobesDesigner wardrobes
  • FloorsTiles / marble / granite / laminated wood
  • WallsOBD/ SEMI-acrylic / acrylic emulsion / tiles
  • BathroomsCP fittings, WASH basin, WC with accessories
  • WindowsUPVC / aluminium

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: 9TH FLOOR, IREO GRAND VIEW TOWER, SECTOR-58, GURUGRAM

The builder

Its 4 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 4

Questions buyers ask

Is MRG CROWN registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/706/438/2023/50. Valid to 15 Nov 2027.

The source ↗
What is the possession timeline for MRG CROWN?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Apr 2027. Its registration runs to 15 Nov 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around MRG CROWN?From the records · HARERA, read 3 Nov 2026

MRG CROWN is in Gurugram; the site address declared to HARERA is 9th Floor, Ireo Grand View Tower, Sector-58, Gurugram. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building MRG CROWN?From the records · HARERA, read 3 Nov 2026

MRG CROWN is a Mrg Group India project, registered by its company MRG GROUP INDIA PVT. LTD..

The source ↗Mrg Group India's projects and court record

The records

What the registers hold for MRG CROWN: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/706/438/2023/50: Registered. Valid to 15 Nov 2027.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 192 OF 2022 is on the DTCP register, valid to 22 Nov 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 24 Nov 2022, building plans 22 Feb 2023.Declared to HARERA, read 29 Oct 2026
The court record of Mrg Group India’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 31 HARERA files, with the dates we read them
Registration no.
GGM/706/438/2023/50
Registration valid till
15 Nov 2027
Declared possession
30 Apr 2027

Declared by the promoter to HARERA

Land area
3.8 (Acre) (15,378.05 sq m)
FAR
2.6 proposed of 2.64 permissible
licence
192 of 2022
Estimated project cost
₹474.97 crore
Cost of land
₹92.22 crore
Layout plan, declared approved (field 5a)
24 Nov 2022
Building plans, declared approved
22 Feb 2023
Construction to start
1 May 2023
Completion declared for
30 Apr 2027
Declared inventory · 11 types

Declared inventory — 11 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 48 units · 88.485 sq m carpet · 12 towers · one flat
  • Apartment/Shops/Other Buildings · 8 units · 89.633 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 8 units · 89.633 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 76 units · 88.115 sq m carpet · 19 towers · one flat
  • Apartment/Shops/Other Buildings · 32 units · 88.115 sq m carpet · 8 towers · one flat
  • Apartment/Shops/Other Buildings · 72 units · 82.502 sq m carpet · 18 towers · one flat
  • Apartment/Shops/Other Buildings · 64 units · 82.502 sq m carpet · 18 towers · one flat
  • Apartment/Shops/Other Buildings · 24 units · 83.504 sq m carpet · 6 towers · one flat
Statutory approvals, as declared · 5

Statutory approvals, as declared

  • I. CHANGE OF DEVELOPER — declared: already been obtained (9 Mar 2023)
  • II. LICENCE — declared: already been obtained (23 Nov 2022)
  • III. BR-III — declared: already been obtained (22 Feb 2023)
  • IV. LOI — declared: already been obtained (28 Jun 2022)
  • V. LC IV & IV-A — declared: already been obtained (23 Nov 2022)
On file with HARERA · 31 files

On file with HARERA (31)

Plans

Site plan

1 file
Approved Site Plan10 Mar 2023

Layout plan

1 file
Latest Layout Plan10 Mar 2023

Zoning plan

1 file
Zoning Plan4 Jul 2023

Demarcation plan

1 file
Demarcation Plan4 Jul 2023

Building plans

11 files
Building Plan- Type A4 Jul 2023BR-III4 Jul 2023Building Plan- Type A34 Jul 2023

Services

Service plans

1 file
Service Estimates Plan4 Jul 2023

Approvals and clearances

DTCP licence

5 files
COD Final Approval4 Jul 2023Licence Copy with Land Schedule4 Jul 2023LOI- 8.168 Acres4 Jul 2023

Other NOCs and clearances

2 files
Aaravali NOC4 Jul 2023AAI NOC4 Jul 2023

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration4 Jul 2023

Money

Accounts and finance

3 files
Cash Flow Statement4 Jul 2023CA Certificate Quarterly Cost Incurred4 Jul 2023Non-Default Certificate from a CA10 Mar 2023

The promoter’s papers

Declarations and affidavits

2 files
The Promoter’s Declaration on Affidavit4 Jul 2023Bank Undertaking4 Jul 2023

HARERA’s orders

HARERA’s orders

2 files
Amendment in the Registration Certificate After Change in Saleable Area of the Project Pursuant to the Revision in Building Plan8 Jan 2025Amendment in the Registration Certificate after change in building plan20 Sept 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

192 OF 2022 · MRG GROUP INDIA PVT.LTD. · GURGAON-MANESAR

Licence valid to 22 Nov 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 10 Mar 2023 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

192 OF 2022: 16 parcels, 8.1687 acres in all, in Babupur (hadbast 60), tehsil Gurgaon.

The licence register prints the same licensed area, 8.1688 acres.

  • 19//15/16 marla
  • 19//63 marla
  • 20//10/1/42 kanal 15 marla
  • 20//118 kanal
Show the other 12 parcels
  • 20//12/12 kanal 8 marla
  • 20//12/24 kanal 4 marla
  • 20//192 kanal 4 marla
  • 20//20/12 kanal 13 marla
  • 20//20/25 kanal 7 marla
  • 20//21/13 kanal 11 marla
  • 20//228 kanal
  • 20//9/1/1418 marla
  • 28//28 kanal
  • 28//38 kanal
  • 28//48 kanal
  • 28//9/118 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Babupur (hadbast 60), tehsil Gurgaon. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 19//15/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan10 Mar 2023

Layout plan

1 file
Latest Layout Plan10 Mar 2023

Building plans

11 files
Building Plan- Type A4 Jul 2023BR-III4 Jul 2023Building Plan- Type A34 Jul 2023Building Plan- Type B4 Jul 2023Building Plan- Type C24 Jul 2023Building Plan- Type C4 Jul 2023

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (31 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2393 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Mrg Group India

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.