Skip to content

MULBERRY COUNTY PHASE-IV (TOWER-E & F)

by Mg Housing · Faridabad

Not on our price list yet

Possession 31 Dec 2025 · as the developer declared it to HARERA

About this project

Key facts

Location
Faridabad
Carpet area
about 1,015 sq ft
In m²about 94.3 m², the average flat, as declared
Registered by
MG HOUSING PVT. LTD.the company that filed it, for Mg Housing
Timeline
  1. 2 Nov 2019Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Dec 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • KitchenCeramic tiles, ceramic tiles-2 FT. above counter & OBD paint / whitewash in balance area, OBD paint white WASH.
  • FloorsLiving dining and passage: vitrified tiles bedrooms: vitrified tiles. kitchen- ceramic tiles balconies & toiles- ceramic tiles
  • WallsLiving dining and passage: OBD paint / whitewash; bedroom: OBD paint/whitewash. kitchen- ceramic tiles only 2 FT. above counter & OBD paint / whitewash in balance area. balconies: exterior finish paint toilets: ceramic tiles upto 7'0" height
  • BathroomsCeramic tiles, ceramic tiles upto 7'0" height, PVC false ceiling, matching WC & WASH basin, CP fittings.
  • WindowsInternal doors: laminated / painted / melamine finished door external doors: UPVC/powder coated aluminium.
  • Main doorInternal doors: laminated / painted / melamine finished door external doors: UPVC/powder coated aluminium.
  • Electrical fittingsCopper electrical wiring throughout in concealed conduit with provisions for light point, power point, with protective MCBS & modular switches
  • Water storageAs per ISI standards.

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR 70

The builder

Its 6 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Other register states: 5

Questions buyers ask

Is MULBERRY COUNTY PHASE-IV (TOWER-E & F) registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as HRERA-PKL-FBD-319-2022. The register’s record shows an end date of 31 Dec 2025. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for MULBERRY COUNTY PHASE-IV (TOWER-E & F)?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2025. Its registration runs to 31 Dec 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around MULBERRY COUNTY PHASE-IV (TOWER-E & F)?From the records · HARERA, read 4 Nov 2026

MULBERRY COUNTY PHASE-IV (TOWER-E & F) is in Faridabad; the site address declared to HARERA is Sector 70. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building MULBERRY COUNTY PHASE-IV (TOWER-E & F)?From the records · HARERA, read 4 Nov 2026

MULBERRY COUNTY PHASE-IV (TOWER-E & F) is a Mg Housing project, registered by its company MG HOUSING PVT. LTD..

The source ↗Mg Housing's projects and court record

The records

What the registers hold for MULBERRY COUNTY PHASE-IV (TOWER-E & F): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration HRERA-PKL-FBD-319-2022: Registration lapsed. The register’s record shows an end date of 31 Dec 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 78 OF 2012 is on the DTCP register: Licence lapsed; the register prints its validity to 31 Jul 2020.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 2 Nov 2019.Declared to HARERA, read 29 Oct 2026
The court record of Mg Housing’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 78 OF 2012 lapsed

    Named in this project’s application. Valid to 31 Jul 2020; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 31 Dec 2025. HARERA Panchkula, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 5 HARERA files, with the dates we read them
Registration no.
HRERA-PKL-FBD-319-2022
Registration valid till
31 Dec 2025
Declared possession
31 Dec 2025

Declared by the promoter to HARERA

Land area
16407.15 (Sqr/mtrs)
FAR
the application prints 175, which is not a ratio
licence
License No. 78 of 2012 dated 01.08.2012.
Estimated project cost
₹46.54 crore
Cost of land
₹2.83 crore
Building plans, declared approved
2 Nov 2019
Construction to start
1 Apr 2022
Completion declared for
31 Dec 2025
Declared inventory · 2 types

Declared inventory

  • Apartment/Shops/Other Buildings · 86 units · 7,074.852 sq m carpet · 1 tower · total for 86 flats, about 82.3 m² each
  • Apartment/Shops/Other Buildings · 88 units · 9,332.299 sq m carpet · 1 tower · total for 88 flats, about 106 m² each
Statutory approvals, as declared · 1

Statutory approvals, as declared

  • I. LICENSE NO. 78 OF 2012 — declared: already been obtained (1 Aug 2012)
On file with HARERA · 5 files

On file with HARERA (5)

Plans

Site plan

1 file
Approved Site Plan24 Mar 2022

Layout plan

1 file
Latest Layout Plan24 Mar 2022

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule24 Mar 2022

Money

Accounts and finance

1 file
Non-Default Certificate from a CA24 Mar 2022

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit24 Mar 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

78 OF 2012 · MG Housing Pvt. Ltd. (Transferred from Jai Shakti Builders Pvt. Ltd. vide orders dt. 17/04/2013) · Faridabad

Licence valid to 31 Jul 2020

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Panchkula bench · submitted 13 Apr 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/1 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

78 OF 2012: 15 parcels, 10.1 acres in all, in Mujeri (hadbast 81), tehsil Ballabgarh.

The licence register prints the same licensed area, 10.1 acres.

  • 17//128 kanal
  • 17//138 kanal
  • 17//188 kanal
  • 17//198 kanal
Show the other 11 parcels
  • 17//2/12 kanal 13 marla
  • 17//228 kanal
  • 17//23/14 kanal 3 marla
  • 17//23/21 marla
  • 17//23/33 kanal 16 marla
  • 17//86 kanal
  • 17//813 marla
  • 17//98 kanal
  • 22//28 kanal
  • 22//3/13 kanal 10 marla
  • 22//9/14 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Faridabad, then the tehsil and the village: Mujeri (hadbast 81), tehsil Ballabgarh. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 17//12.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan24 Mar 2022

Layout plan

1 file
Latest Layout Plan24 Mar 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (5 in all), none is a building plan, a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1907 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Mg Housing

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Panchkula records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.