MVN ATHENS

by MVN Infrastructure · Gurugram

Not on our price list yet

Possession 1 Oct 2025 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Carpet area
373–646 sq ft
In m²about 35–60 m², as declared
Registered by
MVN INFRASTRUCTURE PVT LTDthe company that filed it, for MVN Infrastructure
Timeline
  1. 20 Jan 2022Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 1 Oct 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 29 Sep 2026Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

274homes, 373 to 646 sq ft of carpet area
  • Under 1,000 sq ft373–646 sq ft274

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • KitchenOPEN kitchen with marble platform.
  • LiftsAs per approved drawings
  • FloorsAll rooms vitrified flooring, toilets ceramic flooring.
  • WallsInternal wall oil bound distemper
  • BathroomsCP fittings as per approved drawings
  • WindowsGlass as per approved drawing
  • Main doorFlush door
  • Electrical fittingsAs per approved drawing

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR- 5, DHAULA ROAD , SOHNA

The builder

Its 5 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2
  • Registered, no OC or CC yet: 2
  • Other register states: 1

Questions buyers ask

Is MVN ATHENS registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/588/320/2022/63. The register’s record shows an end date of 29 Sep 2026. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for MVN ATHENS?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 1 Oct 2025. Its registration runs to 29 Sep 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around MVN ATHENS?From the records · HARERA, read 4 Nov 2026

MVN ATHENS is in Gurugram; the site address declared to HARERA is Sector- 5, Dhaula Road , Sohna. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building MVN ATHENS?From the records · HARERA, read 4 Nov 2026

MVN ATHENS is a MVN Infrastructure project, registered by its company MVN INFRASTRUCTURE PVT LTD.

The source ↗MVN Infrastructure's projects and court record

The records

What the registers hold for MVN ATHENS: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/588/320/2022/63: Registration lapsed. The register’s record shows an end date of 29 Sep 2026.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 49 OF 2014 is on the DTCP register: Licence lapsed; the register prints its validity to 17 Feb 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 20 Jan 2022, building plans 20 Jan 2022.Declared to HARERA, read 29 Oct 2026
The court record of MVN Infrastructure’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 49 OF 2014 lapsed

    Named in this project’s application. Valid to 17 Feb 2026; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Red flag: Licence 27 OF 2020 lapsed

    Named in this project’s application. Valid to 1 Oct 2025; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 29 Sep 2026. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 21 HARERA files, with the dates we read them
Registration no.
GGM/588/320/2022/63
Registration valid till
29 Sept 2026
Declared possession
1 Oct 2025

Declared by the promoter to HARERA

Land area
8.25 (Acre) (33,386.57 sq m)
FAR
the application prints 225, which is not a ratio
licence
49 of 2014(18.02.2026) 27 of 2020 (02.10.2020)
Estimated project cost
₹52.00 crore
Cost of land
₹6.27 crore
Layout plan, declared approved (field 5a)
20 Jan 2022
Building plans, declared approved
20 Jan 2022
Construction to start
15 Feb 2022
Completion declared for
1 Oct 2025
Declared inventory · 4 types

Declared inventory

  • Apartment/Shops/Other Buildings · 101 units · 49.422 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 60 units · 55.45 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 44 units · 59.969 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 69 units · 34.616 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 1

Statutory approvals, as declared

  • I. SERVICES PLANS — declared: applied for but yet to receive (25 Jan 2022)
On file with HARERA · 21 files

On file with HARERA (21)

Plans

Site plan

2 files
Site Superimposed on Demarcation Plan19 Jul 2022Approved Site Plan1 Feb 2022

Layout plan

1 file
Latest Layout Plan28 Jan 2022

Zoning plan

1 file
Zoning Plan28 Jan 2022

Demarcation plan

1 file
Demarcation Plan19 Jul 2022

Building plans

1 file
Approved Building Plans, Full Set19 Jul 2022

Services

Sewerage and drainage

2 files
Sewerage Plan19 Jul 2022Storm Drainage19 Jul 2022

Electricity

2 files
Electricity Plan19 Jul 2022Street Light Plan19 Jul 2022

Roads

1 file
Road and Pavement Plan19 Jul 2022

Landscape and green areas

1 file
Landscape Plan19 Jul 2022

Service plans

2 files
Solid Waste Management19 Jul 2022Service Plans on the Layout1 Feb 2022

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule28 Jan 2022

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration19 Jul 2022

Money

Accounts and finance

3 files
CA Certificate on the Application’s Figures19 Jul 2022Cash Flow Statement19 Jul 2022Non-Default Certificate from a CA1 Feb 2022

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit1 Feb 2022

HARERA’s orders

HARERA’s orders

1 file
Extension No. 47 of 2025 dated 31.12.20253 Feb 2026

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

49 OF 2014 · MVN Infrastructure Pvt. Ltd. · Sohna

Licence valid to 17 Feb 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

27 OF 2020 · MVN Infrastructure P Ltd · SOHNA

Licence valid to 1 Oct 2025

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 1 Feb 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 2 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

49 OF 2014: 10 parcels, 6.5062 acres in all, in Sohna (hadbast 187), tehsil Sohna.

The licence register prints the same licensed area, 6.5 acres.

  • 179//108 kanal
  • 179//125 kanal
  • 179//210 kanal 4 marla
  • 179//9/11 kanal 17 marla
Show the other 6 parcels
  • 179//9/25 kanal 18 marla
  • 140//12/33 kanal 10 marla
  • 140//198 kanal 6 marla
  • 140//22/11 kanal 7 marla
  • 140//22/26 kanal 13 marla
  • 140//23/11 kanal 6 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

27 OF 2020: 3 parcels, 1.7438 acres in all, in Sohna (hadbast 187), tehsil Sohna.

The licence register prints the same licensed area, 1.7438 acres.

  • 140//18/25 kanal 13 marla
  • 140//23/2/23 kanal 14 marla
  • rectangle 140, kila 13/34 kanal 12 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Sohna (hadbast 187), tehsil Sohna. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 179//10.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Superimposed on Demarcation Plan19 Jul 2022Approved Site Plan1 Feb 2022

Layout plan

1 file
Latest Layout Plan28 Jan 2022

Building plans

1 file
Approved Building Plans, Full Set19 Jul 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (21 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1855 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on MVN Infrastructure

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.