Skip to content

MVN Athens Sohna

by MVN Infrastructure · Gurugram

Not on our price list yet

Possession 29 May 2019 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Carpet area
457 sq ft
In m²about 42–42 m², as declared
Registered
10 Oct 2017
Registered by
MVN INFRASTRUCTURE PVT LTDthe company that filed it, for MVN Infrastructure
Timeline
  1. 16 May 2016Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 10 Oct 2017Registered with HARERAHARERA, read 4 Nov 2026
  3. 29 May 2019Possession, as declareddeclared to HARERA, read 29 Oct 2026
  4. 9 Oct 2021Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

698homes, 457 to 457 sq ft of carpet area
  • Under 1,000 sq ft457 sq ft698

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • KitchenOPEN kitchen marble platform
  • LiftsAs per approved drawings
  • FloorsAll rooms vitrified flooring,toilets ceramics tiles
  • WallsOil BOND distemper
  • BathroomsCP fittings as per approved drawings
  • WindowsSaint gobin 5MM thick glass
  • Main doorFlush door
  • Electrical fittingsAs per approved drawings

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR 5, SOHNA, GURUGRAM

The builder

Its 5 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2
  • Registered, no OC or CC yet: 2
  • Other register states: 1

Questions buyers ask

Is MVN Athens Sohna registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 284 OF 2017, registered on 10 Oct 2017. Ended 9 Oct 2021. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for MVN Athens Sohna?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 29 May 2019. Its registration runs to 9 Oct 2021; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around MVN Athens Sohna?From the records · HARERA, read 4 Nov 2026

MVN Athens Sohna is in Gurugram; the site address declared to HARERA is Sector 5, Sohna, Gurugram. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building MVN Athens Sohna?From the records · HARERA, read 4 Nov 2026

MVN Athens Sohna is a MVN Infrastructure project, registered by its company MVN INFRASTRUCTURE PVT LTD.

The source ↗MVN Infrastructure's projects and court record

The records

What the registers hold for MVN Athens Sohna: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 284 OF 2017: Registration expired. Ended 9 Oct 2021.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 49 OF 2014 is on the DTCP register: Licence lapsed; the register prints its validity to 17 Feb 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 16 May 2016, building plans 16 May 2016.Declared to HARERA, read 29 Oct 2026
The court record of MVN Infrastructure’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 9 Oct 2021. HARERA Gurugram, read 4 Nov 2026. Source

  • Red flag: Licence 49 OF 2014 lapsed

    Named in this project’s application. Valid to 17 Feb 2026; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 23 HARERA files, with the dates we read them
Registration no.
284 OF 2017
Registration date
10 Oct 2017
Registration valid till
9 Oct 2021
Declared possession
29 May 2019

Declared by the promoter to HARERA

Land area
6.50625 (Acre) (26,329.86 sq m)
FAR
2.25 proposed of 2.25 permissible
licence
49 of 2014, Dated 17.06.2019 Extension of license by the office order Dated 20.09.2018 upto 28.02.2019
Estimated project cost
₹98.75 crore
Cost of land
₹1.76 crore
Layout plan, declared approved (field 5a)
16 May 2016
Building plans, declared approved
16 May 2016
Construction to start
16 May 2016
Completion declared for
29 May 2019
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 698 units · 42.472 sq m carpet · 6 towers · one flat
Statutory approvals, as declared · 9

Statutory approvals, as declared

  • I. LICENSE & EXTENSION ORDER — declared: already been obtained (18 Jun 2014)
  • II. REVISED BUILDING PLAN — declared: already been obtained (16 May 2016)
  • III. FIRE NOC — declared: already been obtained (13 Mar 2019)
  • IV. ENVIRONMENT CLEARANCE — declared: already been obtained (5 May 2015)
  • V. SERVICE ESTIMATE PLAN — declared: already been obtained (13 Dec 2018)
  • VI. OCCUPANCY CERTIFICATE — declared: already been obtained (29 May 2019)
  • VII. ELECTRICAL LOAD SANCTION — declared: already been obtained (5 Apr 2019)
  • VIII. LAND DIVERSION — declared: already been obtained (9 Jul 2019)
  • IX. CONSENT TO OPERATE — declared: already been obtained (8 Nov 2019)
On file with HARERA · 23 files

On file with HARERA (23)

Plans

Site plan

1 file
Approved Site Plan14 Dec 2019

Layout plan

1 file
Latest Layout Plan14 Dec 2019

Zoning plan

1 file
Zoning Plan14 Dec 2019

Demarcation plan

1 file
Demarcation Plan14 Dec 2019

Building plans

1 file
Approved Building Plans, Full Set14 Dec 2019

Services

Service plans

2 files
Approval of Service Estimate25 Feb 2020Service Plans on the Layout14 Dec 2019

Approvals and clearances

Occupation certificate (OC)

2 files
OC uploaded27 May 2024OC25 Feb 2020

DTCP licence

3 files
LC-IV25 Feb 2020LOI25 Feb 2020Licence Copy with Land Schedule14 Dec 2019

Environment clearance

1 file
Environment Clearance25 Feb 2020

Fire safety

2 files
Fire NOC25 Feb 2020Fire Scheme Approval25 Feb 2020

Other NOCs and clearances

2 files
Pollution Approval25 Feb 2020Airport Authority Approval25 Feb 2020

Land records

Land records

2 files
Non Encumbrance Certificate25 Feb 2020Revenue Record Entry of Licence and Collaboration14 Dec 2019

Money

Accounts and finance

3 files
Cash Flow Statement14 Dec 2019CA Certificate on the Application’s Figures14 Dec 2019Non-Default Certificate from a CA14 Dec 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit14 Dec 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

49 OF 2014 · MVN Infrastructure Pvt. Ltd. · Sohna

Licence valid to 17 Feb 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 14 Dec 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

49 OF 2014: 10 parcels, 6.5062 acres in all, in Sohna (hadbast 187), tehsil Sohna.

The licence register prints the same licensed area, 6.5 acres.

  • 179//108 kanal
  • 179//125 kanal
  • 179//210 kanal 4 marla
  • 179//9/11 kanal 17 marla
Show the other 6 parcels
  • 179//9/25 kanal 18 marla
  • 140//12/33 kanal 10 marla
  • 140//198 kanal 6 marla
  • 140//22/11 kanal 7 marla
  • 140//22/26 kanal 13 marla
  • 140//23/11 kanal 6 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Sohna (hadbast 187), tehsil Sohna. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 179//10.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan14 Dec 2019

Layout plan

1 file
Latest Layout Plan14 Dec 2019

Building plans

1 file
Approved Building Plans, Full Set14 Dec 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (23 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1054 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on MVN Infrastructure

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.