NAKSHATRA BY NOWARA

by Nowara Realty · Gurugram

Not on our price list yet

Possession 30 Jun 2030 · as the developer declared it to HARERA

About this project

Key facts

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside35,789 m² in all, by use
  • Roads11,535 m² · 32%
  • Parking9,148 m² · 26%
  • Apartment buildings5,596 m² · 16%
  • Parks and playgrounds5,531 m² · 15%
  • Shops and offices2,345 m² · 7%
  • Green belts860 m² · 2%
  • Other usesas the form names them: Anganwadi and community, Guardroom HT room LT room459 m² · 1%
  • Electricity sub-station315 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenGranite/KOTA
  • LiftsKONE/johnson/OTIS/equivalent make
  • FloorsVitrified tiles(cardillac granito/signova/airona/equivalent
  • WallsOBD(asian/berger/equivalent)
  • BathroomsClassic/glossera/hagar/equivalent
  • WindowsAluminium /UPVC/equivalent
  • Main doorPainted hardwood frame with flush door(bhutan TUFF/jyoti/equivalent ISI)
  • Electrical fittingsAnchor/ROMA/equivalent modular

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR 3, FARUKHNAGAR

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Questions buyers ask

Is NAKSHATRA BY NOWARA registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/1025/757/2025/128. Valid to 30 Jun 2030.

The source ↗
What is the possession timeline for NAKSHATRA BY NOWARA?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Jun 2030. Its registration runs to 30 Jun 2030; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around NAKSHATRA BY NOWARA?From the records · HARERA, read 4 Nov 2026

NAKSHATRA BY NOWARA is in Gurugram; the site address declared to HARERA is Sector 3, Farukhnagar. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building NAKSHATRA BY NOWARA?From the records · HARERA, read 4 Nov 2026

NAKSHATRA BY NOWARA is a Nowara Realty project, registered by its company NOWARA REALTY LLP.

The source ↗Nowara Realty's projects and court record

The records

What the registers hold for NAKSHATRA BY NOWARA: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/1025/757/2025/128: Registered. Valid to 30 Jun 2030.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 73 OF 2025 is on the DTCP register, valid to 21 May 2030.DTCP, read 3 Nov 2026
The court record of Nowara Realty’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 77 HARERA files, with the dates we read them
Registration no.
GGM/1025/757/2025/128
Registration valid till
30 Jun 2030
Declared possession
30 Jun 2030

Declared by the promoter to HARERA

Land area
8.84375 (Acre) (35,789.39 sq m)
FAR
the application prints 240, which is not a ratio
licence
73 of 2025 (22-05-2025)
Estimated project cost
₹334.37 crore
Cost of land
₹99.64 crore
Construction to start
1 Jan 2026
Completion declared for
30 Jun 2030
Declared inventory · 6 types

Declared inventory

  • Apartment/Shops/Other Buildings · 301 units · 51.32 sq m carpet · 7 towers
  • Apartment/Shops/Other Buildings · 13 units · 51.34 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 308 units · 51.87 sq m carpet · 7 towers
  • Apartment/Shops/Other Buildings · 13 units · 53.18 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 662 units · 59.97 sq m carpet · 8 towers
  • Apartment/Shops/Other Buildings · 88 units · 2,174.84 sq m carpet · 3 towers
Statutory approvals, as declared · 12

Statutory approvals, as declared

  • I. NOC - PUBLIC HEALTH — declared: already been obtained (16 Sept 2025)
  • II. BUILDING PLANS — declared: already been obtained (14 Oct 2025)
  • III. DEMARCATION CUM ZONING PLAN — declared: already been obtained (22 May 2025)
  • IV. AIRPORTS AUTHORITY OF INDIA NOC — declared: already been obtained (1 Jul 2025)
  • V. ARAVALI NOC — declared: already been obtained (25 Jul 2025)
  • VI. FOREST NOC — declared: already been obtained (24 Sept 2024)
  • VII. FRESH WATER SUPPLY ASSURANCE — declared: already been obtained (29 Sept 2025)
  • VIII. SEWARAGE CONNECTION ASSURANCE — declared: already been obtained (16 Jun 2025)
  • IX. STORM WATER ASSURANCE — declared: already been obtained (16 Jun 2025)
  • X. STP TREATED WATER ASSURANCE — declared: already been obtained (16 Jun 2025)
  • XI. LICENSE 73 OF 2025 — declared: already been obtained (22 May 2025)
  • XII. FIRE FIGHTING SCHEME — declared: applied for but yet to receive (16 Oct 2025)
On file with HARERA · 77 files

On file with HARERA (77)

Plans

Site plan

3 files
Site Plan Green and Parking22 Oct 2025Approved Site Plan22 Oct 2025Site Plan22 Oct 2025

Layout plan

1 file
Latest Layout Plan22 Oct 2025

Zoning plan

1 file
Zoning Plan22 Oct 2025

Demarcation plan

1 file
Demarcation Plan22 Oct 2025

Building plans

9 files
BR-III Nowara8 Jan 2026Tower-1 TO7 Section22 Oct 2025Approved Building Plans, Full Set22 Oct 2025

Floor plans

8 files
Tower-7 Typical Floor Plans22 Oct 2025Tower-1 to 4 Ground Floor Plan22 Oct 2025First Floor Plan Tower-422 Oct 2025

Services

Sewerage and drainage

3 files
Storm Drainage Connection Assurance22 Oct 2025Sewage Connection Assurance22 Oct 2025STP Water Assurance22 Oct 2025

Water supply

1 file
Drinking Water - Assurance22 Oct 2025

Electricity

1 file
Electricity Load DHBVN Letter8 Jan 2026

Service plans

1 file
Service Plans on the Layout22 Oct 2025

Approvals and clearances

DTCP licence

3 files
LOI8 Jan 2026LC-IV- Agreement8 Jan 2026Licence Copy with Land Schedule22 Oct 2025

Environment clearance

1 file
EC Application Ss8 Jan 2026

Fire safety

3 files
Fire Scheme Status8 Jan 2026Fire NOC Ht Line22 Oct 2025Fire NOC22 Oct 2025

Other NOCs and clearances

4 files
Public Health NOC22 Oct 2025AAI NOC22 Oct 2025Aravali NOC22 Oct 2025Forest NOC22 Oct 2025

Land records

Land records

6 files
Mutation8 Jan 2026Aks Shizra8 Jan 2026Jamabandi8 Jan 2026

Sales papers

Allotment and sale agreements

3 files
Conveyance Deed8 Jan 2026Agreement for Sale8 Jan 2026Allotment Letter8 Jan 2026

Brochure and specifications

1 file
Brochure8 Jan 2026

Money

Accounts and finance

11 files
Project Report8 Jan 2026Financial Statement8 Jan 2026CA Certificate for Financial & Inventory Details8 Jan 2026

Timeline and progress

Construction schedule

1 file
PERT Chart8 Jan 2026

The promoter’s papers

Declarations and affidavits

11 files
Affidavit Cum Undertaking for NOC from External Agencies8 Jan 2026Affidavit Cum Undertaking for High Tension Lines8 Jan 2026Affidavit Cum Undertaking for Seperate Bank Account8 Jan 2026

HARERA’s orders

HARERA’s orders

1 file
Collab with Addendum8 Jan 2026

Other filings

Other filings

3 files
Natural Conservation8 Jan 2026Superimpopsed Plan8 Jan 2026Aaganwadi and Community Hall Plans22 Oct 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

73 OF 2025 · Nowara Realty LLP · FARUKHNAGAR

Licence valid to 21 May 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 22 Oct 2025 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

73 OF 2025: 13 parcels, 8.8438 acres in all, in Farruk nagar (hadbast 35), tehsil Farrukhnagar.

The licence register prints the same licensed area, 8.8438 acres.

  • 46//11/23 kanal 17 marla
  • 46//128 kanal
  • 46//138 kanal
  • 46//14/16 kanal
Show the other 9 parcels
  • 46//14/22 kanal
  • 46//158 kanal
  • 46//38 kanal
  • 46//48 kanal
  • 46//7/14 kanal
  • 46//7/23 kanal 11 marla
  • 46//87 kanal 11 marla
  • 46//9/1/11 kanal 6 marla
  • 46//9/1/22 kanal 10 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Farruk nagar (hadbast 35), tehsil Farrukhnagar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 46//11/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

3 files
Site Plan Green and Parking22 Oct 2025Approved Site Plan22 Oct 2025Site Plan22 Oct 2025

Layout plan

1 file
Latest Layout Plan22 Oct 2025

Building plans

9 files
BR-III Nowara8 Jan 2026Tower-1 TO7 Section22 Oct 2025Approved Building Plans, Full Set22 Oct 2025Tower-1TO 4 Typical Floor and Terrace Plan22 Oct 2025Tower-8 Typical Floor Plans and Terrace Plans22 Oct 2025Tower-6 Elevation Section22 Oct 2025

Floor plans

8 files
Tower-7 Typical Floor Plans22 Oct 2025Tower-1 to 4 Ground Floor Plan22 Oct 2025First Floor Plan Tower-422 Oct 2025Tower-8 Ground and First Floor Plan22 Oct 2025Tower-5,6&7 Typical Floor Plans22 Oct 2025Unit Deatils22 Oct 2025

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (77 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3607 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Nowara Realty

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.