OMPEE TOWER
by Ompee Construction · Gurugram
Not on our price list yet
Possession 7 Aug 2028 · as the developer declared it to HARERA
About this project
Key facts
- 8 Aug 2023Building plans approveddeclared to HARERA, read 29 Oct 2026
- 7 Aug 2028Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- 1,000–1,500 sq ft1,012–1,023 sq ft60
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Roads1,521 m² · 38%
- Parking1,234 m² · 31%
- Apartment buildings625 m² · 16%
- Green belts600 m² · 15%
- Other usesas the form names them: Convenient20 m² · under 1%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- KitchenSingle lever counter top
- Kitchen appliancesSingle lever counter top
- Lifts2lifts
- FloorsVitrified tile, laminate wooden flooring
- WallsPremium acrylic distemper
- BathroomsChinaware , single lever counter top
- WindowsFull height windows- aluminium poder coated sections
- Main doorWooden frame with flush door with veneer finish (on both sides) & architraves
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
Bhumiq holds no map point for this project yet.The site address declared to HARERA: GURUGRAM, HARYANA
The builder
- Registered, no OC or CC yet: 1
Questions buyers ask
Is OMPEE TOWER registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/749/481/2023/93. Valid to 7 Aug 2028.
The source ↗What is the possession timeline for OMPEE TOWER?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 7 Aug 2028. Its registration runs to 7 Aug 2028; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around OMPEE TOWER?From the records · HARERA, read 4 Nov 2026
OMPEE TOWER is in Gurugram; the site address declared to HARERA is Gurugram, Haryana. Bhumiq has not measured its distance to the main roads and metro lines yet.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building OMPEE TOWER?From the records · HARERA, read 4 Nov 2026
OMPEE TOWER is a Ompee Construction project.
The source ↗Ompee Construction's projects and court recordThe records
What the registers hold for OMPEE TOWER: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/749/481/2023/93: Registered. Valid to 7 Aug 2028.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Plans approved, as the developer declared: building plans 8 Aug 2023.Declared to HARERA, read 29 Oct 2026
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 46 HARERA files, with the dates we read them
- Registration no.
- GGM/749/481/2023/93
- Registration valid till
- 7 Aug 2028
- Declared possession
- 7 Aug 2028
Declared by the promoter to HARERA
- Land area
- 4000 (Sqr/mtrs)
- FAR
- the application prints 174.96, which is not a ratio
- licence
- Promoter was allotted the Group housing site Area Admeasuring 4000 Sqmts at Gh-36, Sector-1, Industrial Model Township, Mansar, District Gurugram, Ref no. HSIIDC C and H 2022 5813 DATED 05/09/2022 for Development of Residential Group housing from Haryana State Industrial and Infrastructure Development Corporation Ltd
- Estimated project cost
- ₹59.84 crore
- Cost of land
- ₹17.37 crore
- Building plans, declared approved
- 8 Aug 2023
- Construction to start
- 1 Nov 2023
- Completion declared for
- 7 Aug 2028
Declared inventory · 2 types
Declared inventory
- Apartment/Shops/Other Buildings · 36 units · 94 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 24 units · 95 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 2
Statutory approvals, as declared
- I. BUILDING PLAN APPROVAL (MEMO NO. HSIIDC/IPD/IMT/M/2023/744 — declared: already been obtained (8 Aug 2023)
- II. NOC FROM AIRPORT AUTHORITY (SI/RHQ/NR/ATS/LOC/2023/469/2099-2102 — declared: already been obtained (13 Jul 2023)
On file with HARERA · 46 files
On file with HARERA (46)
Plans
Site plan
2 filesLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
8 filesFloor plans
17 filesServices
Service plans
1 fileApprovals and clearances
DTCP licence
2 filesOther NOCs and clearances
2 filesLand records
Land records
1 fileSales papers
Allotment and sale agreements
1 fileMoney
Accounts and finance
3 filesThe promoter’s papers
Declarations and affidavits
3 filesOther filings
Other filings
3 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
The promoter declared Promoter was allotted the Group housing site Area Admeasuring 4000 Sqmts at Gh-36, Sector-1, Industrial Model Township, Mansar, District Gurugram, Ref no. HSIIDC C and H 2022 5813 DATED 05/09/2022 for Development of Residential Group housing from Haryana State Industrial and Infrastructure Development Corporation Ltd. We could not read a licence number from that, so nothing is claimed about it here.
declared in the registration application (Form REP-I), Gurugram bench · submitted 25 Aug 2023 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
2 filesLayout plan
1 fileBuilding plans
8 filesFloor plans
17 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (46 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/2591 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Ompee Construction
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.