Skip to content

Primera (Tower A to D) + EWS

by Ramprastha Promoters and Developers · Sector 37D, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 37D, Gurugram0.8 km from Dwarka Expressway, in a straight line
Registered
23 Oct 2018
Registered by
RAMPRASTHA PROMOTERS AND DEVELOPERS PVT. LTD.the company that filed it, for Ramprastha Promoters and Developers
Timeline
  1. 25 Jan 2013Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 23 Oct 2018Registered with HARERAHARERA, read 4 Nov 2026
  3. 30 Sep 2025Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside15,896 m² in all, by use
  • Parks and playgrounds6,394 m² · 40%
  • Roads2,633 m² · 17%
  • Other usesas the form names them: EWS (homes for economically weaker sections)2,604 m² · 16%
  • Apartment buildings2,109 m² · 13%
  • Club house1,200 m² · 8%
  • Sewage and waste treatment707 m² · 4%
  • Electricity sub-station249 m² · 2%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningSplit AC
  • Lifts2 NOS of lift - each tower
  • FloorsMaster bedroom - laminated wooden flooring living/dining/lobby & other bedroom - vitrified tiles, balconies/terraces - anti skid tiles, kitchen & toilets - anti skid tiles
  • WallsLiving/dining/lobby/bedrooms - acrylic emulsions, balconies/terraces - acrylic emulsion/ weatherproof paint. kitchen & toilets - combination of ceramic tiles
  • BathroomsCP fittings/white chinaware
  • WindowsUPVC
  • Main doorHardwood door frames veneered & polished/SKIN moulded shutters/flush door shutter
  • Electrical fittingsSplit AIR-conditioners in all bedrooms, drawings & dining, modular type switches & sockets, copper wiring.

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 37D, GurugramSector 37D, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.8 km
  • Delhi–Gurugram–SNB RRTS4.0 km
  • Sohna Elevated Corridor (NH-248A)6.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 4 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2
  • Other register states: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Primera (Tower A to D) + EWS registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/289/2018/21, registered on 23 Oct 2018. Ended 30 Sep 2025. The register shows it as: Registration expired.

The source ↗
How is the connectivity around Primera (Tower A to D) + EWS?From the records · Map pin and road lines, read 6 Sep 2026

Primera (Tower A to D) + EWS is in Sector 37D, Gurugram; the site address declared to HARERA is Sector 37-D, Gurugram. In a straight line it is about 0.8 km from Dwarka Expressway, 4.0 km from Delhi–Gurugram–SNB RRTS and 6.3 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Primera (Tower A to D) + EWS?From the records · HARERA, read 4 Nov 2026

Primera (Tower A to D) + EWS is a Ramprastha Promoters and Developers project, registered by its company RAMPRASTHA PROMOTERS AND DEVELOPERS PVT. LTD..

The source ↗Ramprastha Promoters and Developers's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Primera (Tower A to D) + EWS: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/289/2018/21: Registration expired. Ended 30 Sep 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 12 OF 2009 is on the DTCP register: Licence lapsed; the register prints its validity to 20 May 2024.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 25 Jan 2013, building plans 25 Jan 2013.Declared to HARERA, read 29 Oct 2026
The court record of Ramprastha Promoters and Developers’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 30 Sep 2025. HARERA Gurugram, read 4 Nov 2026. Source

  • Red flag: Licence 12 OF 2009 lapsed

    Named in this project’s application. Valid to 20 May 2024; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 18 HARERA files, with the dates we read them
Registration no.
GGM/289/2018/21
Registration date
23 Oct 2018
Registration valid till
30 Sept 2025

Declared by the promoter to HARERA

Land area
15788.9 (Sqr/mtrs)
FAR
the application prints 173, which is not a ratio
licence
12 of 2009
Estimated project cost
₹228.47 crore
Cost of land
₹5.18 crore
Layout plan, declared approved (field 5a)
25 Jan 2013
Building plans, declared approved
25 Jan 2013
Declared inventory · 3 types

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK WITH STORE,WITHOUT STORE, 3BHK WITH DRESS · 368 units · 43,440 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type EWS · 119 units · 1,934 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type SHOPS · 6 units · 22.68 sq m carpet · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 10

Statutory approvals, as declared

  • I. ENVIRONMENTAL CLEARANCE — declared: already been obtained (30 Jun 2014)
  • II. CONSENT TO ESTABLISH — declared: already been obtained (28 Feb 2019)
  • III. ARAVALI NOC — declared: already been obtained (3 Dec 2013)
  • IV. FOREST NOC — declared: already been obtained (7 Nov 2013)
  • V. WATER ASSURANCE — declared: already been obtained (11 Dec 2013)
  • VI. FIRE SCHEME APPROVAL RECEIPT — declared: already been obtained (3 Jun 2019)
  • VII. HEIGHT CLEARANCE — declared: already been obtained (20 Feb 2019)
  • VIII. BUILDING PLAN BR III — declared: already been obtained (25 Apr 2013)
  • IX. REVISED BUILDING PLAN APPROVAL BR III — declared: already been obtained (13 Mar 2019)
  • X. LICENCE RENEWAL — declared: applied for but yet to receive (20 May 2019)
On file with HARERA · 18 files

On file with HARERA (18)

Plans

Site plan

1 file
Approved Site Plan3 Sept 2019

Layout plan

1 file
Latest Layout Plan5 Sept 2019

Zoning plan

1 file
Zoning Plan5 Sept 2019

Demarcation plan

1 file
Demarcation Plan5 Sept 2019

Building plans

3 files
Approved Building Plans, Full Set16 Sept 2019Approved Building Plans, Full Set16 Sept 2019Approved Building Plans, Full Set16 Sept 2019

Services

Service plans

1 file
Service Plans on the Layout5 Sept 2019

Approvals and clearances

Occupation certificate (OC)

3 files
OC uploaded15 Apr 2024OC uploaded for tower A, B, C,D EWS bloack, commercial shoping etc8 Aug 2023OC uploaded8 Aug 2023

DTCP licence

1 file
Licence Copy with Land Schedule6 Sept 2019

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration6 Sept 2019

Money

Accounts and finance

3 files
CA Certificate on the Application’s Figures18 Sept 2019Cash Flow Statement17 Sept 2019Non-Default Certificate from a CA16 Sept 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit17 Sept 2019

HARERA’s orders

HARERA’s orders

1 file
Extension No. RC/REP/HARERA/GGM/21 of 2018/7(3)/2022/1 Dated: 21.07.202222 Aug 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

12 OF 2009 · SA Infratech · GURGAON-MANESAR

Licence valid to 20 May 2024

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 18 Sept 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

12 OF 2009: 7 parcels, 13.1563 acres in all, in Garauli kalan (hadbast 48), tehsil Kadipur.

The licence register prints the same licensed area, 13.16 acres.

  • rectangle 223, kila 2233 bigha
  • rectangle 224, kila 2243 bigha
  • rectangle 218, kila 2182 bigha 9 biswa
  • rectangle 219, kila 2193 bigha 12 biswa
Show the other 3 parcels
  • rectangle 267, kila 267/13 bigha 6 biswa
  • rectangle 267, kila 267/13 bigha 6 biswa
  • rectangle 268, kila 268/12 bigha 8 biswa

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Garauli kalan (hadbast 48), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as rectangle 223, kila 223.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹6,500 per sq ft

this sector, collector rates effective 1 Apr 2026, Kadipur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan3 Sept 2019

Layout plan

1 file
Latest Layout Plan5 Sept 2019

Building plans

3 files
Approved Building Plans, Full Set16 Sept 2019Approved Building Plans, Full Set16 Sept 2019Approved Building Plans, Full Set16 Sept 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (18 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/814 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Ramprastha Promoters and Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.