Primera (Tower A to D) + EWS
by Ramprastha Promoters and Developers · Sector 37D, Gurugram
Not on our price list yet
About this project
Key facts
- Location
- Sector 37D, Gurugram0.8 km from Dwarka Expressway, in a straight line
- Registered by
- RAMPRASTHA PROMOTERS AND DEVELOPERS PVT. LTD.the company that filed it, for Ramprastha Promoters and Developers
- 25 Jan 2013Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 23 Oct 2018Registered with HARERAHARERA, read 4 Nov 2026
- 30 Sep 2025Registration valid toHARERA, read 4 Nov 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Parks and playgrounds6,394 m² · 40%
- Roads2,633 m² · 17%
- Other usesas the form names them: EWS (homes for economically weaker sections)2,604 m² · 16%
- Apartment buildings2,109 m² · 13%
- Club house1,200 m² · 8%
- Sewage and waste treatment707 m² · 4%
- Electricity sub-station249 m² · 2%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningSplit AC
- Lifts2 NOS of lift - each tower
- FloorsMaster bedroom - laminated wooden flooring living/dining/lobby & other bedroom - vitrified tiles, balconies/terraces - anti skid tiles, kitchen & toilets - anti skid tiles
- WallsLiving/dining/lobby/bedrooms - acrylic emulsions, balconies/terraces - acrylic emulsion/ weatherproof paint. kitchen & toilets - combination of ceramic tiles
- BathroomsCP fittings/white chinaware
- WindowsUPVC
- Main doorHardwood door frames veneered & polished/SKIN moulded shutters/flush door shutter
- Electrical fittingsSplit AIR-conditioners in all bedrooms, drawings & dining, modular type switches & sockets, copper wiring.
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Dwarka ExpresswayOpen, 17 Aug 20250.8 km
- Delhi–Gurugram–SNB RRTS4.0 km
- Sohna Elevated Corridor (NH-248A)6.3 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 2
- Other register states: 2
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
No photo of the project on file yet | Signatureglobal Developers | Same sector | — | — | 28 Feb 2026 |
| BPTP | Same sector | — | — | 31 Jul 2020 | |
No photo of the project on file yet | Sternal Buildcon | Same sector | — | — | 31 Dec 2024 |
The Millennia-2No photo on file yet | Sarvpriya Securities | Same sector | — | — | 29 Feb 2024 |
| Signature Global | Same sector | New launch | ₹15,950/sq ft | 31 Dec 2032 | |
No photo of the project on file yet | Signatureglobal Developers | Same sector | — | — | 31 Jan 2027 |
No photo of the project on file yet | Signatureglobal Developers | Same sector | — | — | 31 Jan 2027 |
| Signature Global | Same sector | Under construction | ₹16,000/sq ft | 31 Mar 2031 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is Primera (Tower A to D) + EWS registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/289/2018/21, registered on 23 Oct 2018. Ended 30 Sep 2025. The register shows it as: Registration expired.
The source ↗How is the connectivity around Primera (Tower A to D) + EWS?From the records · Map pin and road lines, read 6 Sep 2026
Primera (Tower A to D) + EWS is in Sector 37D, Gurugram; the site address declared to HARERA is Sector 37-D, Gurugram. In a straight line it is about 0.8 km from Dwarka Expressway, 4.0 km from Delhi–Gurugram–SNB RRTS and 6.3 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building Primera (Tower A to D) + EWS?From the records · HARERA, read 4 Nov 2026
Primera (Tower A to D) + EWS is a Ramprastha Promoters and Developers project, registered by its company RAMPRASTHA PROMOTERS AND DEVELOPERS PVT. LTD..
The source ↗Ramprastha Promoters and Developers's projects and court recordWhat protections do I have as a buyer?General guidance
Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.
The records
What the registers hold for Primera (Tower A to D) + EWS: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/289/2018/21: Registration expired. Ended 30 Sep 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 12 OF 2009 is on the DTCP register: Licence lapsed; the register prints its validity to 20 May 2024.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 25 Jan 2013, building plans 25 Jan 2013.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 18 HARERA files, with the dates we read them
- Registration no.
- GGM/289/2018/21
- Registration date
- 23 Oct 2018
- Registration valid till
- 30 Sept 2025
Declared by the promoter to HARERA
- Land area
- 15788.9 (Sqr/mtrs)
- FAR
- the application prints 173, which is not a ratio
- licence
- 12 of 2009
- Estimated project cost
- ₹228.47 crore
- Cost of land
- ₹5.18 crore
- Layout plan, declared approved (field 5a)
- 25 Jan 2013
- Building plans, declared approved
- 25 Jan 2013
Declared inventory · 3 types
Declared inventory
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK WITH STORE,WITHOUT STORE, 3BHK WITH DRESS · 368 units · 43,440 sq m carpet
- APARTMENT/SHOPS/OTHER BUILDINGS Type EWS · 119 units · 1,934 sq m carpet
- APARTMENT/SHOPS/OTHER BUILDINGS Type SHOPS · 6 units · 22.68 sq m carpet · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 10
Statutory approvals, as declared
- I. ENVIRONMENTAL CLEARANCE — declared: already been obtained (30 Jun 2014)
- II. CONSENT TO ESTABLISH — declared: already been obtained (28 Feb 2019)
- III. ARAVALI NOC — declared: already been obtained (3 Dec 2013)
- IV. FOREST NOC — declared: already been obtained (7 Nov 2013)
- V. WATER ASSURANCE — declared: already been obtained (11 Dec 2013)
- VI. FIRE SCHEME APPROVAL RECEIPT — declared: already been obtained (3 Jun 2019)
- VII. HEIGHT CLEARANCE — declared: already been obtained (20 Feb 2019)
- VIII. BUILDING PLAN BR III — declared: already been obtained (25 Apr 2013)
- IX. REVISED BUILDING PLAN APPROVAL BR III — declared: already been obtained (13 Mar 2019)
- X. LICENCE RENEWAL — declared: applied for but yet to receive (20 May 2019)
On file with HARERA · 18 files
On file with HARERA (18)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
3 filesServices
Service plans
1 fileApprovals and clearances
Occupation certificate (OC)
3 filesDTCP licence
1 fileLand records
Land records
1 fileMoney
Accounts and finance
3 filesThe promoter’s papers
Declarations and affidavits
1 fileHARERA’s orders
HARERA’s orders
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
12 OF 2009 · SA Infratech · GURGAON-MANESAR
Licence valid to 20 May 2024
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 18 Sept 2019 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
12 OF 2009: 7 parcels, 13.1563 acres in all, in Garauli kalan (hadbast 48), tehsil Kadipur.
The licence register prints the same licensed area, 13.16 acres.
- rectangle 223, kila 2233 bigha
- rectangle 224, kila 2243 bigha
- rectangle 218, kila 2182 bigha 9 biswa
- rectangle 219, kila 2193 bigha 12 biswa
Show the other 3 parcels
- rectangle 267, kila 267/13 bigha 6 biswa
- rectangle 267, kila 267/13 bigha 6 biswa
- rectangle 268, kila 268/12 bigha 8 biswa
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Garauli kalan (hadbast 48), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as rectangle 223, kila 223.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
- Collector rate, residential flat
- ₹6,500 per sq ft
this sector, collector rates effective 1 Apr 2026, Kadipur tehsil. Source
Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.
Worked out on this page. Not saved or sent.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
3 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (18 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/814 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Ramprastha Promoters and Developers
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

