PROSPERITY HOMES

by Adore Buildcon · Gurugram

Not on our price list yet

Possession 14 Jun 2029 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Carpet area
326–612 sq ft
In m²about 30–57 m², as declared
Registered by
ADORE BUILDCON LLPthe company that filed it, for Adore Buildcon
Timeline
  1. 27 May 2024Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 14 Jun 2029Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

843homes, 326 to 612 sq ft of carpet area
  • Under 1,000 sq ft326–612 sq ft843

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside6.769 acres in all, by use
  • Apartment buildings2.877 acres · 43%
  • Roads2.566 acres · 38%
  • Parks and playgrounds0.988 acres · 15%
  • Other uses0.234 acres · 3%
  • Electricity sub-station0.103 acres · 2%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenCounter top - marble top/ KOTA stone, tile up to 2 FEET height above the counter
  • Kitchen appliancesISI marked
  • Lifts2 lift in each tower
  • FloorsVitrified tiles/ceramic tiles
  • WallsColour WASH/dry distemper/ oil bound distemper (OBD)
  • BathroomsPPR pipes/ CPVC pipes, CP fitting OD ISI marked
  • WindowsMS Z section / press steel/ power coated aluminum
  • Main doorFlush door painted with FLAT enamel paint

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: VILLAGE SOHNA, SECTOR 02 & 35

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Questions buyers ask

Is PROSPERITY HOMES registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/857/589/2024/84. Valid to 14 Jun 2029.

The source ↗
What is the possession timeline for PROSPERITY HOMES?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 14 Jun 2029. Its registration runs to 14 Jun 2029; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around PROSPERITY HOMES?From the records · HARERA, read 4 Nov 2026

PROSPERITY HOMES is in Gurugram; the site address declared to HARERA is Village Sohna, Sector 02 & 35. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building PROSPERITY HOMES?From the records · HARERA, read 4 Nov 2026

PROSPERITY HOMES is a Adore Buildcon project, registered by its company ADORE BUILDCON LLP.

The source ↗Adore Buildcon's projects and court record

The records

What the registers hold for PROSPERITY HOMES: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/857/589/2024/84: Registered. Valid to 14 Jun 2029.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 51 OF 2024 is on the DTCP register, valid to 14 Mar 2029.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 27 May 2024.Declared to HARERA, read 29 Oct 2026
The court record of Adore Buildcon’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 47 HARERA files, with the dates we read them
Registration no.
GGM/857/589/2024/84
Registration valid till
14 Jun 2029
Declared possession
14 Jun 2029

Declared by the promoter to HARERA

Land area
6.76875 (Acre) (27,392.16 sq m)
FAR
the application prints 227.97, which is not a ratio
licence
License No 51 of 2024 dated 15 03 2024
Estimated project cost
₹216.67 crore
Cost of land
₹61.05 crore
Building plans, declared approved
27 May 2024
Construction to start
1 Oct 2024
Completion declared for
14 Jun 2029
Declared inventory · 5 types

Declared inventory

  • Apartment/Shops/Other Buildings · 74 units · 56.72 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 586 units · 56.848 sq m carpet · 9 towers · one flat
  • Apartment/Shops/Other Buildings · 8 units · 43.838 sq m carpet · 8 towers · one flat
  • Apartment/Shops/Other Buildings · 74 units · 30.26 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 101 units · 30.35 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 5

Statutory approvals, as declared

  • I. LICENSE NO 51 OF 2024 — declared: already been obtained (15 Mar 2024)
  • II. ZONING PLAN — declared: already been obtained (15 Mar 2024)
  • III. DEMARCATION PLAN — declared: already been obtained (16 Feb 2024)
  • IV. BUILDING PLAN — declared: already been obtained (27 May 2024)
  • V. ENVIRONMENTAL CLEARANCE — declared: applied for but yet to receive (8 Jul 2024)
On file with HARERA · 47 files

On file with HARERA (47)

Plans

Site plan

1 file
Approved Site Plan2 Aug 2024

Layout plan

1 file
Latest Layout Plan11 Jun 2024

Zoning plan

1 file
Zoning Plan2 Aug 2024

Demarcation plan

1 file
Demarcation Plan2 Aug 2024

Building plans

11 files
Terrace Plan 22 Aug 2024BR-III2 Aug 2024Tower 5 Elevation2 Aug 2024

Floor plans

5 files
Unit Plan 12 Aug 2024Unit Plan2 Aug 2024Basement Plan 22 Aug 2024

Services

Sewerage and drainage

3 files
Strom Water Line Assurance2 Aug 2024STP Treated Water Assurance2 Aug 2024Sewerage Connection Assurance2 Aug 2024

Water supply

1 file
Fresh Water Assurance2 Aug 2024

Service plans

2 files
Service Estimate Application2 Aug 2024Service Plans on the Layout11 Jun 2024

Approvals and clearances

DTCP licence

3 files
Licence Copy with Land Schedule2 Aug 2024LOI2 Aug 2024LC IV2 Aug 2024

Other NOCs and clearances

4 files
Airport NOC2 Aug 2024NOC DHBVN2 Aug 2024NOC from Lender2 Aug 2024Forest NOC2 Aug 2024

Land records

Land records

4 files
Jamabandi2 Aug 2024Non- Encumbrance Certificate2 Aug 2024Revenue Record Entry of Licence and Collaboration2 Aug 2024Title Search Report2 Aug 2024

Money

Accounts and finance

5 files
Certificate Cost Incured2 Aug 2024Non-Default Certificate from a CA2 Aug 2024CA Certificate Project Cost New2 Aug 2024

Timeline and progress

Construction schedule

2 files
PERT Chart and Fund Flow2 Aug 2024PERT Chart2 Aug 2024

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit2 Aug 2024

Company papers

2 files
Coi - ACB1526 - Adore Buildcon LLP2 Aug 2024Board Resolution2 Aug 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

51 OF 2024 · Adore Buildcon LLP · SOHNA

Licence valid to 14 Mar 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 11 Jun 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

51 OF 2024: 10 parcels, 6.7688 acres in all, in Sohna (hadbast 187), tehsil Sohna.

The licence register prints the same licensed area, 6.7688 acres.

  • 28//187 kanal 17 marla
  • 28//183 marla
  • 28//13/16 kanal 14 marla
  • 28//13/21 kanal 6 marla
Show the other 6 parcels
  • 28//175 kanal 6 marla
  • 28//198 kanal
  • 28//20/12 kanal 2 marla
  • 28//248 kanal
  • 40//38 kanal
  • 28//236 kanal 15 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Sohna (hadbast 187), tehsil Sohna. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 28//18.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan2 Aug 2024

Layout plan

1 file
Latest Layout Plan11 Jun 2024

Building plans

11 files
Terrace Plan 22 Aug 2024BR-III2 Aug 2024Tower 5 Elevation2 Aug 2024Elevation Tower 102 Aug 2024Commercial Block A Elevation2 Aug 2024Commercial Terrace Plan2 Aug 2024

Floor plans

5 files
Unit Plan 12 Aug 2024Unit Plan2 Aug 2024Basement Plan 22 Aug 2024Basement Plan 12 Aug 2024Basement Plan 32 Aug 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (47 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2972 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Adore Buildcon

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.