Skip to content

ROF ABODE

by Chirag Buildtec · Sonipat

Not on our price list yet

Possession 31 Dec 2032 · as the developer declared it to HARERA

About this project

Key facts

Carpet area
371–646 sq ft
In m²about 34–60 m², as declared
Land
42973.368 (Sqr/mtrs)
Registered by
CHIRAG BUILDTEC PRIVATE LIMITEDthe company that filed it, for Chirag Buildtec
Timeline
  1. 18 Sep 2026Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Dec 2032Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

732homes, 371 to 646 sq ft of carpet area
  • Under 1,000 sq ft371–646 sq ft732

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 23 rows of a single unit, because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • KitchenCeramic tiles up to 2 FT above counter, OBD elsewhere vermora or equivalent
  • LiftsPassenger lifts,10-passenger lift, speed of lifts are typically1.0 M/S to 1.5 M/S
  • FloorsVitrified tiles vermora or equivalent
  • WallsAcrylic emulsion / OBD or asian or equivalent
  • BathroomsStandard CP fittings and white sanitary WARE CERA or equivalent
  • WindowsAlluminium/UPVC glazing
  • Main doorWooden flush door ISI MARK or equivalent
  • Electrical fittingsModular switches, sufficient light/power points ISI MARK or equivalent

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR-91, SONIPAT

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 1

Questions buyers ask

Is ROF ABODE registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as HRERA-PKL-SNP-1001-2026. Valid to 31 Dec 2032.

The source ↗
What is the possession timeline for ROF ABODE?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2032. Its registration runs to 31 Dec 2032; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ROF ABODE?From the records · HARERA, read 4 Nov 2026

ROF ABODE is in Sonipat; the site address declared to HARERA is Sector-91, Sonipat. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ROF ABODE?From the records · HARERA, read 4 Nov 2026

ROF ABODE is a Chirag Buildtec project, registered by its company CHIRAG BUILDTEC PRIVATE LIMITED.

The source ↗Chirag Buildtec's projects and court record

The records

What the registers hold for ROF ABODE: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration HRERA-PKL-SNP-1001-2026: Registered. Valid to 31 Dec 2032.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 131 OF 2026 is on the DTCP register, valid to 6 Jul 2031.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 18 Sep 2026, building plans 18 Sep 2026.Declared to HARERA, read 29 Oct 2026
The court record of Chirag Buildtec’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 12 HARERA files, with the dates we read them
Registration no.
HRERA-PKL-SNP-1001-2026
Registration valid till
31 Dec 2032
Declared possession
31 Dec 2032

Declared by the promoter to HARERA

Land area
42973.368 (Sqr/mtrs)
FAR
2.4 proposed of 2.4 permissible
licence
131 of 2026 dated 07-07-2026
Estimated project cost
₹221.18 crore
Cost of land
₹27.49 crore
Layout plan, declared approved (field 5a)
18 Sept 2026
Building plans, declared approved
18 Sept 2026
Construction to start
1 Oct 2026
Completion declared for
31 Dec 2032
Declared inventory · 33 types

Declared inventory — 33 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 354 units · 48.547 sq m carpet · 5 towers · one flat
  • Apartment/Shops/Other Buildings · 36 units · 59.991 sq m carpet · 5 towers · one flat
  • Apartment/Shops/Other Buildings · 319 units · 59.991 sq m carpet · 5 towers · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 29.75 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 33.29 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 36.46 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 40.15 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 31.4 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 2

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (7 Jul 2026)
  • II. BUILDING PLANS — declared: already been obtained (18 Sept 2026)
On file with HARERA · 12 files

On file with HARERA (12)

Plans

Site plan

1 file
Approved Site Plan21 Sept 2026

Layout plan

1 file
Latest Layout Plan21 Sept 2026

Zoning plan

1 file
Zoning Plan21 Sept 2026

Demarcation plan

1 file
Demarcation Plan21 Sept 2026

Building plans

1 file
Approved Building Plans, Full Set21 Sept 2026

Services

Service plans

1 file
Service Plans on the Layout21 Sept 2026

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule18 Sept 2026

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration21 Sept 2026

Money

Accounts and finance

3 files
Cash Flow Statement23 Sept 2026CA Certificate on the Application’s Figures22 Sept 2026Non-Default Certificate from a CA22 Sept 2026

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit23 Sept 2026

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

131 OF 2026 · Chirag Buildtec Private Limited · Sonipat

Licence valid to 6 Jul 2031

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Panchkula bench · submitted 24 Sept 2026 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/1 · fetched 4 Nov 2026

Land under the licence

131 OF 2026

DTCP’s page showed no land schedule for licence 131 OF 2026 when Bhumiq read it on 25 Oct 2026. verify at source

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan21 Sept 2026

Layout plan

1 file
Latest Layout Plan21 Sept 2026

Building plans

1 file
Approved Building Plans, Full Set21 Sept 2026

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (12 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/4275 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Chirag Buildtec

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Panchkula records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.