ROF NORMANTON MALL

by ROF Housing & Infrastructure · Gurugram

Not on our price list yet

Possession 31 Dec 2026 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Carpet area
278–493 sq ft
In m²about 26–46 m², as declared
Registered by
ROF INFRATECH AND HOUSING PRIVATE LIMITEDthe company that filed it, for ROF Housing & Infrastructure
Timeline
  1. 15 Nov 2021Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 13 Apr 2023Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 31 Dec 2026Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

52homes, 278 to 493 sq ft of carpet area
  • Under 1,000 sq ft278–493 sq ft52

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 2 rows of a single unit and 200 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • KitchenTile / marble / granite, paint
  • Lifts8 passanger (thyssenkrupp / johnson / OTIS or equivalent )
  • FloorsTile (vitrified and ceramic)
  • WallsCement / gypsum plaster, paint
  • BathroomsCERA / hindware or equivalent
  • WindowsAluminium frame and toghened glass
  • Main doorFlush door
  • Electrical fittingsISI marked

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR-36, SOHNA

The builder

Its 6 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 4
  • Other register states: 1

Questions buyers ask

Is ROF NORMANTON MALL registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/744/476/2023/88. Valid to 31 Dec 2026.

The source ↗
What is the possession timeline for ROF NORMANTON MALL?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2026. Its registration runs to 31 Dec 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ROF NORMANTON MALL?From the records · HARERA, read 4 Nov 2026

ROF NORMANTON MALL is in Gurugram; the site address declared to HARERA is Sector-36, Sohna. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ROF NORMANTON MALL?From the records · HARERA, read 4 Nov 2026

ROF NORMANTON MALL is a ROF Housing & Infrastructure project, registered by its company ROF INFRATECH AND HOUSING PRIVATE LIMITED.

The source ↗ROF Housing & Infrastructure's projects and court record

The records

What the registers hold for ROF NORMANTON MALL: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/744/476/2023/88: Registered. Valid to 31 Dec 2026.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Plans approved, as the developer declared: layout plan 15 Nov 2021, building plans 13 Apr 2023.Declared to HARERA, read 29 Oct 2026
The court record of ROF Housing & Infrastructure’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration ends soon

    Valid to 31 Dec 2026. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 14 HARERA files, with the dates we read them
Registration no.
GGM/744/476/2023/88
Registration valid till
31 Dec 2026
Declared possession
31 Dec 2026

Declared by the promoter to HARERA

Land area
14.775 (Acre) (59,792.3 sq m)
FAR
1.87 proposed of 1.87 permissible
licence
LC-4523-24/08/2021
Estimated project cost
₹40.64 crore
Cost of land
₹23.40 crore
Layout plan, declared approved (field 5a)
15 Nov 2021
Building plans, declared approved
13 Apr 2023
Construction to start
1 May 2023
Completion declared for
31 Dec 2026
Declared inventory · 39 types

Declared inventory — 39 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 8 units · 6.1 sq m carpet · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 45 units · 45.83 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 2 units · 7.68 sq m carpet · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 1 unit · 392.05 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 26.08 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 10 units · 22.16 sq m carpet · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 1 unit · 22.77 sq m carpet · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 2 units · 21.63 sq m carpet · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 3

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (12 Nov 2021)
  • II. LETTER OF INTENT — declared: already been obtained (24 Aug 2021)
  • III. ZONING PLAN — declared: already been obtained (13 Apr 2022)
On file with HARERA · 14 files

On file with HARERA (14)

Plans

Site plan

1 file
Approved Site Plan5 May 2023

Layout plan

1 file
Latest Layout Plan5 May 2023

Zoning plan

2 files
Commercial Zoning Plan8 May 2023Zoning Plan5 May 2023

Demarcation plan

1 file
Demarcation Plan5 May 2023

Building plans

1 file
Approved Building Plans, Full Set5 May 2023

Services

Service plans

1 file
Service Plans on the Layout5 May 2023

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule4 Jan 2023

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration5 May 2023

Money

Accounts and finance

4 files
Approval for Change of Bank Account5 Dec 2025Cash Flow Statement5 May 2023CA Certificate on the Application’s Figures5 May 2023Non-Default Certificate from a CA5 May 2023

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit5 May 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared LC-4523-24/08/2021. We could not read a licence number from that, so nothing is claimed about it here.

declared in the registration application (Form REP-I), Gurugram bench · submitted 8 May 2023 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan5 May 2023

Layout plan

1 file
Latest Layout Plan5 May 2023

Building plans

1 file
Approved Building Plans, Full Set5 May 2023

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (14 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2279 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on ROF Housing & Infrastructure

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.