SAPPHIRE RESIDENCES

by Summit Terracraft · Gurugram

Not on our price list yet

Possession 30 Apr 2029 · as the developer declared it to HARERA

About this project

Key facts

Location
Gurugram
Carpet area
1,250–1,264 sq ft
In m²about 116–117 m², as declared
Registered by
SUMMIT TERRACRAFT PVT. LTDthe company that filed it, for Summit Terracraft
Timeline
  1. 5 Dec 2023Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Apr 2029Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 31 May 2029Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

116homes, 1,250 to 1,264 sq ft of carpet area
  • 1,000–1,500 sq ft1,250–1,264 sq ft116

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 21 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside2.447 acres in all, by use
  • Apartment buildings0.819 acres · 33%
  • Roads0.579 acres · 24%
  • Pavements0.41 acres · 17%
  • Parks and playgrounds0.384 acres · 16%
  • Other usesas the form names them: Community centre0.255 acres · 10%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenTiles
  • LiftsJohnson control or equivalent
  • WardrobesPLY / wooden
  • FloorsImported marble / vetrified tile
  • WallsPANT / cladd ING / panelling
  • BathroomsStainless steel
  • WindowsAluminium with 6MM toughened glass
  • Main doorVeener finish laqured polish

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR 15 PART 2

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Questions buyers ask

Is SAPPHIRE RESIDENCES registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/784/516/2024/11. Valid to 31 May 2029.

The source ↗
What is the possession timeline for SAPPHIRE RESIDENCES?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Apr 2029. Its registration runs to 31 May 2029; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around SAPPHIRE RESIDENCES?From the records · HARERA, read 4 Nov 2026

SAPPHIRE RESIDENCES is in Gurugram; the site address declared to HARERA is Sector 15 Part 2. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building SAPPHIRE RESIDENCES?From the records · HARERA, read 4 Nov 2026

SAPPHIRE RESIDENCES is a Summit Terracraft project, registered by its company SUMMIT TERRACRAFT PVT. LTD.

The source ↗Summit Terracraft's projects and court record

The records

What the registers hold for SAPPHIRE RESIDENCES: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/784/516/2024/11: Registered. Valid to 31 May 2029.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 77 OF 2023 is on the DTCP register, valid to 9 Apr 2028.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 5 Dec 2023, building plans 5 Dec 2023.Declared to HARERA, read 29 Oct 2026
The court record of Summit Terracraft’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 48 HARERA files, with the dates we read them
Registration no.
GGM/784/516/2024/11
Registration valid till
31 May 2029
Declared possession
30 Apr 2029

Declared by the promoter to HARERA

Land area
2.44687 (Acre) (9,902.13 sq m)
FAR
1.84 proposed of 1.84 permissible
licence
Licence No. 77 of 2023 dated 10.04.2023
Estimated project cost
₹113.09 crore
Cost of land
₹5.10 crore
Layout plan, declared approved (field 5a)
5 Dec 2023
Building plans, declared approved
5 Dec 2023
Construction to start
1 Apr 2024
Completion declared for
30 Apr 2029
Declared inventory · 3 types

Declared inventory

  • Apartment/Shops/Other Buildings · 58 units · 116.124 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 58 units · 117.395 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 21 units · 18.63 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 4

Statutory approvals, as declared

  • I. LICENCE NO. 77 OF 2023 — declared: already been obtained (10 Apr 2023)
  • II. ZONING — declared: already been obtained (11 Apr 2023)
  • III. BUILDING PLAN — declared: already been obtained (5 Dec 2023)
  • IV. EC — declared: already been obtained (29 Aug 2023)
On file with HARERA · 48 files

On file with HARERA (48)

Plans

Site plan

4 files
Approved Site Plan9 Feb 2024Site Plan & Area Calculation9 Feb 2024Site Plan with Morgage Area Details9 Feb 2024Site Plan with Services9 Feb 2024

Layout plan

1 file
Latest Layout Plan9 Feb 2024

Zoning plan

1 file
Zoning Plan9 Feb 2024

Demarcation plan

1 file
Demarcation Plan9 Feb 2024

Building plans

8 files
Elevation Tower -29 Feb 2024Sections Tower-19 Feb 2024Upper & Terrace Floor Plan with Area Calc Tower -19 Feb 2024

Floor plans

5 files
Stilt Parking Level 3 with Area Details9 Feb 2024Floor Plan with Area Detail Tower -29 Feb 2024Parking Level-1 with Details9 Feb 2024

Services

Sewerage and drainage

5 files
Assurance for Sewer Connection9 Feb 2024Assurance STP Treated Water for Construction9 Feb 2024Assurance for Storm Water Drainage9 Feb 2024

Water supply

3 files
Assurance of Supply of Potable Water9 Feb 2024Assurance Drinking Water9 Feb 2024Water Supply Layout9 Feb 2024

Electricity

1 file
DHBVN Assurance9 Feb 2024

Roads

1 file
Road Layout9 Feb 2024

Landscape and green areas

1 file
Green Area & Open Parking Area Detail9 Feb 2024

Service plans

1 file
SPE Approval Letter9 Feb 2024

Approvals and clearances

DTCP licence

4 files
LC-V9 Feb 2024LC-IV & IV-A9 Feb 2024LOI9 Feb 2024Licence Copy with Land Schedule23 Aug 2023

Environment clearance

1 file
Environment Clearance9 Feb 2024

Fire safety

1 file
Fire Scheme Approval9 Feb 2024

Other NOCs and clearances

2 files
Airport Height Clearance NOC9 Feb 2024Forest NOC9 Feb 2024

Land records

Land records

4 files
Collaboration Agreement & GPA9 Feb 2024Revenue Record Entry of Licence and Collaboration9 Feb 2024Revenue Documents9 Feb 2024Non Encumbrance Certificate9 Feb 2024

Money

Accounts and finance

1 file
Non-Default Certificate from a CA16 Feb 2024

The promoter’s papers

Declarations and affidavits

2 files
The Promoter’s Declaration on Affidavit9 Feb 2024Affidavit 42LD9 Feb 2024

Other filings

Other filings

1 file
Community Building9 Feb 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

77 OF 2023 · Summit Terracraft Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 9 Apr 2028

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 23 Aug 2023 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

77 OF 2023: 2 parcels, 2.4469 acres in all, in Gurgaon (hadbast 55), tehsil Gurgaon.

The licence register prints the same licensed area, 2.4469 acres.

  • rectangle 13421, kila 7140/1765/21 bigha 7 biswa 6 biswansi
  • rectangle 13421, kila 7140/17692 bigha 11 biswa

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Gurgaon (hadbast 55), tehsil Gurgaon. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as rectangle 13421, kila 7140/1765/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

4 files
Approved Site Plan9 Feb 2024Site Plan & Area Calculation9 Feb 2024Site Plan with Morgage Area Details9 Feb 2024Site Plan with Services9 Feb 2024

Layout plan

1 file
Latest Layout Plan9 Feb 2024

Building plans

8 files
Elevation Tower -29 Feb 2024Sections Tower-19 Feb 2024Upper & Terrace Floor Plan with Area Calc Tower -19 Feb 2024Upper & Terrace with Area Details Tower -29 Feb 2024All Level Plan Elevation Sections with Area Details(ews)9 Feb 2024BR III9 Feb 2024

Floor plans

5 files
Stilt Parking Level 3 with Area Details9 Feb 2024Floor Plan with Area Detail Tower -29 Feb 2024Parking Level-1 with Details9 Feb 2024Stilt Parking Level 2 with Area Details9 Feb 2024Typical & Upper Floor Plan with Area Calc Tower-19 Feb 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (48 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2589 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Summit Terracraft

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.