SIGNATURE GLOBAL CITY 37D

by Signatureglobal Developers · Sector 37D, Gurugram

Not on our price list yet

Possession 30 Apr 2023 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 37D, Gurugram0.8 km from Dwarka Expressway, in a straight line
Registered by
SIGNATUREGLOBAL DEVELOPERS PVT. LTD.the company that filed it, for Signatureglobal Developers
Timeline
  1. 5 Mar 2021Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Apr 2023Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 28 Apr 2025Registration valid toHARERA, read 3 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside20.588 acres in all, by use
  • Plots for sale10.066 acres · 49%
  • Roads5.75 acres · 28%
  • Land for community services, handed to the government2.061 acres · 10%
  • Green belts1.576 acres · 8%
  • Other usesas the form names them: Area0.824 acres · 4%
  • Sewage and waste treatment0.163 acres · under 1%
  • Electricity sub-station0.148 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 37D, GurugramSector 37D, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.8 km
  • Delhi–Gurugram–SNB RRTS4.0 km
  • Sohna Elevated Corridor (NH-248A)6.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 7 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 3
  • Registered, no OC or CC yet: 3
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is SIGNATURE GLOBAL CITY 37D registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/462/194/2021/30. The register’s record shows an end date of 28 Apr 2025. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for SIGNATURE GLOBAL CITY 37D?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Apr 2023. Its registration runs to 28 Apr 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around SIGNATURE GLOBAL CITY 37D?From the records · Map pin and road lines, read 6 Sep 2026

SIGNATURE GLOBAL CITY 37D is in Sector 37D, Gurugram; the site address declared to HARERA is Village Gaduli Kalan, Sector-37d, Gurugram. In a straight line it is about 0.8 km from Dwarka Expressway, 4.0 km from Delhi–Gurugram–SNB RRTS and 6.3 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building SIGNATURE GLOBAL CITY 37D?From the records · HARERA, read 3 Nov 2026

SIGNATURE GLOBAL CITY 37D is a Signatureglobal Developers project, registered by its company SIGNATUREGLOBAL DEVELOPERS PVT. LTD..

The source ↗Signatureglobal Developers's projects and court record

The records

What the registers hold for SIGNATURE GLOBAL CITY 37D: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/462/194/2021/30: Registration lapsed. The register’s record shows an end date of 28 Apr 2025.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 8 OF 2021 is on the DTCP register: Licence lapsed; the register prints its validity to 4 Mar 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 5 Mar 2021.Declared to HARERA, read 29 Oct 2026
The court record of Signatureglobal Developers’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 8 OF 2021 lapsed

    Named in this project’s application. Valid to 4 Mar 2026; the register’s note: “File Merge LC-4245 in LC-4242”. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 28 Apr 2025. HARERA Gurugram, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 28 HARERA files, with the dates we read them
Registration no.
GGM/462/194/2021/30
Registration valid till
28 Apr 2025
Declared possession
30 Apr 2023

Declared by the promoter to HARERA

Land area
20.589 (Acre) (83,320.73 sq m)
FAR
1 proposed of 1 permissible
licence
08 of 2021 Dated 05/03/2021 Endst. No. LC-4242 4245/JE(SJ)/2020/5863 Dated 08/03/2021
Estimated project cost
₹197.11 crore
Cost of land
₹99.58 crore
Layout plan, declared approved (field 5a)
5 Mar 2021
Construction to start
1 May 2021
Completion declared for
30 Apr 2023
Statutory approvals, as declared · 9

Statutory approvals, as declared

  • I. LICENSE 08 OF 2021 — declared: already been obtained (5 Mar 2021)
  • II. LAYOUT PLAN MEMO NO. DTCP — declared: already been obtained (5 Mar 2021)
  • III. WATER SUPPLY GMDA/SEW/2021/194 — declared: already been obtained (8 Apr 2021)
  • IV. SEWAGE DISPOSAL GMDA/SEW/2021/381 — declared: already been obtained (24 Mar 2021)
  • V. STP TREATED WATER GMDA/SEW/2021/387 — declared: already been obtained (24 Mar 2021)
  • VI. ELECTRICAL LOAD AVAILABILITY CH.131/DRG-PLC — declared: already been obtained (31 Mar 2021)
  • VII. FOREST NOC R6U-3PQ-RHQH — declared: already been obtained (22 Sept 2020)
  • VIII. ZONING PLAN DRG.NO-DTCP7782 — declared: already been obtained (2 Jun 2021)
  • IX. ZONING PLAN COMMERCIAL DRG.NO-DTCP7783 — declared: already been obtained (2 Jun 2021)
On file with HARERA · 28 files

On file with HARERA (28)

Plans

Site plan

1 file
Approved Site Plan2 Jun 2021

Layout plan

1 file
Latest Layout Plan18 May 2021

Zoning plan

1 file
Zoning Plan2 Jun 2021

Demarcation plan

1 file
Demarcation Plan18 May 2021

Services

Sewerage and drainage

4 files
Sewerage Plan Service Estimates10 Jul 2021Storm Water Plan Service Estimates10 Jul 2021Sewerage Assurance18 May 2021STP18 May 2021

Water supply

2 files
Water Supply Plan Service Estimates10 Jul 2021Water Assurance18 May 2021

Electricity

1 file
Power Assurance18 May 2021

Roads

1 file
Road Plan Service Estimates10 Jul 2021

Service plans

3 files
Service Estimates Applied with HSVP Stamp10 Jul 2021Service Estimates Approval Letter HSVP10 Jul 2021Service Estimates Applied Receiving3 Jun 2021

Approvals and clearances

DTCP licence

3 files
LC IV10 Jul 2021Licence Copy with Land Schedule18 May 2021LOI18 May 2021

Other NOCs and clearances

2 files
Aravali18 May 2021Forest NOC18 May 2021

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration18 May 2021

Money

Accounts and finance

3 files
Cash Flow Statement10 Jul 2021Non-Default Certificate from a CA18 May 2021BR for RERA Accounts18 May 2021

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit2 Jun 2021

HARERA’s orders

HARERA’s orders

1 file
Extension No. 15 of 2023 dated 19.06.202316 Apr 2026

Other filings

Other filings

2 files
Project Continuation- RC/REP/HARERA/GGM/30 of 2021/7(3)/55/2024/14 Dated 08.08.202423 Aug 202437D Rep-110 Jul 2021

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

8 OF 2021 · SIGNATUREGLOBAL DEVELOPERS PRIVATE LIMITED · GURGAON-MANESAR

Licence valid to 4 Mar 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 3 Jun 2021 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

8 OF 2021: 19 parcels, 20.589 acres in all, in Garauli kalan (hadbast 48), tehsil Kadipur.

The licence register prints the same licensed area, 20.589 acres.

  • rectangle 148, kila 148min1 bigha 12 biswa 18 biswansi
  • rectangle 149, kila 149/1min1 bigha 4 biswa 1 biswansi
  • rectangle 150, kila 150min8 biswa 11 biswansi
  • rectangle 151, kila 1511 bigha 10 biswa
Show the other 15 parcels
  • rectangle 152, kila 152min19 biswa 1 biswansi
  • rectangle 155, kila 1551 bigha 15 biswa
  • rectangle 331, kila 331/3/12 bigha 7 biswa 12 biswansi
  • rectangle 331, kila 331/3/31 bigha 14 biswa 8 biswansi
  • rectangle 333, kila 333/32 bigha 16 biswa
  • rectangle 336, kila 3361 bigha 7 biswa
  • rectangle 337, kila 3371 bigha 10 biswa
  • rectangle 338, kila 338/12 bigha 2 biswa 5 biswansi
  • rectangle 342, kila 3421 bigha 17 biswa
  • rectangle 343, kila 3433 bigha 4 biswa
  • rectangle 344, kila 344/111 biswa 7 biswansi
  • rectangle 347, kila 347/11 bigha 15 biswa 17 biswansi
  • rectangle 348, kila 348/12 bigha 2 biswa 3 biswansi
  • rectangle 346, kila 346/22 bigha 16 biswa 13 biswansi
  • rectangle 331, kila 331/3/2min1 bigha 5 biswa 1 biswansi

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 23 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Garauli kalan (hadbast 48), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as rectangle 148, kila 148min.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan2 Jun 2021

Layout plan

1 file
Latest Layout Plan18 May 2021

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (28 in all), none is a building plan, a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1621 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Signatureglobal Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.