Skip to content

Sports Ville

by HCBS Promoters & Developers · Gurugram

Not on our price list yet

About this project

Key facts

Location
Gurugram
Carpet area
321–519 sq ft
In m²about 30–48 m², as declared
Registered
19 Sep 2017
Registered by
HCBS PROMOTERS & DEVELOPERS PVT LTD.the company that filed it, for HCBS Promoters & Developers
Timeline
  1. 19 Sep 2017Registered with HARERAHARERA, read 4 Nov 2026
  2. 18 Sep 2021Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

1,096homes, 321 to 519 sq ft of carpet area
  • Under 1,000 sq ft321–519 sq ft1,096

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside27,049 m² in all, by use
  • Apartment buildings8,796 m² · 33%
  • Roads7,776 m² · 29%
  • Green belts4,882 m² · 18%
  • Other uses2,553 m² · 9%
  • Parking2,237 m² · 8%
  • Sewage and waste treatment453 m² · 2%
  • Electricity sub-station352 m² · 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningAIR conditioning socket to be given in master bedroom and drawing room
  • KitchenDesigner glazed ceramic tile up to 2'-0" height above counter and stainless single bowl sink
  • LiftsLift has BEEN installed with all safety measures.
  • WardrobesNot provided
  • FloorsVitrified tile
  • WallsAcrylic distemper on all the internal walls
  • BathroomsAll saintary fittings are of good quality as per the sheet of makes attached.
  • Windows5 MM thick glass on window

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: SECTOR-2 & 23 SOHNA

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1
  • Other register states: 1

Questions buyers ask

Is Sports Ville registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 228 OF 2017, registered on 19 Sep 2017. The register’s record shows an end date of 18 Sep 2021. The register shows it as: Registration lapsed.

The source ↗
How is the connectivity around Sports Ville?From the records · HARERA, read 4 Nov 2026

Sports Ville is in Gurugram; the site address declared to HARERA is Sector-2 & 23 Sohna. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Sports Ville?From the records · HARERA, read 4 Nov 2026

Sports Ville is a HCBS Promoters & Developers project, registered by its company HCBS PROMOTERS & DEVELOPERS PVT LTD..

The source ↗HCBS Promoters & Developers's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Sports Ville: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 228 OF 2017: Registration lapsed. The register’s record shows an end date of 18 Sep 2021.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 15 OF 2014 is on the DTCP register: Licence lapsed; the register prints its validity to 9 Mar 2020.DTCP, read 3 Nov 2026
The court record of HCBS Promoters & Developers’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 15 OF 2014 lapsed

    Named in this project’s application. Valid to 9 Mar 2020; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 18 Sep 2021. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 10 HARERA files, with the dates we read them
Registration no.
228 OF 2017
Registration date
19 Sept 2017
Registration valid till
18 Sept 2021

Declared by the promoter to HARERA

Land area
6.85 (Acre) (27,720.97 sq m)
FAR
the application prints 224.83, which is not a ratio
licence
15 of 2014 ( 09-06-2019) RENEWAL 15 OF 2014 ( 09.01.2020)
Estimated project cost
₹181.90 crore
Cost of land
₹49.41 crore
Declared inventory · 4 types

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK TYPE A · 364 units · 48.253 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2 BHK TYPE B · 364 units · 48.229 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 1 BHK TYPE A · 184 units · 30.119 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 1 BHK TYPE B · 184 units · 29.844 sq m carpet · one flat
Statutory approvals, as declared · 11

Statutory approvals, as declared

  • I. LICENSE & ZONING — declared: already been obtained (10 Jun 2014)
  • II. BUILDING PLAN APPROVAL — declared: already been obtained (1 Oct 2014)
  • III. ENVIRONMENT CLEARENCE — declared: already been obtained (20 Feb 2015)
  • IV. FIRE FIGHTING SCHEME — declared: already been obtained (16 Jul 2015)
  • V. POLLUTION CTE NOC — declared: already been obtained (19 Jun 2015)
  • VI. AIRPORT NOC — declared: already been obtained (1 Sept 2014)
  • VII. FIRE NOC — declared: already been obtained (16 Dec 2019)
  • VIII. DG NOC — declared: already been obtained (28 May 2019)
  • IX. ELECTRICAL NOC — declared: already been obtained (28 May 2019)
  • X. REVISED BUILDING PLAN APPROVAL — declared: applied for but yet to receive (24 Apr 2019)
  • XI. OCCUPATION CERTIFICATE — declared: applied for but yet to receive (29 May 2019)
On file with HARERA · 10 files

On file with HARERA (10)

Plans

Site plan

1 file
Approved Site Plan4 Jan 2020

Layout plan

1 file
Latest Layout Plan4 Jan 2020

Zoning plan

1 file
Zoning Plan6 Jan 2020

Building plans

1 file
Approved Building Plans, Full Set6 Jan 2020

Services

Service plans

1 file
Service Plans on the Layout4 Jan 2020

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule4 Jan 2020

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration6 Jan 2020

Money

Accounts and finance

2 files
Cash Flow Statement6 Jan 2020Non-Default Certificate from a CA6 Jan 2020

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit6 Jan 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

15 OF 2014 · Randhawa Construction Pvt. Ltd. · Sohna

Licence valid to 9 Mar 2020

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 6 Jan 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

15 OF 2014: 11 parcels, 6.85 acres in all, in Sohna (hadbast 187), tehsil Sohna.

The licence register prints the same licensed area, 6.85 acres.

  • 29//19/2 min west2 kanal 14 marla
  • 29//208 kanal
  • 29//22/12 kanal 14 marla
  • 30//147 kanal
Show the other 7 parcels
  • 30//154 kanal 19 marla
  • 30//168 kanal
  • 30//178 kanal
  • 39//1/2 min east4 kanal 11 marla
  • 39//2/25 kanal 17 marla
  • 39//3/1/11 kanal 3 marla
  • 39//8/1/21 kanal 18 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Sohna (hadbast 187), tehsil Sohna. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 29//19/2 min west.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan4 Jan 2020

Layout plan

1 file
Latest Layout Plan4 Jan 2020

Building plans

1 file
Approved Building Plans, Full Set6 Jan 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (10 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1168 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on HCBS Promoters & Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.