Skip to content

SUKHAVAS RESIDENCES (A UNIT OF S R PARYAVARAN ENGINEERS PVT LTD)

by S R Paryavaran Engineers · Panchkula

Not on our price list yet

Possession 31 Mar 2028 · as the developer declared it to HARERA

About this project

Key facts

Location
Panchkula
Carpet area
about 875 sq ft
In m²about 81.3 m², the average flat, as declared
Registered by
S R PARYAVARAN ENGINEERS PRIVATE LIMITEDthe company that filed it, for S R Paryavaran Engineers
Timeline
  1. 20 Jan 2025Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Mar 2028Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside2,438 m² in all, by use
  • Apartment buildings2,438 m² · 100%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningSplit AC daikin, BLUE STAR, O general, mitsubishi or similar
  • KitchenWorking counter with modular box panasonic, indoline or similar
  • Kitchen appliancesISI STD CP fitting grohe, kohler or similar
  • LiftsISI STD lift KONE,schindler, OTIS, hybon or similar
  • WardrobesWooden box plywood century, greenply or similar
  • FloorsMarble /tile flooring/wooden flooring marble, indian/ imported make, tile- kajaria, simpolo or similar
  • WallsPlastered & paint finish asian, berger, dulux or similar
  • BathroomsCP fitting kohler /jaquare/ grohe/hindware or similar

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Bhumiq holds no map point for this project yet.The site address declared to HARERA: PLOT NO GH-16, SECTOR-24, URBAN ESTATE, PANCHKULA

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Questions buyers ask

Is SUKHAVAS RESIDENCES (A UNIT OF S R PARYAVARAN ENGINEERS PVT LTD) registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as HRERA-PKL-PKL-689-2025. Valid to 31 Mar 2028.

The source ↗
What is the possession timeline for SUKHAVAS RESIDENCES (A UNIT OF S R PARYAVARAN ENGINEERS PVT LTD)?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Mar 2028. Its registration runs to 31 Mar 2028; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around SUKHAVAS RESIDENCES (A UNIT OF S R PARYAVARAN ENGINEERS PVT LTD)?From the records · HARERA, read 4 Nov 2026

SUKHAVAS RESIDENCES (A UNIT OF S R PARYAVARAN ENGINEERS PVT LTD) is in Panchkula; the site address declared to HARERA is Plot No Gh-16, Sector-24, Urban Estate, Panchkula. Bhumiq has not measured its distance to the main roads and metro lines yet.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building SUKHAVAS RESIDENCES (A UNIT OF S R PARYAVARAN ENGINEERS PVT LTD)?From the records · HARERA, read 4 Nov 2026

SUKHAVAS RESIDENCES (A UNIT OF S R PARYAVARAN ENGINEERS PVT LTD) is a S R Paryavaran Engineers project, registered by its company S R PARYAVARAN ENGINEERS PRIVATE LIMITED.

The source ↗S R Paryavaran Engineers's projects and court record

The records

What the registers hold for SUKHAVAS RESIDENCES (A UNIT OF S R PARYAVARAN ENGINEERS PVT LTD): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration HRERA-PKL-PKL-689-2025: Registered. Valid to 31 Mar 2028.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Plans approved, as the developer declared: layout plan 20 Jan 2025, building plans 20 Jan 2025.Declared to HARERA, read 29 Oct 2026
The court record of S R Paryavaran Engineers’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 7 HARERA files, with the dates we read them
Registration no.
HRERA-PKL-PKL-689-2025
Registration valid till
31 Mar 2028
Declared possession
31 Mar 2028

Declared by the promoter to HARERA

Land area
2437.50 (Sqr/mtrs)
FAR
2 proposed of 2 permissible
licence
MEMO NO. CTP/DTP(PB)/PT/20876 DATED 20.01.2025 ALLOTED BY HSVP
Estimated project cost
₹34.51 crore
Layout plan, declared approved (field 5a)
20 Jan 2025
Building plans, declared approved
20 Jan 2025
Construction to start
1 Apr 2025
Completion declared for
31 Mar 2028
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 30 units · 2,437.5 sq m carpet · 1 tower · total for 30 flats, about 81.3 m² each
Statutory approvals, as declared · 1

Statutory approvals, as declared

  • I. MEMO. NO. CTP/DTP(PB)/PT/20876 — declared: already been obtained (20 Jan 2025)
On file with HARERA · 7 files

On file with HARERA (7)

Plans

Site plan

1 file
Approved Site Plan17 Feb 2025

Layout plan

1 file
Latest Layout Plan17 Feb 2025

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule5 Mar 2025

Money

Accounts and finance

2 files
Non-Default Certificate from a CA5 Mar 2025Balance Sheet of Last 3 Years5 Mar 2025

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit5 Mar 2025

Other filings

Other filings

1 file
Statutory Approvals5 Mar 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared MEMO NO. CTP/DTP(PB)/PT/20876 DATED 20.01.2025 ALLOTED BY HSVP. We could not read a licence number from that, so nothing is claimed about it here.

declared in the registration application (Form REP-I), Panchkula bench · submitted 5 Mar 2025 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/1 · fetched 4 Nov 2026

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan17 Feb 2025

Layout plan

1 file
Latest Layout Plan17 Feb 2025

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (7 in all), none is a building plan, a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3316 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on S R Paryavaran Engineers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Panchkula records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.